scheme 5 tapping point(11:15)

dpwh letter instructing HCC to proceed interior connection layout of scheme 5 while
waiting for the finalization of the tapping points outside nsb project, together
with the instruction meron kaming comments po with regards to the costing
HCC is preparing the budgetary costing so once kumpleto na yung information, fost
and mgsb office separated from the costing. the costing os limited to scheme 5,
there are three costing on basement 1, fost for variation, offices of sct, and
scheme 5.

DPWH with regards with the submittal


RDAED submitted today nov 17, 2020
DPWH check their DC if received
(13:40) HCC remaining items at Basement 1 mechanical lift, motorpool, mgsb special
storage, HCC waiting for formal instruction but already proceeded based on the
confirmation from SCT
HCC these are the items not included in the submittals from B1
DPWH for update DPWH transmitted a letter to SCT waiting for the confirmation of
the incorporated ...heater?(14:30) for additional comment
DPWH yesterday yung transmittal

Third Floor
HCC asked for timeline
DPWH replied hopefully within this week for the queries and comments of SCT

STP
HCC stated that SCT emailed drawings of drainage and sewer from BCDA, HCC will wait
for DPWH instruction if they will follow the drawings from SCT.DPWH replied that
they did not receive the letter. SCT will just resend the said letter.

DPWH mentioned regarding the drainage they will give back the letter from HCC
because of the comments they saw in the attachