Professional Documents
Culture Documents
Peabody Design Guide - Complete - Low Res Web Min
Peabody Design Guide - Complete - Low Res Web Min
Design Guide
July 2018
How to use this Document
04 Communal Facilities
Car Parking 57
Features of the Home
Private Amenity Space 81
Cycle Storage 58 Windows 83
Waste Management Strategy 58 Services 84
Community Facilities 59 Security 84
Communal External Amenities Design for Different Tenures 85
Green Infrastructure 61 Mixed Tenure Communities 86
Public Open Space 62 Affordable Rent 87
Communal / Podium Gardens 64 Shared Ownership 87
Play Areas 66 Private Sale 88
Roof Gardens 67 Private Rental Sector 89
Operation & Estate Management Key Worker Housing 90
Services Systems 69 Specialist Housing 91
Care-taking Facilities 69 Specialist Housing Key Principles 92
Estate Maintenance & Management 69 HAPPI Design Principles 93
Example of Care-taking Facilities 69 Non-residential Uses 94
The Home 70 Mixed Use Communities 95
Home Layout & Rooms Commercial Units 96
Layouts
Circulation
72
74
05 Appendix
Living Spaces 74 Summary of Key Requirements 99
Kitchens & Dining Areas 75 Design Principles & Aims for Extra Care 106
Bedrooms 76 Design Guide Credits 107
Home Offices 77 Bibliography108
Bathrooms & WCS 77
List of Abbreviations 109
Storage 78
Laundry 78
Adaptable Homes 79
Working with architects and planners, and together This Design Guide is intended primarily for our
with the public and private sector, we have project teams, including architects and designers,
commissioned many award-winning, notable to show our core principles and ambitions in
developments that continue to make a significant developing new homes and neighbourhoods.
contribution to the rich and diverse architecture in The message to contractors, local authorities,
and around London. our development partners, and others, is that we
are serious about design, and by drawing on our
We believe that good design is fundamental to
wealth of experience as an established housing
creating places where people want to live. This is
provider, we know what is successful and practical
why we place such importance on making sure
for the people who live in our homes.
our developments foster well-being through high
quality homes, well-planned neighbourhoods, and Our commitment to the quality of what we build is
links to amenities and community facilities. primarily focused on the experience of our residents
living in our homes. However, we also recognise
As a major London developer, we have ambitious
the contribution our schemes make to the fabric
plans to build many more homes. Where we can,
of London. By listening to our residents and truly
we will maximise the number of low cost rented
understanding what it means to them, we will invest
homes for people on average incomes or lower.
in good quality from the beginning.
We are clear that the homes we build for sale help
us to generate income to fund the delivery of new As a long-term investor, we know that good design
affordable homes. makes sense from a commercial perspective as
well as creating the communities of tomorrow and
With a focus on using efficient layouts and
adding to the vibrancy of the areas in which we
cost effective materials to promote long term
work. We will use our knowledge and experience
sustainability, we aim to build homes that are safe,
alongside external expertise to establish Peabody
easy to maintain, energy efficient and flexible for
as an organisation known for placemaking.
the changing needs of our residents. Brendan Sarsfield
Chief Executive
George Peabody, whose endowment established Family Mosaic’s history goes back to the early Blackfriars Estate, Henry Astley Darbishire
the Peabody Trust in 1862, defined its mission as 1960s, when Rt Rev Eamon Casey was appointed
director of the Catholic Housing Aid Association.
“to ameliorate the conditions of the poor
Also a founding member of the charity Shelter,
and needy of this great metropolis and to
his dedicated work had a profound impact on
promote their comfort and happiness.”
raising awareness for the continuing problem of
From the outset, providing new well-designed homelessness. Volunteers from the Association
homes was identified as being the most effective held weekly advice sessions for families – Catholic
way of achieving this mission, and from the 1860s or not – who found themselves in difficult housing
– 1880s, Peabody developed a series of estates situations. Subsequently the Association began
which provided safe and healthy homes. to buy and convert houses, and in 1963 the
150 years on, these estates remain familiar organisation’s name was changed to 'Family
landmarks around London, still providing homes Housing Association'.
and sustaining communities - demonstrating a Also in 1963, the 'New Islington & Hackney Housing
durability and resilience that are a testament to Associations' established. Over time New Islington
the quality of their original design and construction & Hackney Housing Association continued to
and reminding us that decisions we make today grow and in 2004 was re-branded as Mosaic. Both
are going to last for many generations. These organisations grew from their early roots supporting
early estates provide a legacy which we aspire to their local communities to become successful
emulate in our current development programme. regional housing associations before merging to
In 2017, Peabody merged with Family Mosaic, form 'Family Mosaic' in 2006.
bringing together the combined legacy of
three pioneering housing charities to create an
organisation that provides homes and services to
more than 111,000 residents across London and The
South East.
Peabody Today
We have built a reputation for
quality and innovation.
This has posed some serious challenges in terms of to develop these homes successfully within more • ensuring that communities see the benefits
the city’s infrastructure, not least in terms of housing complex developments. of growth, and by enabling broader public
supply. A deficit in housing supply has led to house participation in how the city changes
The Mayor’s London Plan has established the
price inflation outstripping wage growth, leading to
Good Growth by Design, 2017 programme. This not This recognises that to accommodate the required
housing becoming increasingly unaffordable.
only sets an ambitious target of providing 66,000 growth, London is seeing more complex and
At the same time, a combination of the right- new homes a year in London, many of which will denser schemes coming forward and that such
to-buy schemes and the reduction in public need to be affordable rent, but also establishes schemes require careful attention, guidance and
investment in social housing, has led to the number qualitative principles within which this growth scrutiny of design.
of new affordable homes being provided falling should be framed:
It is important that lessons are learned from the
as demand grows and the percentage of the
population priced out of the private sale market
• creating an inclusive city that supports health rapid growth in housing supply in the 1960s and
and well-being for all 1970s which has left a damaging and costly
increasing year on year.
legacy of social and technical problems. Within
In response to these challenges, and together
• supporting everyone to fulfil their potential, by this context the quality and sustainability of the
providing inclusive access to transport and other
with the need to generate cross-subsidy funding homes and the communities that are developed in
public services
to ensure the affordability of homes we deliver, response to the current challenges are vital to their
Peabody is no longer developing the mono-tenure • supporting and enriching public and civic long-term success.
estates that were the cornerstone of Peabody’s spaces – allowing for vitality and change whilst
original mission. sustaining and strengthening the character of
London’s existing neighbourhoods
The focus of our development programme has The quality and sustainability of
now moved to creating mixed and integrated • creating partnerships between the public and
communities, providing homes for affordable rent, private sector – to yield wider benefits of change the homes and the communities
shared ownership and other intermediate housing
• making London healthier; with clean air, easy that are developed in response to
options and private sale, together with commercial access to green space and more efficient the current challenges are vital to
and community facilities to meet a broad range of buildings supplied by cleaner energy
housing needs. Whilst this Design Guide focuses on their long-term success
the quality of our homes, it also reflects the need
70,000
people per
year, requiring
66,000
new homes
London’s annual
population growth
(Good Growth by Design, 2017)
As part of the merger, all Family Mosaic homes and The only areas of difference that will vary outside
supported housing schemes outside of London London, relate to:
have been transferred to a subsidiary. Peabody
will continue to work with local authorities in the
• Consideration to local housing need, and market
conditions with regards to the range of homes
south east to build on Family Mosaic's reputation
and tenures to be delivered on particular sites or
for developing good quality homes which help
in particular locations.
address local housing needs. Furthermore, by
utilising our experience in delivering supported • Compliance with local planning policy, and how
housing, we aim to provide high quality this may differ from the London Plan and the
accommodation and care for those with additional Mayor’s Housing SPG, in terms of sustainability
needs. (Energy, Air Quality, Renewable Energy
Requirements, etc.) that will not have negative
The guidance within this document presents our
impact on residents.
requirements for all future schemes and is to be
equally applied across our whole development • Where Homes England has a requirement that
programme without differentiating between those is not required as part of the GLA grant funding
developments built in London or outside. This programme or has not already been included in
means all existing and future residents can expect this guide.
the same high standards, quality, and services
• The provision for car parking in recognition of
regardless of where they live. location, lack of access to public transport
and the greater distances that residents have
to travel daily that may exclude other more
environmental forms of transport (cycling).
Provision will be based on local planning
guidance, market feedback and PTAL rating.
This Design Guide describes how Chapter 2 - Achieving Design Quality Upton Village, Plaistow Hospital, PCKO
quality design will support Peabody’s
This chapter outlines Peabody's
mission and its ambitions to support
approach to achieving design
the Good Growth Agenda and
quality, as well as the design
recognise the scale of the challenge
considerations, processes and
facing the city. It will guide those
partnerships which form the starting
within Peabody who commission
place for all future schemes.
or procure new homes and the
Consultants, Developers, Joint Chapter 3 - Core Design Principles
Venture Partners and Contractors who In order to achieve our desired
are engaged to support Peabody's design quality, this chapter presents
development programme. Peabody's encompassing core design
The guidance within this document principles, which should be upheld
is structured across three chapters. throughout all our future design
All future design proposals should proposals.
encapsulate the guidance and Chapter 4 - Peabody Key
aspirations set out within each Requirements & Design Guidance
chapter so as to embody the
Peabody vision for homes and This chapter provides detailed
communities, and deliver great requirements, and supporting
places to live. guidance to inform detailed
design proposals which will create
attractive, functional and sustainable
developments, and fulfil Peabody's
aspirations, core design principles and
achieve design quality.
1. Celebrate the heritage of Peabody and 4. Create exemplary buildings and open 9. Support family life, and individual health
Family Mosaic and continue our legacy of spaces that inspire, delight, respect and and well-being within our communities by
high quality buildings and places; give pride to those who visit, live, work and creating safe and healthy environments that
play in them; value privacy as well as sociability;
2. Create inclusive places designed for all
to use and promote equality, diversity 5. Provide homes that are safe, secure and 10. Create sustainable homes and
and social cohesion through mixed and efficient to run. communities, to provide the maximum
balanced communities, and tenure blind benefit to our residents and future
6. Build the best homes and communities we
design; generations;
can, which meet the needs of our residents
3. Respond to the existing character, identity now and in the future; 11. Use excellent materials that withstand
and culture of an existing place, and weathering and use, which function
7. Engage with local residents and
make a positive contribution to the wider superbly, last a long time, and allow our
stakeholders throughout the design process;
community by developing beautiful schemes to be as efficient, and cost-effective
buildings which respect their surroundings, 8. Work as a team to produce high quality as possible.
along with outstanding public realm; design solutions that give us the competitive
advantage;
Procurement (page 1 of 2)
All schemes should be designed Consultation with Key Internal Operational Design Panel (ODP) Capital Management Group (CMG)
in accordance with the design Stakeholders
Project-focussed group meets Following the ODP meetings, schemes
principles, key requirements
In developing the brief, and fortnightly to review: will be submitted at strategic stages
and guidance set out within this
throughout the design development throughout the project programme
document, along with Peabody’s
process, it is important that we fully
• Typical design matters, detailed to the CMG, so as to review them
Employer’s Requirements. These specifications and variations to
consult with Peabody’s internal against Peabody's strategic plans
will form part of the brief to our standard Employer's Requirements
clients and stakeholders, giving an and financial models before receiving
Architects. The process of reviewing
opportunity for them to comment on • Updates to design proposals approval to proceed.
each of our projects explores how the
the evolving design and outline their
buildings and places can best meet • Post occupational surveys and Outcomes from the design review
specific design requirements. resident feedback
the needs of the people who will process and the ODP will be made
use them by improving the quality of This Design Guide represents the The ODPs are organised and serviced available as part of the reports made
design throughout the scheme. agreed standard requirements from by the Design and Quality Team to the CMG when schemes are
our internal stakeholders, and as (D&QT), and consist of a single submitted for approval.
The Design Review Process is
such will form part of the brief for representatives from:
separated into three stages of review Separate from the design
any project and a benchmark for
and authority: review process and programme
assessing design proposals. • Housing Management & Estate
Services management exercised by the CMG,
Consultation is an on-going process as part of the general governance
as design development continues • Sales and Marketing and oversight of the direction of
into the construction phase on D&B • Supported Housing (when Peabody’s development programme,
projects. Our internal stakeholders are applicable) there are regular meetings of
all represented on the Operational Peabody’s Board Design Panel. This
Design Panel. When a scheme goes • Housing Options gives the Board an opportunity to be
to ODP at each gateway stage • Asset Management PPM Team & briefed on the design of particular
this should be the conclusion and Compliance Team schemes and assess whether these
summary of consultation that has are in line with the organisation's
occurred at that stage.
• Health & Safety Team & Fire Team broader aspirations.
ODP CMG
Introduction
At Peabody, we believe that creating high quality
environments, with active public realm and distinctive
architecture, is essential to creating safe and desirable
communities that make a positive and lasting
contribution to the neighbourhoods in which we work.
The Core Design Principles identified These encompassing themes form the
within this chapter summarise our basis for all future design, reflecting
commitment to investing in people a holistic approach to shaping great
and their communities. We have places that people can identify
identified five design principles which with, which build characterful and
inform the Key Requirements and spirited communities, deliver lasting,
Design Guidance contained in the sustainable and affordable design
next chapter: solutions and promote secure and
safe environments. Moreover, they
Identity
represent Peabody's aspirations and
Community ambition for our current and future
Sustainable Design communities.
Safety
Affordability We want to make a
positive and lasting
contribution to the
neighbourhoods in which
we work
Identity
Peabody developments should have a distinctive
identity, where the mix of uses, built form and public
realm respond to and reinforce an existing or
emerging context to create a strong sense of place.
Identity
Creating Places with Identity & Character
The design of new communities should seek to
reflect the best aspects of existing local character
and integrate well with the surrounding area,
while also projecting a sense of its own identity. A
place's unique character is defined not only by the
architecture of the buildings, but also by the space
around them and is affected by factors such as the
quality of vegetation, paving, lighting, furniture and
security.
Sustainable Design
Sustainability is an important characteristic for new
developments – as applicable to their physical and
environmental sustainability as it is to social resilience
of their communities.
Sustainable Design
Safety
Every resident has the right to see their home as a
sanctuary and a place of safety.
Capital v Life Cycle Costing Efficiency & Buildability Modern Methods of Construction
Unlike private housing developers we, like other Whilst efficiency and buildability on their own In the past we have been at the vanguard of
affordable housing providers, have a long-term will not produce quality developments, they are technical innovations from modular construction
interest in the properties that we develop, both important considerations to ensure that all new to zero carbon housing. We remain committed
as landlords and as housing managers, and as developments are viable and affordable. High net- to modern methods of construction that can
such have a responsibility to keep both rents and to-gross efficiency, low external wall to floor areas improve build quality, reduce waste, speed up
the running costs as low as possible to ensure that percentages, stacking of structures and services construction and reduce costs and we will endorse
they remain affordable. Accordingly, the life-cycle should always be targeted to keep costs down, the use of any such system so long as it is can be
costs of a development have to be given equal to release as much of the scheme's budget as demonstrated that it will deliver tangible benefits
weighting to the capital costs in assessing the long possible on the more tangible qualitative aspects and is supported by a suitable independent
term affordability of a development. Savings made of the scheme that can deliver the most long-term certification.
at design and specification stage can have costly value.
implications over the life of the building. Building
fabric and building services installations should be
robust, long-life and low maintenance. We have a long-term interest in the
properties that we develop
These requirements reflect the new funding How to Use This Guidance Peabody are committed to
standards applicable to the London Affordable
Housing Programme 2016-2021, as set out within
The guidance within this chapter is separated maintaining high design standards
under the following structure of priority:
the London Plan (2016) and Housing SPG (2016), to create homes and communities
as well as responding to the draft New London Key Requirements
which are safe, easy to maintain,
Plan (2017). Whilst the majority of Peabody’s new
These represent Peabody's required design energy efficient and well designed
developments will be in London, for those sites
deliverables for all new residential developments,
outside of London we will seek the same design
regardless of tenure.
standards with the exception of compliance with
the London Plan energy requirements. Design Guidance
Peabody are committed to maintaining This supporting guidance presents a wide variety
high design standards to create homes and of practical and focussed design considerations
communities which are safe, easy to maintain, for the more specific elements of our homes and
energy efficient and well designed. We will communities. Together with the key requirements,
continue to build upon lessons learnt from older these guiding principles offer a practical tool
developments and innovations in the industry, to for internal development teams, designers,
develop community models which embrace the consultants and contractors to ensure Peabody's
change in demographics and lifestyles required standards, quality requirements and aspirations
over the coming years. We hope to maintain high are appropriately incorporated into schemes and
design standards within a changing context, whilst contract documents.
continuing to reflect Peabody's legacy, to create
high quality communities which people are proud
to call home.
Key Requirements
• New Developments should make a • All future schemes should follow the site • The development shall be designed to:
positive contribution to the public realm layout principles contained in Section 1 of
- Include clear legible routes /
by improving connectivity, hard and soft Secured by Design 2016 (or latest version).
wayfinding;
landscape and public amenities where
possible.
• Developments shall ensure that there is - Maximise active façades / active
step-free access across the site, from drop-
ground floors facing streets;
• The design of all roads, pavements, car off to entrance doors.
parking, associated drainage, lighting - Avoid dominance of street level car
and landscaping shall be to the Local
• Developments shall retain existing natural parking, where provided it should be
features such as mature trees, where
Authority’s adoptable standards, whether well overlooked.
possible, to enhance the development.
they are adopted or remain as private
areas.
Design Guidance
Site Planning
• Building design, density and layout should • Variation in building scale and massing increases • Mature trees and planting are to be retained
be appropriate and responsive to the local the level of interest along the streetscene. where possible to help a new development to
character, history and heritage, grain and scale Typically, lower elements should correspond with feel grounded within its setting and encourage
with a thorough appreciation of the surrounding the immediate context, and where appropriate, ecological assets to flourish.
context. taller buildings should be strategically located to
accentuate gateways and key vistas.
• To avoid residents being isolated in the event
• There should be no blank façades onto the of a flood, access routes to and from site and
public realm, so as to create interest, promote • New developments should maximise active buildings should be at least 600mm above
safe and well overlooked streets and public frontages facing onto streets such as shop-fronts, identified flood risk level, where viable.
spaces, and help to prevent crime and the fear front doors, windows etc. to contribute to the
of crime. This includes gable ends of buildings activity of the public realm, and encourage
• Local amenities, public transport, points of
interest and routes to the wider community to be
which should maintain the active facade with social activity and natural surveillance. Ground
accessible by safe, secure and walkable routes,
fenestration and balconies. level street elevations should not be dominated
to encourage physical activity by walking and
by inactive uses such as car parking, bin stores,
• Buildings should be laid out to reinforce a cycle stores, or areas for plant and machinery.
cycling.
traditional streetscene with a clearly defined
• Designs should generally comply with BRE Site
building line with entrances and active frontages • Appropriate building breaks should be layout planning for daylight and sunlight: a guide
facing onto the public realm and share a positive considered to contribute to placemaking and
to good practice (BR209).
relationship to the street. increase the level of sunlight penetration through
the block façade.
• Design proposals should promote community
integration and ensure that new buildings and • Designs should seek to optimise site potential,
streets share a similar scale to surrounding add value and bring added opportunities
neighbourhoods. for a diversity of uses and types of residential
properties within the local area.
Public Realm
• Long-lasting, low maintenance • Public realm should have a clear
materials are essential. function – be it landscaped open
space as a local amenity, play
• Create people orientated spaces areas or public squares or piazzas
with opportunities for seating and
for events.
social interaction.
• Preferred low lux level and Smart • Paving slabs shall not be used in
vehicle access areas. Contrasting
lighting approaches to lighting
surface textures shall be used to
public spaces.
distinguish vehicular and pedestrian
• Where possible, paving materials areas.
and components should be
permeable and be assessed • Consideration shall be given to the
creation of playable environments
according to their whole life costs
throughout the public realm.
and maintenance.
• Access shall be designed • Consideration shall be given at
early design stages for vehicular
throughout the development to
access to each core for removal
take into consideration people
vans, deliveries and maintenance
with mobility, visual and hearing
vehicles.
difficulties. Access must be
provided throughout the site
without the use of steps.
Key Requirements
• Whilst sustainability is important to • Early analysis of overheating risk in • Where communal heating or CHP
Peabody, all sustainability measures accordance with CIBSE’s TM59 Design systems are to be provided these shall be
included in a scheme must benefit the Methodology for the Assessment of designed to Peabody’s Fairheat design
residents of that scheme, be easy to Overheating Risk in Homes (2017) should guide.
maintain and provide long term value be carried out as part of the design
for money. All energy and sustainability process.
• All developments to be at least 'air
quality neutral' and to not lead to further
proposals will need to be fully evaluated
to consider management, maintenance
• Development will ensure a minimum 35% deterioration of existing poor air quality.
on-site carbon reduction beyond Building
and running costs for our residents.
Regulations.
• Where possible, buildings will offer natural
ventilation. If not, MVHR to be installed.
• All design proposals in London will be in • All developments to meet London Plan
accordance with latest GLA policies on
minimum zero carbon targets for carbon
• Non-residential areas of the development
energy and sustainability strategies. to take into account the guidance from
dioxide emissions reduction, meeting this
BREEAM ('Very Good').
• A Fabric First approach shall be requirement via carbon offset payment
adopted, maximising the performance rather than the inclusion of additional • Maximum water use designed to be 105
of components and materials before renewable energy options. litres per person per day.
considering the use of mechanical or
electrical building services.
Design Guidance
Energy
• A Fabric First approach shall be adopted, • CHP should be avoided in schemes of less than • The internal layout of the dwellings should
maximising the performance of components 150 homes. avoid north-facing living spaces. Window sizes,
and materials before considering the use of specifications and shading devices should vary in
mechanical or electrical building services.
• Where appropriate district heating systems accordance with orientation and solar exposure.
should be designed to ensure there is no
• The building envelope should optimise its significant impact on local air quality. • Where supplied, white goods to be at least A
insulation performance (only limited or non- rated.
combustible insulation will be permitted),
• With electricity becoming a green option,
mitigate thermal bridging and be as airtight as
planned changes to SAP and the draft London • Ventilation should be natural, where possible.
Plan increasing the focus on air quality, the The majority of dwellings to be dual aspect with
possible (it is recommended that airtightness not
current advantage of using gas will change. cross-ventilation, single aspect dwellings should
exceed 5 m3/(h.m2) at 50 Pa).
The design and energy strategies for future large be minimised. Mechanical ventilation (if installed)
• Early involvement of energy specialists to review developments should consider both current must be accompanied by heat recovery with
options and identify opportunities and constraints and future London Plan requirements along with summer bypass.
on specific projects and account for masterplan alternatives to gas.
and building design implications.
• LED lighting is required to all communal and
• Opportunities to connect to existing local heat external areas. Internal communal lighting shall
• The energy strategy should follow the networks should be considered, along with the be intelligent, remotely programmable, with self-
energy hierarchy and take the following into use of low grade waste heat from adjoining reporting emergency lighting.
consideration: site constraints, energy profile of sources and heat pumps.
the proposed homes, maintenance and running
• In external areas, obtrusive light should be
cost implications, short and long term carbon
• Where a future heat network is planned but not reduced by implementing the guidance from
yet in existence the development should be the Institution of Lighting Professionals.
emissions, and security of supply.
designed to allow for a possible connection at a
• In schemes of less than 50 homes, the option of later date.
using high performance individual gas boilers
shall be fully evaluated.
Design Guidance
Water Management Materials & Construction Site Waste Transport
• We believe that potable water use reduction • Building elements should be selected with • Each dwelling should include the provision of at
measures are to be at the forefront of water consideration to their environmental impact least 1 cycle parking space, located in a safe,
efficiency strategies. All our homes should be and embodied carbon footprint via the life prominent and well lit location, and if in London,
fitted with water efficient fittings that are fit cycle assessment route. Where it is not feasible meet the required standard.
for purpose, while achieving a design water to undertake a whole life cycle assessment it is
consumption target of 105 l/p/d. expected that roofs, walls (external and internal),
• All developments should facilitate the provision
of registered car clubs and on-street electric
floors (all) and windows achieve a Green guide
• Surface water attenuation should be provided to rating of between A+ and D.
charging points.
avoid placing pressure on existing surface water
drainage infrastructure. • The selection of suppliers and materials should
prioritise natural, locally sourced, recycled
• Green and blue roofs and podiums shall be and reused materials, with supply chains for
considered as a means of managing water
building materials being selected based on
run-off as part of a managed storm water
environmental and ethical certifications.
solution, and in support of good SuDs design.
The benefits these features provide include • All developments to have a Site Waste
providing usable amenity space, replacing lost Management Plan, with the target of diverting
habitat, and increasing biodiversity and thermal from landfill of at least 80% (tonnes) of waste
performance. Expert advice should be obtained being produced on site.
in the design and selection of the appropriate
roof type to meet the specific requirements of
the scheme, with consideration given to their
benefits, and the structural and waterproofing
requirements associated with the various types
of green and blue roofs – Extensive / Intensive /
Biodiverse /Blue Roof and Podiums.
Design Guidance
Overheating
• Understand risks and address • Landscaping is an effective Other
through design methodologies way to provide solar protection. 1. PREVENT Considerations
reflecting guidance set out within Deciduous plants will provide shade solar gain
• social aspects
CIBSE TM59 as part of the design in the summer and allow daylight
• usability
process. penetration in the winter. Plants
• cost
and soft landscaped areas will
• Shading devices should be used increase local evapotranspiration • maintenance
to mitigate the occurrence of • aesthetics
helping to reduce heat island
overheating. Internal shading
effect.
solutions such as curtains and/
or blinds are less efficient, and • The benefits of thermal mass should
preference should be given to be considered in the design, e.g.
the use of external solutions: concrete floors and clay bricks. 2. DELAY
heat gains
horizontal shading for south facing These measures must be used in
façades (e.g. shutters, brise soleil, conjunction with secure night time
overhangs, etc.), and vertical purge ventilation. 3. MINIMISE
internal gains
shading solutions for west or east-
facing façades (e.g. fins, vertical
• Light coloured and reflective
finishes will increase the albedo
louvers).
effect and help keep local
• In extreme cases, where other temperatures down. 4. PURGE
measures to prevent overheating stored heat
are not possible due to site
conditions. Our preference would
be for a communal system.
Design Guidance
Operational Efficiency, Resilience and
disposal and
Durability replacement
education
Key Requirements
• All new developments should be • All buildings are to have active ground storeys to be fitted with sprinklers –
designed from the outset to meet the floor frontages. refer to Peabody’s Sprinkler Policy
current London Plan and Housing SPG, or and Specification in the Employer’s
other relevant local planning guidance
• Developments should maximise the Requirements (ER's).
number of dual-aspect homes. Single
and comply with CDM 2015 Regulations.
aspect north facing dwellings shall be • All external wall construction including
• The external design of all buildings shall avoided. external cladding systems shall be fully
be 'tenure blind'. non-combustible – refer to Peabody’s ER's.
• Buildings shall be orientated to maximise
• 90% of units to meet Building Regulation exposure to daylight and allow sunlight • Dwellings should be designed so that
requirement M4(2) ‘accessible and into all living rooms for part of the day. sound insulation values are at least 5dB
adaptable dwellings’ & the remaining 10% better that Building Regulations.
to meet Building Regulation requirement
• Buildings shall also consider solar gain
M4(3) ‘wheelchair user dwellings’.
and the potential for overheating, using • Buildings need to consider the following
TM59 methodology. from the outset:
• Buildings shall be designed with sufficient • Buildings should have no more than 8 - Fire Strategy
number of cores to achieve the desired
units per core per floor.
tenure mix, avoiding the need for vertical - Refuse Strategy
separation of tenures. • Developments should target a wall to floor - Cycle Storage
ratio of between 0.7 and 0.8.
• Construction efficiency shall be fully - Access and Security
considered when developing building • Developments should target an overall
layouts to maximise the opportunity for net to gross (floorspace) efficiency of 0.75, - Window Cleaning
stacking units, structural walls, columns with typical residential floorplates aiming • Flat roofs shall be designed with 1100mm
and services. for at least 0.8. high parapet walls wherever possible, to
• All developments of three or more avoid requirements for mansafe systems.
Building Design
• Building design must be specific to the scheme, • Buildings should create mixed communities with
exhibiting architectural quality which responds to a range of housing typologies. Priority should be
the site context and creates a welcoming and given to accommodate wheelchair users and
secure environment. families on the lower levels of the building.
• Access for maintenance should be considered • The provision and design of private amenity
at an early stage, avoiding the need for space shall be appropriate to the building's
specialist equipment where possible. height and location (refer to pages 81-83 for
further guidance).
• Noise disturbance to be avoided through
appropriate stacking of dwellings within • The location of windows and ventilation intakes
buildings and locating similar rooms adjacent should be carefully planned and closely
to party walls (i.e. living rooms next to living aligned with the ventilation, noise, lighting
rooms). Increased levels of noise insulation to and overheating strategies proposed for the
be implemented around lifts and plant rooms building, while being considered in relation to
and sensitive areas to be placed away from external sources of noise and air pollution. Where
communal areas prone to noise. required, solutions to reduce noise nuisance
are to be implemented (e.g. screening with
• Dwellings in close proximity to mechanical plant plants, edges and shrubs, adequate glazing,
need to be adequately and demonstrably
winter gardens, increase distances, installation of
protected from electro-magnetic flux.
acoustic louvers).
Design Guidance
Fire Safety Fire & Rescue Service Access
Note: • Consideration must be given to the ability of When designing buildings, careful consideration
disabled people to escape with dignity, whether should be given to ensuring that the Fire and
The fire safety guidance included in this section
this is to a different fire compartment or the Rescue Service can gain the required access to the
reflects Peabody’s current policy in response to
use of appropriate lifts, in accordance with BS building perimeter and manoeuvre vehicles safely.
the Grenfell fire and Dame Judith Hackitt’s interim
9991:2015. The Fire and Rescue Service should be consulted
recommendations. Following the publication of
at the design stage, prior to a planning application
the final report in May 2018, and whilst waiting for • All external wall construction including external being submitted. Consideration should be made
the Government’s implementation plan on her cladding systems shall be fully non-combustible
to the following whilst consulting guidance in the
final recommendation, Peabody will continue to – refer to Peabody’s Employer’s Requirements
current Approved Document B of the Building
add to this design guidance and publish a future (ER's).
Regulations:
addendum to this section. In the meantime those
• All development of three or more storeys to be
using this section of the design guide should check
fitted with sprinklers - refer to Peabody's Sprinkler • Access to building perimeters.
with the Peabody’s Design & Quality team for any
current updates.
Policy and Specification in the ER's. • Landscape provision which may aid or restrict
access.
• The requirement to install sprinklers is in addition
• Clear fire strategy to be fundamental to the to any other fire safety requirement arising from • Turning and sweep circles of fire service vehicles
design of all new buildings and followed
the Building Regulations and shall be adopted (noting some vehicles are larger than those set
through the design and construction stages. Our
even where the fire strategy indicates that such out in AD B).
preference is for developments to follow the
a requirement is not required to comply with the
guidance in Approved Document B wherever
Building Regulations.
• The locations of gates, barriers and street
possible, before fire engineered solutions are furniture.
considered. • Specialist Housing will require different fire • The impact of any adjacent future developments
detection and suppression systems. Refer to
• Design shall consider the different aspects of fire NFCC's Fire Safety in Specialised Housing, 2017.
on access.
safety under the Building Regulations including
means of escape, spread of fire and access for
fire fighters as part of its Fire Strategy.
The route from the pavement to one's front door is highly symbolic, signifying status, ceremony and a sense
of welcome to the visitor as well as the resident. In all cases, there should be a sense of celebration in the
experience of arrival, expressed in the quality of the design, the materials used and the ambiance created.
Key Requirements
• Entrances to communal cores or • All wheelchair accessible/ adaptable • Communal controlled doors which shall
individual dwellings should be visible from units above ground floor shall be served include main entrance doors, inner
the public realm, clearly identified and by a minimum of two lifts, which are lobby doors to main entrances and other
easy to find, with a direct line of approach designed in compliance with Building external communal controlled doors shall
from the street. Regulations AD Part M. open outwards, where required for fire
egress and shall meet the requirements
• Where possible, communal cores shall • Postboxes shall be Secured By Design of Part M for accessibility, and Secured by
have external windows for natural approved, and located through-the-wall
Design for security.
daylight and ventilation. or in a secure lobby area. They should
• Floor and wall finishes should be made of
be big enough for A4 documents and • Communal Entrance Doors to cores to be
designed to avoid theft through reaching to SBD standards and to BS 6375:2009 Part
robust and hard wearing materials that
in from outside. 2 Medium Service quality.
can be easily cleaned and repaired.
• Where cores contain homes designed • Communal staircases shall be reinforced • Colour video entry-phone system to all
in situ or pre-cast concrete, with straight new flatted developments with KMS fob
to both Building Regulations M4(2) and
flights incorporated wherever possible, access.
M4(3) the whole of the communal area
avoiding winders.
and access shall be designed to M4(3). • There shall be CCTV to all new flatted
developments, overlooking entrances,
post boxes, refuse and bike stores and key
public realm.
Lifts Circulation
Lifts are the largest component of on-going service • Deck access can be considered so long as there
charge. The number of lifts and their specification is defensible space in front of any bedroom or
are important considerations in delivering living room to provide privacy and security.
affordable homes. The ratio of the number of lifts
to the number of units being served needs to be
• No CCTV should be required to communal
corridors but wiring should be put in for
balanced to ensure it is cost efficient, while ensuring
installation in the future if required.
all units are adequately served.
• There should be tonal contrasts in the finishes of
• The Peabody Lift Specification which identifies communal spaces to accommodate for visual
a high-quality lift specification to reduce on-
impairments
going maintenance costs should be used on all
projects. Communal Staircases
• Lifts should be provided to meet planning • Communal stairs should be visible from the
requirements and Building Regulations AD Part M entrance and the lift lobby at each floor to
as a minimum. encourage everyday use and physical activity.
• Wheelchair units should ideally be located on • Communal stairs should have external windows
the lowest floors of the building. All wheelchair where possible with good visibility from the street
accessible/ adaptable units above ground floor to minimise anti-social behaviour.
shall be served by a minimum of two lifts.
• Communal stairs should be steel or concrete and
• Ideally, one lift in each core should be a 13 finishes should be robust and hard wearing to
person lift suitable to accommodate large items reduce on-going maintenance.
of furniture.
• All staircases should allow standard furniture to
• All buildings over seven storeys shall provide at be carried up and not have winders.
least two lifts per core with one being a 13 person
lift suitable to accommodate large items of
furniture and stretchers.
Communal areas can suffer from neglect due to a lack of ownership. All
communal spaces should be durable, clean, and attractive and perform
so well that they engender care, ownership and pride in our residents.
Key Requirements
• Car parking and cycle storage shall be • Landlord’s external doors which shall • Preference is for bins to be collected by
provided in accordance with minimum include doors to plant rooms, refuse the local authority directly from store,
Planning Requirements. stores, bike stores and other amenity rather than a managed collection.
space doors shall be robust standard Refuse store shall not connect to the core
• Cycle storage shall be incorporated into galvanised steel door-sets to comply with internally as this poses a security risk and
the building, be of robust and secure
Secured By Design, either self-finished allows smells to enter the building.
design, but discrete enough to
or painted.
avoid theft. Our preference is for a secure • Cycle and refuse stores shall be discrete
internal store, conveniently accessed from • There should be separate bin and cycle and not detract from the communal
the communal entrance lobby. stores for different tenures. Localised entrance.
smaller stores are preferred to one large
• Storage facilities for waste and recycling store which can be intimidating to enter.
• Suitable access shall be provided for
containers shall meet local authority maintenance equipment for window
requirements and meet at least British • A caretakers store/ workshop shall be cleaning, podium and roof garden
Standard BS5906:2005 Code of Practice for provided in each development as per maintenance, lift servicing etc.
Waste Management in Buildings. Peabody requirements.
Car Parking
• Car parking should be provided to meet • Where possible, podium and undercroft parking
minimum brief, planning requirements and will be serviced via passive ventilation, minimising
relevant Secured by Design requirements. the need for mechanical ventilation and
reducing running costs.
• Disabled Parking Bays should meet planning
requirements and relevant sections of Part M of • Podium and undercroft parking at ground
the Building Regulations. level shall be surrounded by other uses so as to
maintain active frontages along the street.
• All wheelchair adaptable and accessible
dwellings should connect easily to the car park; • Internal car park floors shall have a painted finish
pedestrians should not have to use a vehicle that allows for washing down, and minimises dust.
ramp into a basement.
• Parking spaces for car clubs should be provided
• Parking spaces for motorbikes and mobility where possible along with electric car parking
scooters should be considered, along with drop- bays with charging points as required by the
off points for taxis/ deliveries, space for removal Local Planning Authority. Wall mounted units are
vans and visitor parking. preferred, or post type charging points can be
provided to external spaces.
• Wherever possible, one car parking space should
be provided for caretakers / maintenance • All parking spaces shall be future proofed to
contractors. allow for electric charging points to be installed
at a later date.
• External car parking should be well integrated
into the landscape to avoid dominance of cars. • Vehicle security barriers to car parking should
be robust and effective but consideration must
• Basement, podium and undercroft parking be given to how Fire and Rescue Services gain
should be secure, well-lit with good CCTV
access in an emergency.
coverage. Consider painting car parks and the
use of colour or super-graphics to identify exit
points.
Design Guidance
Cycle Storage Waste Management Strategy
• Cycle parking should be provided to meet brief, • Refer to Building Regulations (AD part H) and for any double handling of bins.
planning requirements, relevant Secured by consult at an early stage with local authority to
Design requirements and TFL’s London Cycling determine any special requirements, method of
• Internal stores should be well lit, be made of
hard-wearing durable materials, and floors and
Design Standards. collection, extent of recycling, etc.
walls should be painted with a finish that will
• Cycle parking should be located as close to • Consideration shall be given to how disabled allow spaces to be washed down.
residential entrances as possible and be easy people, elderly and children access refuse
and convenient to use. stores/ bins.
• Refuse chutes should be avoided.
• Stores should be sized in accordance with BS
• Cycle stores may be accessed from the • There shall be a separate store for bulky refuse on 5906:2005 and local authority requirements, and
communal entrance lobby as long as all surface developments with more than 100 dwellings.
designed with space to allow easy access to all
finishes are robust and there is a direct access off
the lobby.
• Space for disposal and collection of refuse and bins without the need for rotating bins.
recycling should be considered from the outset.
• Doors to refuse and recycling to be galvanised
• Large cycle stores should be avoided and should Poorly considered refuse provision can lead to
steel with louvres or perforations to provide
be split by tenure. Where large numbers of cycle misuse and a detrimental impact on character.
natural ventilation. Particularly when adjacent to
parking spaces are required, they should be
provided in groups of 20-30 bikes.
• Refuse and recycling stores should be located the main entrance, doors to refuse and recycling
as close to residential entrances as possible. stores should avoid appearing utilitarian and
• External cycle stores should be covered Oversized refuse stores should be avoided and be designed to integrate with the architectural
and secure and be well integrated into the stores should be split by tenure. design of the entrance and well integrated into
landscape. the landscape.
• Doors to refuse stores should only be accessed
• Internal cycle stores should be secured with from outside. Where this is not possible, there shall • Stores to have good signage identifying different
fob operated locks, well-lit with good CCTV be a secure ventilated lobby between the core refuse and recycling bins, and be provided with
coverage. and refuse store for security and to avoid smells a tap and gully.
from refuse entering the building.
• In buildings without a lift, each unit should be • Proprietary underground waste storage solutions
provided with a secure storage area at ground • Refuse stores should have level access and be should be considered where the local authority
floor that can accommodate a buggy. close enough to collection point to avoid need offers collection services.
Community Facilities
• Where viable on larger schemes
a Tenants Association Room or
Community Centre should be
provided to support Peabody’s
community programme and foster
a sense of community in a new
development.
• Community facilities will be subject
to individual briefs, but irrespective
of scale should be provided with a
lot of lockable storage, dedicated
WCS and kitchenette and robust
and hard-wearing finishes.
• The management of community
facilities will be key to their success
– but even a modest facility can
play an important role in supporting
residents of new communities.
Communal open spaces should be provided on larger schemes to provide access to outdoor space for play
and other leisure activities. They should be vibrant, inclusive, sociable and environmentally rich open spaces
which people enjoy spending time in. They should foster a sense of ownership so residents take pride in their
upkeep making them self-regulating, integral and sustainable parts of the community.
Key Requirements
• Sufficiently detailed landscape design • Communal amenity space shall be • Proposals should reflect current good
and specification required at planning provided wherever possible at street or practice and the London Plan's priorities
stage to establish the quality and scheme podium level. Communal roof gardens and this should treat the landscape as
approach, including external lighting should be avoided above affordable 'green infrastructure' and consider the
layout. rented cores. context and any emerging borough wide
strategies.
• Maximise direct sunlight into all open • For developments with an occupancy of
spaces. ten children or more, provide appropriate • Play areas shall be designed to ROSPA's
play provision designed in accordance Code of Good Practice for Play Areas. All
• Ensure all open spaces are well with the London Plan SPG, 'Providing for new equipment used shall conform to EN
overlooked including roof gardens
Children and Young People’s Play and 1176 and surfaces to EN 1177.
wherever possible.
Informal Recreation'.
• Wherever possible, communal open • Play areas must be signed off by an
spaces should be shared by all tenures. • Open space to be designed and accredited RPII play inspector before use.
constructed to Part M of the Building
• Trees should be carefully selected to be Regulations taking into account the
suitable for their location and to allow requirements of wheelchair users and the
for future growth. Semi-mature trees are Equality Act 2010.
preferred wherever possible as they less
susceptible to vandalism.
Green Infrastructure
• A network of green spaces, trees, green roofs • External landscaped spaces and courtyards
and natural or semi-natural drainage features to be located and adequately sized, to ensure
must be planned, designed and managed in appropriate access to sunlight.
an integrated way to meet multiple objectives
including: promoting mental and physical health
• Appropriate consideration to be given to surface
water run-off systems and solutions such as
and wellbeing; adapting to the impacts of
brown, green and blue roofs, permeable paving,
climate change; improving air quality; surface
storage, rainwater gardens, swales and other
water attenuation; encouraging walking
SUDs. The design and landscape strategy should
and cycling; and conserving and enhancing
incorporate measures to reduce flood risk (where
biodiversity and ecological resilience alongside
relevant) and surface water run-off.
more traditional functions of green space such
as play, sport and recreation. • Where possible long lived large canopy tree
species should be planted to support the next
• In small scale developments such biodiversity generation of trees in a neighbourhood.
features should be incorporated within the
detailed landscape design proposals, while • Allotments/food growing raised beds to
on larger schemes, a comprehensive Green be created for the use of residents where
Infrastructure strategy may be required. appropriate.
• The external areas should be designed to cater • Low maintenance trees and planting to offer
to a range of activities, from active spaces year-round interest with native and wildlife
for sports and play, to quiet spaces for quiet friendly species, combining amenity function with
reflection or for the growing of food. ecological benefit.
• Structural planting should be used where possible • Consideration shall be given to incorporating
to reduce toxicity locally around entrances to native plant species and species with interest
buildings and external residential amenity. to wildlife, as well as ecological enhancements
such as bird and bat boxes, perches or similar.
Design Guidance
Public Open Space
• Guidance from the Local Authority Planning • Open space should be child and family friendly • Loose gravel is not permitted in any
Department should be obtained on the amount and promote active and healthy lifestyles that development. Concrete pavers and black
of public amenity space to be provided with encourage walking, running, cycling and provide tarmac pavements are only to be used
a view to addressing any shortfall in the open opportunities for sport (where possible and where minimally.
space and type of facilities available. relevant.
• The materials used must be robust, appropriate
• A Landscape Architect should be appointed • Landscaping should support the restoration of for use, varied in texture and colour, and of high
early into the design process to create a ecological integrity and diverse habitats. quality. Where coloured tarmac and resin-bound
comprehensive strategy and landscape gravel surfaces are used they should be laid in
proposal in consultation with the Employer, Local
• Where possible, open spaces to be designed in small sections for ease of future maintenance.
collaboration with local residents so that it meets
Authority and Police Architectural Liaison officer.
their requirements, promotes ownership and self- • Hardy plant species selected to suit location with
• The provision of open amenity space, as an management, and helps guarantee that it will consideration to a low maintenance regime,
integral part of residential developments, should be well used. seasonal colour, and longevity, final size and
make a valuable contribution towards the quality shape of the chosen plants.
of the development and the character of the
• Where possible, seek to provide multi-functional,
neighbourhood.
multi-use spaces, so as to encourage maximum • All street furniture should be designed as part of
social interaction. a landscape strategy, and not ad hoc clutter.
• Seek to optimise underutilised open space where • Routes through open spaces must be carefully • The location of access covers to underground
possible.
considered to take into account likely use services should be carefully considered to be
• Residential units to be separated from public patterns and desire lines. unobtrusive in the landscaping.
amenity spaces/ paths with private/ semi-private
buffer space.
• Hard landscape features are to be kept to a
minimum, as they contribute to creating a noisy,
harsh and unfriendly environment.
Design Guidance
Communal / Podium Gardens
A communal garden or courtyard should be • A landlord’s water tap shall be provided doe considered so as to not damage paths, paving
attached to every block of flats, as well as private each landscaped area. Consideration shall be or play equipment as roots grow.
amenity space, to provide adequate recreational given to automatic irrigation systems for planted
space for all residents. Communal gardens should areas where required.
• Raised beds or delineated planting should be
principally used to contain materials and clearly
be designed to offer a safe and active community
space which enriches the lives of its residents
• Communal gardens should be open, easy to differentiate areas of planting from footpaths
maintain and manage, and accessible to all. and usable space.
and offers a range of recreational opportunities
accessible to everyone. • Communal gardens should be well defined • Any shrubs and hedges should be designed so
by way of function and use, with appropriate as to allow easy litter picking and provide access
• Landscape design should be considered signage and landscape so as to avoid for maintenance.
alongside the building from the start of the
inappropriate use and mistreatment.
design process so as to create a usable, durable • Large areas of undefined grass should be
and appropriate community asset which can • A variety of formal and informal play avoided as these are often susceptible to
flourish and be well used within its communal opportunities suitable for different age mistreatment and damage through being used
setting. groups and abilities should be offered where for ball games.
appropriate.
• Opportunities should be pursued to collaborate • Pebbles, stones, loose bark and sand should
with residents in the design and maintenance of • Any wood used for furniture or play equipment be avoided as they are easily dispersed and
communal gardens so as to create spaces which shall be rot-proof and fire retardant treated. scattered throughout the open space and
meet the aspirations of those who will use it. building, and are difficult to clean up.
• Hard surfaces to communal gardens should be
• Where possible this should be supported finished with easily jet washable, sealed surfaces • External gyms or adult fitness areas should be
by incorporating gardening and growing without loose materials with an appropriate considered and shall comply with BS EN 1176 and
programmes to bring residents together and drainage strategy. BS EN 16630.
encourage use of the space by all.
• Artificial grass/lawn will be considered for smaller • During the design process, consideration
should be given to how podium gardens will be
• Sensory planting may be incorporated offering communal gardens and those that are heavily
maintained. Storage is required for equipment
experiences to those with visual and hearing shaded.
and tools, with possible separate lift for heavy
disabilities.
• The location of planting should be well equipment and removal of garden waste.
Play Areas
• For developments with a potential occupancy natural play opportunities and structured play
of ten or more children, proposals should be equipment incorporated within the estate
made for the inclusion of good quality, inclusive environment. Equipment and/or landscape
play provision in accordance with the London elements to provide the five standard play
Plan SPG, 'Shaping Neighbourhoods: Play and experiences; swing, spin, slide, climb & balance.
Informal Recreation', 2012.
- There should be plenty of opportunities for
• Low level planting to be located away from, natural surveillance, while consideration
or be protected from, play areas, to avoid needs to be given to proximity to homes in
damage. terms of noise and nuisance for adjacent
properties.
• Play areas to be carefully located to minimise
acoustic issues for residents – close to family units, - Appropriate planting to be considered –
but further away from smaller flats/ older people particularly opportunities to provide shade in
hot weather.
• Play equipment should be robust and easy to
maintain. Sandpits shall be avoided. - Equality Act compliance and proactive
choice of equipment to be inclusive.
• Encourage landscape to be fun and engaging
for children of all ages and abilities, offering - Play equipment including surfacing shall be
formal and informal opportunities for play. installed to relevant BS EN standards.
• Consideration should be given to including a - Seating areas should be provided for
suitable area where ball games can take place, parents and carers.
to avoid damage to plants by ball games on
- Play areas to be designed with two means
unsuitable areas.
of access/ egress wherever possible, to
• Play spaces should be appropriate to the size of avoid opportunities for bullying.
the scheme and allow the user to experience
role play, socialisation and development utilising
Roof Gardens
• Careful consideration should be given to the
design of roof gardens so as to avoid damage,
mistreatment and maintain the health and safety
of residents.
• During the design process, consideration should
be given to how roof gardens will be maintained.
A landlord's water tap shall be provided together
with automatic irrigation system where required,
along with storage for equipment and tools,
and possible separate lift for heavy equipment/
removal of garden waste.
• Large roof gardens should be divided up to allow
multiple groups to use the space simultaneously
and discourage ball games
• Play areas on roofs should be avoided, but
where provided there should be a minimum of
two access points to prevent bullying.
• Wherever possible, roof gardens should be
overlooked to deter anti-social behaviour.
• Roof gardens/ terraces shall have minimum
1100mm high guarding to prevent falls. In windy
locations, these may need to be taller to provide
sufficient comfort.
The long term success of a development will often depend on two factors: the efficient operation of the building
and the quality of the management and maintenance. Through quality design and dedicated upkeep we seek
to create attractive, safe and functional homes for today and successive generations to come.
Key Requirements
• Our preference is for HIUs to be accessed • All developments must include a No. of Dwellings Caretakers Workshop
from communal corridor/ deck access for Caretaker’s WC with a hand wash basin
Served Area
easy landlord maintenance. with hot and cold water.
• BEMS shall be provided in all schemes • In each core or block there should be a 50 - 125 9.5m2
with communal heating Caretakers’s Cupboard with hot and cold
125 - 250 13m2
water, butlers sink which comply with the
• All Landlords meters and supplies shall be Peabody 'Caretakers Area Requirements'.
kept separate from resident’s services and 250 + 15m2
For every 125 units, one of these
caretaker's cupboards.
cupboards shall be a minimum of 3m2.
• Resident’s electricity, gas, water and other
meters shall be positioned so that they are • Developments of 50+ dwellings should
incorporate a Caretaker's Workshop. The
accessible to residents.
workshop and WC can be combined,
• Where there are communal heating pre- however, the area of the WC is in
payment meters, these shall be installed addition to the areas set out on the right.
in accordance with our ERs. Workshops should include a kitchenette
• Access for maintenance should be fully with hot and cold water, space for a
considered at design stage. Maintenance refrigerator and 2 double cupboard units,
access to roofs shall be via communal with space for a table and seating.
areas and not through homes.
Design Guidance
Services Systems Estate Maintenance & Management Example of Care-taking Facilities
• For buildings of 10 storeys and over, landlord's • An appropriate and highly responsive
water points shall be provided at several levels to management and maintenance strategy should
help facilitate cleaning. be devised for all new developments with shared
or communal areas. This will ensure the delivery
• On all floors there should be a lockable landlord's of a secure, supportive and safe environment
electricity supply.
of residents and allow the internal and external
Care-taking Facilities communal spaces to function to their full
Care-taking facilities
potential, and further instil a sense of pride and
• Caretakers are principally in charge of ensuring ownership in those who use them.
the maintenance and upkeep of buildings and
communal spaces throughout a development. • On-going maintenance should form an early
This important service often leads to additional consideration throughout the design process so
contributions to a scheme’s sense of community as to ensure cost-effective care which allows the
as caretakers take pride in the place and the development to function efficiently for residents
people they care for. Appropriate facilities should and landlords.
be provided for caretakers and site managers • The management strategy should be
to encourage this added investment in the appropriately monitored and regularly reviewed
community in which they work. to ensure that the most effective and cost Shower Room
efficient methods are being delivered to achieve
• For landscape maintenance requirements, refer
to section titled 'Communal External Amenities'. the best results throughout the lifetime of the
development.
Lockers
The home should be a sanctuary, a safe place in which to relax, socialise and work. It is a place which supports
family life, builds relationships and nurtures our sense of identity and self-expression. It should be designed with
care, creating a place of pleasure and comfort for residents.
Key Requirements
• All homes to be compliant with current at least 10-15% larger to comply with single beds.
policies and legislation, including Local Building Regulations AD Part M.
Planning Authority’s relevant policies, the
• Homes with 4 bedrooms 7 persons and
London Plan and the Housing SPG, and
• Oversized homes should be avoided – over to have a utility room.
affordable homes to be no more than
the development’s funding requirements.
10% larger than NDSS unless agreed.
• For homes designed for an occupancy
of 5 or more people, there shall be at
• Where there are wheelchair accessible • Minimum floor-to-ceiling height of 2.5m. least one bathroom with WC and one
/ adaptable homes, the scheme must
additional WC.
enable a wheelchair user to live in the unit • Minimum living room widths shall be 2.8m
and use any associated private outdoor for up to 3 people; 3.2m for 4 people or • Second bedrooms should not open onto
space, parking and communal facilities. more. balconies.
• The minimum room areas in wheelchair • All double/ twin bedrooms to be min • 3B5P and larger affordable homes shall
adaptable/ accessible homes shall be 2.75m wide. have a minimum of 2 living spaces, i.e. a
as required by Building Regulations AD living room and separate kitchen/diner.
• Furniture should be indicated on plans
Part M. Wheelchair adaptable/ accessible to ensure good room shapes and good • For schemes with a focus on provision
homes should be located as near to positioning of windows and doors from for older people, the project is to adhere
ground floor as possible. within the unit. In affordable rented homes, to the HAPPI guidelines. For further
• Minimum unit sizes shall comply with only one double/twin bedroom shall be requirements on specialist housing, refer
Nationally Described Space Standards, shown with a double bed. Other double/ to section within this guide titled 'Specialist
however wheelchair units should be twin bedrooms shall be shown with two Housing'.
Key Requirements
• All homes shall be designed to achieve the following minimum • Washing machines shall not be located in open plan living/
room areas: dining/kitchens, and shall be in a separate services cupboard
with the MVHR units etc.
Area (m2) 2p 3p 4p 5p 6p 7p • The following minimum kitchen storage volumes shall be
provided:
Kitchen 6.4 7.0 7.0 8.0 9.0 10.8
Occupancy 2p 3p 4p 5p 6p 7p
Dining Room 4.2 4.7 5.4 6.1 6.6 7.1
Kitchen / Dining 10.6 11.7 12.4 14.1 15.6 17.9 • At planning application stage, dwelling plans shall be shown with
the following minimum length of kitchen worktop (including sink
Living / Dining 15.7 16.9 19.5 21.5 23.2 24.9 and all appliances except washing machine) in order to achieve
the above storage volumes:
Living/ Kitchen/ Dining 23.0 25.0 27.0 29.0 31.0 33.5
Double/ Twin Bedroom 12.0 12.0 12.0 12.0 12.0 12.0 Kitchen worktop (m) 4.5 5.4 5.6 6.4 6.8 7.1
Occupancy 2p 3p 4p 5p 6p 7p
Design Guidance
Layouts
The layout of the home should be simple and • Where open plan layouts are designed, these • Consideration should be given to daylight in
logical, easy to read, with minimal circulation to should consider: kitchens and home offices to help with focused
make the best use of the space available, with all tasks and reduce reliance in artificial lighting.
- acoustic separation between living and
rooms displaying a clear hierarchy.
sleeping rooms; • Furniture layouts should be shown on all dwelling
• A 1 bed apartment should be 6m minimum in - an entrance area that allows privacy from the
plans to ensure good room shapes. Furniture
façade length. Residential rooms to not exceed illustrated shall be as required in Appendix D
front door as well as space for coats and shoes;
8m in depth if possible with sufficient depth to of AD Part M, but shall also include living room
pass daylight tests and have enough natural - clear circulation routes for fire escape, and activity space and dining table circulation space
ventilation. comply with BS 9991:2015 clause 9.7 - Open- as shown in the plans on the following pages.
plan flat design;
• North facing habitable rooms and those in • All dwellings with a private external front
concave corners to be kept to a minimum as - consideration of bathroom location, to ensure door (either at ground floor or in deck-access
these spaces will be subject to lower sunlight and doors do not open directly onto living, dining or schemes) should not enter directly into a
daylight levels. kitchen spaces. habitable room, but instead via an entrance hall.
This allows a place to leave shoes and wet coats
• Open plan layouts (with rooms accessed off • Bathroom/ WC should be accessed from the
hallway or internal corridor, not directly from a and minimises heat loss from habitable rooms
the living space) will not be permitted for
habitable room (except en-suites). when the front door is opened.
affordable rent homes and should be avoided
for shared ownership family homes. A traditional
• Consideration should be given for storage space • Location of structure and services must be
hall arrangement is required to create better for an electric wheelchair or pram inside the carefully co-ordinated with flat layouts to avoid
environments for fire safety and acoustics home. awkward boxing details.
between rooms and adjoining properties.
• Stacking of rooms with similar uses is important
in order to prevent noise nuisance between
tenancies. There should be a buffer zone
between communal spaces and bedrooms.
Example of a 1 bedroom flat Example of a 2 bedroom flat Example of a 3 bedroom flat Space standard for passing
zone around dining table
(London Housing Design
Guide, 2010)
1100
length
Bedroom 2
Living/Kitchen/Dining
Bathroom
HIU
HIU
Living/Kitchen/Dining Space standard for activity
zones in a living room
HIU
Balcony
2000 x 2500
Services Cupboard Services Cupboard Services Cupboard 1800 x 1200
4p dwellings
and larger 1p – 3p
General Storage Cupboard General Storage Cupboard Laundry Cupboard dwellings
Laundry Cupboard General Storage Cupboard
Bedrooms
Like living spaces, the bedroom • There should be space for beds
also fulfils multiple functions apart to be located in more than one
from the simple requirement of a location, and without the bedhead
place to sleep. Teenagers will use under a window.
their bedroom for entertaining and
relaxing with friends. Young children
• There should be a fitted wardrobe
in the main bedroom of all homes,
will play on the floor, while older
regardless of tenure. This should be
children may do their homework at
solidly constructed as part of the
the desk. The bedroom also needs to
partitioning of the room with doors
be big enough to store clothes and
as internal non FR doors. Where
belongings.
there is no convenient alcove or
• At least one bedroom within a recess to accommodate a fitted
dwelling should be capable of wardrobe this requirement should
accommodating a 1500mm wide be checked with Peabody.
double bed with sufficient space
around it to allow a range of users
• Single bedrooms should be
demonstrably suitable for study and
access to all parts of the room.
recreation by older children, and
• The double bedroom should be a large enough to allow occupants
minimum of 2.75m wide, for good to entertain visitors.
access.
• Children's bedrooms should not
• There should be space for an have access to balconies/juliette
occasional cot in at least one balconies.
double bedroom, without
compromising the furniture layout
and accessibility round the room.
Design Guidance
Storage Laundry
The recurring comment from residents • In wheelchair accessible homes Many homes suffer from insufficient • Washing machines shall not be
in new homes is about the need for space needs to be provided to space and consideration about the located at the back of deep
sufficient storage. The design of the store and charge a wheelchair and needs of clothes washing. There cupboards, incapacitating the
home must make provision for this, to transfer from an outdoor chair to must be space for dirty linen, drying storage space in front.`
accommodating for the varying types an indoor one. washed clothes, storing clean
of storage required. clothes, and an ironing board. In
• In 4 bedroom 7 person homes and
• The maximum depth of a storage addition, it is preferable for a washing
larger, there should be a separate
• Storage is to be provided in cupboard is 1m, to allow for
machine to be located away from a
utility room with space for a sink
accordance with the table listed in sensible usage of the space. and two appliances as a minimum.
combined kitchen/dining/living room,
the Key Requirements on page 71. This space can also be used to
• A secure lockable cupboard is particularly in family accommodation.
provide storage.
• Tall storage is required for a to be provided in every home
vacuum cleaner and ironing- for harmful substances, such • In small open plan homes, the • Private gardens should have a
washing machine should be
board, in or adjacent to the as medicines, cleaning and rotary clothes dryer.
located in a separate cupboard to
kitchen. gardening items. This is preferred in
the kitchen.
avoid noise and vibration nuisance. • No public washing lines are
• A separate linen cupboard with permissible in flatted developments.
shelving should be provided. • Cupboards containing washing In affordable rented flats a clothes
machines must be adequately
drier should be supplied to fit over
• Storage space should be provided sized to allow for pipework behind
the bath.
for outdoor clothes, either with the washing machine, and easy
hooks on a wall, or cupboard frontal access.
adjacent to the entrance.
Adaptable Homes
As families grow and residents • The layout of homes should
change, homes should present consider possible future changes
opportunities to appropriately in demographics including design
change along with their inhabitants implications for older people,
maintaining suitable flexibility to cater the able and less able, cultural
to varying needs. diversity, and different family needs,
sizes and dynamics, so as to create
• The design shall consider accessible, inclusive, comfortable
adaptability within homes, i.e.
and welcoming homes for all.
allowing spaces to be modified. It
is preferred that structural loads are • A wheelchair-adaptable home is
carried by party walls or exterior one which can be easily adapted
walls, allowing internal partitions to for residents who are wheelchair
be moved or reinforced relatively users. That is, a home which is
easily. designed to comply fully with the
required standard, but which may
• Maintain the potential opportunity not be fully fitted out with specialist
for twin bedrooms to be split into
kitchen and bathroom fittings
two singles to accommodate
and grab rails. The fit-out may be
growing families and different
delayed until the allocation of a
resident dynamics;
resident and a discussion between
them and their Occupational
Therapist.
Homes should be inclusive of all residents and reflect the needs of the local community as well as anticipate
future requirements. Homes are required to be functional, user-friendly and efficient to run and maintain for the
life-time of the building.
Key Requirements
• Private amenity space requirements • Where there is more than one private • All habitable rooms to have an open-able
should be as per London Plan with at amenity space, the principal one shall window for ventilation – not just patio/
least 5 sq. m for each 1-2 person dwelling relate to the living space. French doors.
and an extra 1 sq. m for each additional
occupant. Preference is for a single usable
• Windows should be designed to be • French doors are preferred to sliding
cleaned safely from inside by residents patio doors, however sliding doors will be
balcony, rather than several smaller ones.
wherever possible, whilst taking into permitted in tall buildings where wind is
• Where adjacent homes have adjoining account a risk assessment to the more of an issue.
balconies, a privacy screen shall be recommendations of BS 8213-1:2004. This
provided between the homes. may override the requirements of Building
• Full height windows in front of kitchen units
or sanitary ware should be avoided.
Regulations Part K and require a cill
• Balconies shall have solid floors and height or guarding at 1100mm high. • Avoid pigeon roosting features.
be effectively drained, with careful
consideration given to location of • If windows can not be cleaned safely from
rainwater pipes on elevations at design inside by residents, a managed window
stage. cleaning solution shall be incorporated
into the design, allowing for abseiling
• All balconies and other private external points, cradles or sufficient space at
spaces to have a minimum depth and
ground level for pole cleaning.
width of 1500mm.
Windows
Refer to page 80 for our key • Opening windows with sill heights
requirements for windows. less than 1100mm should have
appropriate guarding, especially
• Locks, glazing specification and on tall buildings.
construction for all windows and
doors should minimally meet the • Windows to be high performance
requirements of Secured by Design. timber, aluminium or composite
aluminium/timber.
• Window sizes should be maximised
to allow optimal daylight into • Window handles, controls and
dwellings, however this must trickle vents should be located
be balanced with the risk of within reach of a resident seated
overheating and overlooking. in a wheelchair and offer an
appropriate mechanism to
• Full height windows behind kitchen accommodate for those with
units and sanitary ware, requiring
arthritis.
back painted glass should be
avoided. • Any potential obstructions, such
as light fittings and blinds, should
• Opening windows should not be designed such that they
be oversized, making them
do not prevent windows from
heavy, difficult to clean and
opening. Windows should also
causing damage to mechanisms.
have overriding mechanisms for
Manufacturer's maximum sizes shall
restrictors, to allow purge ventilation
not be exceeded.
if overheating occurs.
• Position of opening windows should
be considered for easy operation
and not be restricted by taps,
furniture etc.
Design Guidance
Services Security
The design of all rooms should required to provide international TV etc.) which are readily accessible, • Door locks, glazing specification
carefully consider the location of channels to suit the local resident and easy to understand and use. and door construction should meet
key furniture alongside the practical profile. the requirements of Secured by
location of radiators and sockets.
• All new homes should be fitted with Design as a minimum.
• Meters must be located at a smart energy and water meters.
• The furniture layout should be reasonable location and height for
• All homes to be fitted with high • Design proposals should
shown on all Mechanical and wheelchair-users. demonstrate how habitable rooms
speed broadband and sufficient
Electrical (M&E) drawings, to ensure are provided with an adequate
no conflicts between furniture and
• M & E services should be accessed sockets, to enable home working.
level of privacy in relation to
directly off private circulation areas.
fittings. • Ventilation systems should be neighbouring properties and the
• Where possible HIUs for communal designed to ensure adequate street and other public spaces.
• Flue and air vent locations must heating systems are to be located levels of air exchange rates to
be well considered and shown on
off the communal corridor or avoid the occurrence of damp • Where walls between flats and
elevation drawings from the outset. communal areas, and partitions
near to the flat entrance doors and mould.
between homes are constructed
• Ducted flues from boilers should be so that flow and returns from the
• Smoke detectors should be wired-in of stud-work and plasterboard,
avoided. Where provided, access communal system are minimised
and provided in each dwelling at these separating partitions will be
panels shall be incorporated within flats and allow for easy
all levels. All wheelchair accessible/ reinforced for their full extent as per
as required by regulations and access for maintenance.
adaptable flats should contain SBD Guidance, to offer sufficient
inspection.
• Mechanical ventilation systems an LD1 fire detection and alarm resilience to withstand criminal
• Phone points should be located are to be carefully located so they system. attack as recognised in Approved
next to Sky points. are easily accessible for scheduled Document Q.
checks and home visits and not
• Carbon monoxide monitors are
• Connections are required for adjacent to bedrooms.
required in every room with a
Digital Audio Broadcasting (DAB), ducted gas flue or gas appliance.
Freeview, terrestrial and Sky TV. • All occupied rooms should The monitor must be wired in to the
have individual home heating electricity supply.
• Sky Q and IRS provision is required. and ventilation controls (fans,
In addition, a second satellite dish is
thermostat, TRVs programmers,
Design Guidance
Private Rental Sector Example of a PRS flat
This relatively new model of housing delivery is • Maximising the number of units per core/
aimed at easing the pressure of the housing crisis floor, while carefully considering the aspect
HIU
by providing high-quality housing developments and property orientation, leading to a more
where all properties are built for rent, not sale. efficient building which maintains optimal levels Bathroom 2 Bathroom 1
Buildings designed for PRS are usually exclusive to of daylight and sunlight and offers residents
this tenure option, offering lifestyle opportunities pleasing views from their home. Living/Kitchen/Dining
to create an active community with a range of
residents' facilities.
• Unit sizes need to be carefully considered and
related to rental income and market demand.
While these developments will be subject to
a specific brief, the design specification is
• Flexibility in the layout of the homes is important, Bedroom 2 Bedroom 1
allowing buildings to accommodate for different
typically the same as Private Sale. The following
modes of internal arrangements and the
considerations may additionally influence their
needs of different tenures, whether it's young
design:
professionals who are sharing or families.
• Close to good transport links - In London • Homes with three bedrooms or more to have
Balcony
preferably within 10 minutes' walk of a train
at least one en-suite, a family bathroom and
station.
guest WC. This may increase to a bath space per
• Lively communal spaces which support a strong bedroom to allow for greater flexibility to multiple
sense of community and may include lifestyle leaseholders.
facilities such as workspaces, communal roof
terraces, gyms, cinema rooms and club houses.
General Storage Cupboard
Services Cupboard
As with all of our homes, the design of these Supported Housing: Extra Care:
specialist living environments starts with an
Housing with specialist support for a range of Independent living, generally for older people
understanding of our current and future residents'
people with different needs, including the following: with specific care needs, with managed on-site
specific lifestyle, mobility and care needs. Building
care and support services. Similar features to
on our experience of delivering and managing • Young people sheltered housing, but may also include: accessible
a range of specialist housing, while incorporating
• Young parents or families accommodation, dining facility, laundry facilities,
best practice industry guidance, we aim to offer
activity room, guest suite, therapy rooms, office,
comfortable, sociable and up-lifting homes for our • Mental health needs
changing and rest room for 24-hour care staff.
residents. • Drug and/or alcohol problems
Specific guidance for these specialist housing
We aim to cater to our residents' varying levels of • Homelessness typologies extends beyond that provided within
dependency, offering supported independent
• Learning disability this document. Therefore the design of housing
accommodation integrated within the general
for older people and those with specific care
residential community. Our provision of specialist Sheltered/Retirement Housing: needs must closely refer to and aim to establish
housing is predominantly categorised under the
Independent living for older people with their own compliance with all quality standards and other
following accommodation types:
address and front door. Facilities may include 24 requirements including the following key guidance:
hour care call system, scheme manager's office,
• NFCC’s Fire Safety in Specialised Housing, 2017
residents' lounge.
• Non-Mainstream Housing Design Guidance, 2012
• Housing LIN Factsheet No 6: Design Principles for
Extra Care, 2008 (see appendix for full list)
• Housing our Ageing Population: Panel for
Innovation (HAPPI), 2012
• Wheelchair Housing design Guide, Third Edition,
2018
• Living in the Community: Housing Design for
Adults with Autism, 2010
Design Guidance The Housing our Ageing Population Panel for Innovation
(HAPPI) Report, 2009
HAPPI Design Principles
Reference should be made to Housing our Ageing The 10 HAPPI design recommendations are:
Population: Panel for Innovation (HAPPI) by Homes
1. Generous/ Flexible Space Standards
and Communities Agency, part of: Housing for
older and vulnerable people. The HAPPI report 2. Natural light (incl. circulation spaces) HAPPI
Housing our Ageing Population:
outlines innovative housing examples from across 3. Avoidance of internal corridors and single aspect Panel for Innovation
Europe and makes recommendations to central dwellings for light and ventilation
and local government, developers and housing
developers. 4. ‘Care ready’ homes to accommodate emerging
technologies
Peabody seeks to embrace the HAPPI principles
as far as practically possible within future 5. Circulation that avoids institutionalisation and
developments for older people. encourages interaction
6. Lively multi-purpose social spaces that link with
the community
7. Engagement with the street
8. Energy efficient ‘green’ buildings
9. Adequate storage inside and outside home
10. Homezone design of outside spaces with
pedestrian priority
An audit of how a scheme considers each of the
HAPPI ‘ten components for the design of housing
for older people’ should be prepared during the
design stage.
Key Requirements
• Non-residential uses within Peabody • Consideration for loading/delivery • A complete glass shop front is to be
developments shall be restricted via bays from the street if no loading can allowed for. Shop frontage should allow
leases to those that are compatible with be provided on-site and drop off zones for floor to ceiling glazing with an integral
our values and suitable for residential particularly for D1 & D2 uses. door. The level of specification for the
developments, and must be agreed glass assembly and the location of the
with our Housing Services Team and
• Commercial ground floor ceiling heights doorway to be agreed with Peabody’s
to be 3.2m.
Commercial Property Team. Commercial Properties Team (CP) –
• A separate, adjacent bin store or waste toughened glass for the ground floor is
• Commercial units shall not be designed, collection area must be identified for sole required. The width and location of the
or allowed to be used, for sui generis uses
use of the commercial unit(s). If more opening(s) for the main entrance doors is
that fall outside other planning classes,
than one unit the bin store area should be to be agreed with CP.
such as betting offices, pay day loan
compartmentalised.
shops and nightclubs. • Provision for roof top mechanical plant
• Each commercial unit is to have a with an associated riser (750 x 750mm)
• Prior to commencement of the design separate street number to the residential is to be provided through the core
and at acquisition stage a BREEAM
units. Uniform, clear numbering to be together with associated access hatch for
Accredited Professional shall be
provided on the outside of the units. maintenance purposes.
appointed to the project.
Design Guidance
Commercial Units
• Street frontage for commercial units should be • Allowance for 500mm signage strip across the • Where provision is made for a Gym, these
maximised. Corner locations should be exploited top of the shop front. A uniform signage strategy facilities are to be available to all residents
where available. Where more than one unit is is required for larger schemes. regardless of tenure with an appropriate fee
provided, they should be adjacent for flexibility. structure.
• Consideration shall be given to the provision of
• The early involvement of potential operators integrated roller shutters for security, if required, • A separate loading bay or delivery area to serve
should be sought to ensure that the operational to avoid tenants adding their own. the commercial premises. Delivery/loading area
requirements for the commercial uses are met. to be flat and level and able to take loads of
• Servicing and waste management requirements 850kgs. Rear access should be provided where
• Retail and commercial units to maximise the for commercial uses to be carefully considered
possible depending on size, type and/or number
use of glazed façades to provide animated and integrated in a way that will limit the impact
of units allow for articulated lorry access. A Traffic
frontages. Blank or non-active façades to be on residential amenity.
Management plan may be required.
avoided.
• Where restaurant use is proposed below
• External activities may be allowed for retail residential properties, the design must • Provision of car spaces where possible and
minimum 3 cycle racks spaces per 1000 square
and commercial uses to create animated incorporate suitable risers for extraction to the
feet.
streetscapes and create an integrated highest building levels.
• Commercial spaces should be designed to be as • in flats, consideration should also be given to the
relationship between the buildings and the Where the building contains domestic sprinklers
public realm surrounding them. Location of
flexible as possible in order to be attractive to as
any external activities must be appropriate to installation of a commercial sprinkler system in
many appropriate tenants. This includes ensuring
the location and relationship to surrounding the commercial units.
that the size, shape, height and servicing of the
residential properties.
units will appeal to multiple end users.
04
04 Peabody Key Requirements & Design Guidance
St John's Hill, Hawkins Brown
Sustainability
• Whilst sustainability is important to Peabody, all • Early analysis of overheating risk in accordance with • All developments to be at least 'air quality neutral'
sustainability measures included in a scheme must CIBSE’s TM59 Design Methodology for the Assessment and to not lead to further deterioration of existing
benefit the residents of that scheme, be easy to of Overheating Risk in Homes (2017) should be poor air quality.
maintain and provide long term value for money. carried out as part of the design process.
All energy and sustainability proposals will need • Where possible, buildings will offer natural ventilation.
to be fully evaluated to consider management, • Development will ensure a minimum 35% on-site If not, MVHR to be installed.
carbon reduction beyond Building Regulations.
maintenance and running costs for our residents. • Non-residential areas of the development to take
• All design proposals in London will be in accordance • All developments to meet London Plan minimum into account the guidance from BREEAM ('Very
zero carbon targets for carbon dioxide emissions Good').
with latest GLA policies on energy and sustainability
reduction, meeting this requirement via carbon
strategies.
offset payment rather than the inclusion of additional • Maximum water use designed to be 105 litres per
person per day.
• A Fabric First approach shall be adopted, maximising renewable energy options.
the performance of components and materials
before considering the use of mechanical or • Where communal heating or CHP systems are to
be provided these shall be designed to Peabody’s
electrical building services.
Fairheat design guide.
Buildings
• All new developments should be designed from the • Developments should maximise the number of dual- Requirements (ER's).
outset to meet the current London Plan and Housing aspect homes. Single aspect north facing dwellings
SPG, or other relevant local planning guidance and shall be avoided. • All external wall construction including external
cladding systems shall be fully non-combustible –
comply with CDM 2015 Regulations.
• Buildings shall be orientated to maximise exposure refer to Peabody’s ER's.
• The external design of all buildings shall be 'tenure to daylight and allow sunlight into all living rooms for
• Dwellings should be designed so that sound
blind'. part of the day.
insulation values are at least 5dB better that Building
• 90% of units to meet Building Regulation requirement • Buildings shall also consider solar gain and the Regulations.
M4(2) ‘accessible and adaptable dwellings’ & potential for overheating, using TM59 methodology.
the remaining 10% to meet Building Regulation • Buildings need to consider the following from the
requirement M4(3) ‘wheelchair user dwellings’. • Buildings should have no more than 8 units per core outset:
per floor.
- Fire Strategy
• Buildings shall be designed with sufficient number of • Developments should target a wall to floor ratio of
cores to achieve the desired tenure mix, avoiding - Refuse Strategy
between 0.7 and 0.8.
the need for vertical separation of tenures.
- Cycle Storage
• Construction efficiency shall be fully considered • Developments should target an overall net to gross
(floorspace) efficiency of 0.75, with typical residential - Access and Security
when developing building layouts to maximise
floorplates aiming for at least 0.8.
the opportunity for stacking units, structural walls, - Window Cleaning
columns and services. • All developments of three or more storeys to • Flat roofs shall be designed with 1100mm high
be fitted with sprinklers – refer to Peabody’s
• All buildings are to have active ground floor Sprinkler Policy and Specification in the Employer’s
parapet walls wherever possible, to avoid
frontages. requirements for mansafe systems.
Communal Spaces
Entrances & Circulation
• Entrances to communal cores or individual dwellings • All wheelchair accessible/ adaptable units above main entrance doors, inner lobby doors to main
should be visible from the public realm, clearly ground floor shall be served by a minimum of two entrances and other external communal controlled
identified and easy to find, with a direct line of lifts, which are designed in compliance with Building doors shall open outwards, where required for fire
approach from the street. Regulations AD Part M. egress and shall meet the requirements of Part M for
accessibility, and Secured by Design for security.
• Where possible, communal cores shall have external • Postboxes shall be Secured By Design approved,
windows for natural daylight and ventilation. and located through-the-wall or in a secure lobby • Communal Entrance Doors to cores to be to SBD
area. They should be big enough for A4 documents standards and to BS 6375:2009 Part 2 Medium Service
• Floor and wall finishes should be made of robust and and designed to avoid theft through reaching in quality.
hard wearing materials that can be easily cleaned
from outside.
and repaired. • Colour video entry-phone system to all new flatted
• Where cores contain homes designed to both • Communal staircases shall be reinforced in situ or developments with KMS fob access.
pre-cast concrete, with straight flights incorporated
Building Regulations M4(2) and M4(3) the whole of
wherever possible, avoiding winders. • There shall be CCTV to all new flatted developments,
the communal area and access shall be designed overlooking entrances, post boxes, refuse and bike
to M4(3). • Communal controlled doors which shall include stores and key public realm.
Communal Spaces
Communal Facilities
• Car parking and cycle storage shall be provided in • Landlord’s external doors which shall include doors • Preference is for bins to be collected by the local
accordance with minimum Planning Requirements. to plant rooms, refuse stores, bike stores and other authority directly from store, rather than a managed
amenity space doors shall be robust standard collection. Refuse store shall not connect to the core
• Cycle storage shall be incorporated into the galvanised steel door-sets to comply with Secured By internally as this poses a security risk and allows smells
building, be of robust and secure design, but
Design, either self-finished or painted. to enter the building.
discrete enough to avoid theft. Our preference is
for a secure internal store, conveniently accessed • There should be separate bin and cycle stores • Cycle and refuse stores shall be discrete and not
from the communal entrance lobby. for different tenures. Localised smaller stores detract from the communal entrance.
are preferred to one large store which can be
• Storage facilities for waste and recycling containers intimidating to enter. • Suitable access shall be provided for maintenance
shall meet local authority requirements and meet at equipment for window cleaning, podium and roof
least British Standard BS5906:2005 Code of Practice • A caretakers store/ workshop shall be provided in garden maintenance, lift servicing etc.
for Waste Management in Buildings. each development as per Peabody requirements.
Communal Spaces
Communal External Amenities
• Sufficiently detailed landscape design and less susceptible to vandalism. requirements of wheelchair users and the Equality
specification required at planning stage to establish Act 2010.
the quality and scheme approach, including • Communal amenity space shall be provided
external lighting layout.
wherever possible at street or podium level. • Proposals should reflect current good practice and
Communal roof gardens should be avoided above the London Plan's priorities and this should treat the
• Maximise direct sunlight into all open spaces. affordable rented cores. landscape as 'green infrastructure' and consider the
context and any emerging borough wide strategies.
• Ensure all open spaces are well overlooked including • For developments with an occupancy of ten
roof gardens wherever possible. children or more, provide appropriate play provision • Play areas shall be designed to ROSPA's Code of
designed in accordance with the London Plan SPG, Good Practice for Play Areas. All new equipment
• Wherever possible, communal open spaces should 'Providing for Children and Young People’s Play and used shall conform to EN 1176 and surfaces to EN
be shared by all tenures.
Informal Recreation'. 1177.
• Trees should be carefully selected to be suitable for • Open space to be designed and constructed to Part • Play areas must be signed off by an accredited RPII
their location and to allow for future growth. Semi-
M of the Building Regulations taking into account the play inspector before use.
mature trees are preferred wherever possible as they
Communal Spaces
Operation & Estate Management
• Our preference is for HIUs to be accessed from • Access for maintenance should be fully considered Workshops should include a kitchenette with hot and
communal corridor/ deck access for easy landlord at design stage. Maintenance access to roofs shall cold water, space for a refrigerator and 2 double
maintenance. be via communal areas and not through homes. cupboard units, with space for a table and seating.
• BEMS shall be provided in all schemes with • All developments must include a Caretaker’s WC
communal heating with a hand wash basin with hot and cold water. No. of Dwellings Caretakers Workshop
Served Area
• All Landlords meters and supplies shall be kept • In each core or block there should be a Caretakers’s
separate from resident’s services and caretaker's Cupboard with hot and cold water, butlers sink
cupboards. which comply with the Peabody 'Caretakers Area 50 - 125 9.5m2
Requirements'. For every 125 units, one of these
• Resident’s electricity, gas, water and other meters cupboards shall be a minimum of 3m2. 125 - 250 13m2
shall be positioned so that they are accessible to
residents. • Developments of 50+ dwellings should incorporate 250 + 15m2
a Caretaker's Workshop. The workshop and WC
• Where there are communal heating pre-payment can be combined, however, the area of the WC
meters, these shall be installed in accordance with
is in addition to the areas set out on the right.
our ERs.
The Home
Home Layout & Rooms
• All homes to be compliant with current policies • Oversized homes should be avoided – affordable • For homes designed for an occupancy of 5 or more
and legislation, including Local Planning Authority’s homes to be no more than 10% larger than NDSS people, there shall be at least one bathroom with
relevant policies, the London Plan and the Housing unless agreed. WC and one additional WC.
SPG, and the development’s funding requirements.
• Minimum floor-to-ceiling height of 2.5m. • Second bedrooms should not open onto balconies.
• Where there are wheelchair accessible / adaptable • Minimum living room widths shall be 2.8m for up to 3 • 3B5P and larger affordable homes shall have a
homes, the scheme must enable a wheelchair user
people; 3.2m for 4 people or more. minimum of 2 living spaces, i.e. a living room and
to live in the unit and use any associated private
separate kitchen/diner.
outdoor space, parking and communal facilities. • All double/ twin bedrooms to be min 2.75m wide.
• The minimum room areas in wheelchair adaptable/ • Furniture should be indicated on plans to ensure • For schemes with a focus on provision for older
people, the project is to adhere to the HAPPI
accessible homes shall be as required by Building good room shapes and good positioning of windows
guidelines. For further requirements on specialist
Regulations AD Part M. Wheelchair adaptable/ and doors from within the unit. In affordable rented
housing, refer to section within this guide titled
accessible homes should be located as near to homes, only one double/twin bedroom shall be
'Specialist Housing'.
ground floor as possible. shown with a double bed. Other double/twin
bedrooms shall be shown with two single beds.
• Minimum unit sizes shall comply with Nationally
Described Space Standards, however wheelchair • Homes with 4 bedrooms 7 persons and over to have
units should be at least 10-15% larger to comply with a utility room.
Building Regulations AD Part M.
The Home
Home Layout & Rooms
• Second bedrooms should not open onto balconies. • The following minimum general storage space shall be provided, free from
services and full height:
• 3B5P and larger affordable homes shall have a minimum of 2 living spaces, i.e. a
living room and separate kitchen/diner.
Occupancy 2p 3p 4p 5p 6p 7p
• For schemes with a focus on provision for older people, the project is to adhere to
the HAPPI guidelines. For further requirements on specialist housing, refer to section General storage (m2) 1.5 2.0 2.5 3.0 3.5 4.0
within this guide titled 'Specialist Housing'.
• All homes shall be designed to achieve the following minimum room areas: • Washing machines shall not be located in open plan living/dining/kitchens, and
shall be in a separate services cupboard with the MVHR units etc.
Area (m2) 2p 3p 4p 5p 6p 7p • The following minimum kitchen storage volumes shall be provided:
Kitchen 6.4 7.0 7.0 8.0 9.0 10.8 Occupancy 2p 3p 4p 5p 6p 7p
Dining Room 4.2 4.7 5.4 6.1 6.6 7.1 Kitchen storage (m3) 1.5 2.0 2.1 2.2 2.4 2.6
Living Room 11.5 12.2 14 15.4 16.6 17.8 • At planning application stage, dwelling plans shall be shown with the following
minimum length of kitchen worktop (including sink and all appliances except
Kitchen / Dining 10.6 11.7 12.4 14.1 15.6 17.9 washing machine) in order to achieve the above storage volumes:
Occupancy 2p 3p 4p 5p 6p 7p
Living / Dining 15.7 16.9 19.5 21.5 23.2 24.9
Single Bedroom - 8.0 8.0 8.0 8.0 8.0 • The minimum length of the kitchen worktop in wheelchair accessible/adaptable
units will be longer, and shall be required by Building Regulations AD Part M.
Double/ Twin Bedroom 12.0 12.0 12.0 12.0 12.0 12.0
The Home
Features of the Home
• Private amenity space requirements should be as per • Where there is more than one private amenity • All habitable rooms to have an open-able window
London Plan with at least 5 sq. m for each 1-2 person space, the principal one shall relate to the living for ventilation – not just patio/French doors.
dwelling and an extra 1 sq. m for each additional space.
occupant. Preference is for a single usable balcony, • French doors are preferred to sliding patio doors,
rather than several smaller ones. • Windows should be designed to be cleaned however sliding doors will be permitted in tall
safely from inside by residents wherever possible, buildings where wind is more of an issue.
• Where adjacent homes have adjoining balconies, whilst taking into account a risk assessment to the
• Full height windows in front of kitchen units or sanitary
a privacy screen shall be provided between the recommendations of BS 8213-1:2004. This may
ware should be avoided.
homes. override the requirements of Building Regulations
• Balconies shall have solid floors and be effectively
Part K and require a cill height or guarding at • Avoid pigeon roosting features.
1100mm high.
drained, with careful consideration given to location
of rainwater pipes on elevations at design stage. • If windows can not be cleaned safely from inside
by residents, a managed window cleaning solution
• All balconies and other private external spaces to shall be incorporated into the design, allowing for
have a minimum depth and width of 1500mm.
abseiling points, cradles or sufficient space at ground
level for pole cleaning.
Non-residential Uses
• Non-residential uses within Peabody developments • Consideration for loading/delivery bays from the • A complete glass shop front is to be allowed for.
shall be restricted via leases to those that are street if no loading can be provided on-site and Shop frontage should allow for floor to ceiling glazing
compatible with our values and suitable for drop off zones particularly for D1 & D2 uses. with an integral door. The level of specification for
residential developments, and must be agreed with the glass assembly and the location of the doorway
our Housing Services Team and Commercial Property • Commercial ground floor ceiling heights to be 3.2m. to be agreed with Peabody’s Commercial Properties
Team. • A separate, adjacent bin store or waste collection Team (CP) – toughened glass for the ground floor is
area must be identified for sole use of the required. The width and location of the opening(s)
• Commercial units shall not be designed, or allowed commercial unit(s). If more than one unit the bin for the main entrance doors is to be agreed with CP.
to be used, for sui generis uses that fall outside other
store area should be compartmentalised.
planning classes, such as betting offices, pay day • Provision for roof top mechanical plant with an
loan shops and nightclubs. • Each commercial unit is to have a separate street associated riser (750 x 750mm) is to be provided
number to the residential units. Uniform, clear through the core together with associated access
• Prior to commencement of the design and at numbering to be provided on the outside of the hatch for maintenance purposes.
acquisition stage a BREEAM Accredited Professional
units.
shall be appointed to the project.
Photo Credits
Credit for the photos included throughout this • Nick Kane - New Darishire Place (page 6 & 29) A number of images are accredited to each of the
Design Guide is due to the following for giving drafting organisations respective image libraries,
permission for us to use their images:
• Philip Vile - Silchester (page 8 & 42) these include:
- Peabody Avenue (page 25)
• Benedict Luxmoore - Heathside & Lethbridge • Peabody - page 5, 31, 87 & 88
(page 45, 59 & 61) - Newington Green (page 55)
• PRP - page 81
• Craig Auckland - Creek Road (page 23 & 43) - Ogle Street (page 86)
• Haworth Tompkins - page 19
• David Bank - Oldchurch Hospital (page 90) • Rory Gardiner - Monier Road (page 16)
• Images created specifically for this Design Guide
• Dennis Gilbert - Underwood Road (page 53) • Richard Chivers - Park Heights (page 54) include those featured on the following pages:
20, 22, 28, 50, 51, 69, 73 & 89.
• Jack Hobhouse - St John's Hill (page 14, 38, 65 & - Oval Quarter (page 57)
98) - Chobham Manor (page 79) The Project team has used our best endeavours
to ensure that images are credited correctly. If
• Jody Kingzett - Embassy Gardens (page 45, 75 & • Richard Riddick - Creek Road (page 97) any errors in the accreditation of photographs
77)
• Robert Greshoff - Plaistow Hospital (page 12, 30 are brought to our attention, the information will
- Lock Keepers (page 26) & 39) be corrected in the next edition of the Peabody
- Darbishire Place (page 24) Design Guide.
- Devons Road (page 46,75 & 77)
• Kilian O'Sullivan - Mint Street (page 13, 40 & 82) Developing the Design Guide
• Simon Harvey - Fish Island Village (page 76 & 77)
• Lyndon Douglas - Lime Wharf (page 37 & 67) • Tim Crocker - Hargood Close (page 11) This Design Guide has been developed in
consultation with representatives from a range of
- Manor Works (page 85) - Pembury (page 33, 59 & 95) departments within Peabody, as well as resident
- Plevna Cresecent (page 87) - St Stephen's Green (page 63) volunteers currently living in Peabody communities.
The production of the document was headed
• Miles Willis - Blackfriars Estate (page 7) - Saxon Court (page 74) by Dave Norris and Joanne Groarke of Peabody,
• Morley von Sternberg - Coin Street (page 66) - Kings Cross R4 (page 83) and facilitated and produced by Nick James and
Brendan Kilpatrick of PRP Architects and Sarah Hare
- St Bede's Extra Care (page 92)
and Toby Johnson of Haworth Tompkins Architects.
Access to and use of buildings: Approved Document M, Ministry of Housing, Good Growth By Design, GLA, 2017 (page 9)
Communities and Local Government, 2015 (page 52, 55, 57, 60, 70 and 76)
HAPPI - Housing our Ageing Population: Panel for Innovation, Homes and
BREEAM - New Construction Technical Standards, BRE, 2018 (page 47) Communities Agency, 2009 (page 70, 87, 94 and 96)
BR 209 - Site layout planning for daylight and sunlight: a guide to good Homes for Londoners - Affordable Homes Programme 2016-21 Funding
practice, BRE, 2011 (page 36) Guidance, GLA, 2016 (page 34)
BS EN 1176-1 - Playground equipment and surfacing. General safety Housing - Supplementary Planning Guidance, GLA, 2016 (page 34, 41 and 70)
requirements and test methods, BSI, 2017 (page 66)
Housing LIN - Factsheet No 6: Design Principles for Extra Care, Housing
BS 5489-1 - Code of practice for the design of road lighting - Part 1: Lighting of Learning & Improvement Network, 2008 (page 94)
roads and public amenity areas, BSI, 2013 (page 38 and 39)
Living in the Community Housing Design for Adults with Autism, Helen Hamlyn
BS 5906 - Waste management in buildings. Code of practice, BSI, 2005 (page Centre, 2010 (page 94)
56 and 58)
London Cycling Design Standards, GLA, 2014 (page 58)
BS 6375-2 - Performance of windows and doors. Classification for operation
London Housing Design Guide - Interim Edition, London Development
and strength characteristics and guidance on selection and specification,
Agency, 2010 (page 72)
BSI, 2009 (page 52)
Managing health and safety in construction - Construction (Design and
BS 8213-1 - Windows doors and rooflights. Design for safety in use and during
Management) Regulations, Health and Safety Executive, 2015 (page 41)
cleaning of windows, including door-height windows and roof windows. Code
of practice, BSI, 2004 (page 45 and 80) Non-mainstream Housing Design Guidance, Homes and Communities
Agency, 2012 (page 94)
BS 9991 - Fire safety in the design, management and use of residential
buildings. Code of practice, BSI, 2015 (page 44) Secured by Design - Homes, Secured by Design, 2016 (page 35, 39 and 52)
Can the Mayor’s new Plan deliver Good Growth for London?, GLA, 2018 Shaping Neighbourhoods: Play and Informal Recreation - Supplementary
(page 9) Planning Guidance, GLA, 2012 (page 60 and 66)
Drainage and waste disposal: Approved Document H, Ministry of Housing, Trees in Hard Landscapes: A Guide for Delivery, TDAG, 2014 (page 38)
Communities and Local Government, 2010 (page 85) The London Plan, GLA, 2017 (page 34, 41 and 70)
Equality Act, Equality and Human Rights Commission, 2010 (page 60) TM59 - Design methodology for the assessment of overheating risk in homes,
Fire Safety in Specialised Housing, NFCC, 2017 (page 44) CIBSE, 2017 (page 29, 41, 47 and 50)
Wheelchair Housing Design Guide: 3rd Edition, RIBA, 2018 (page 94)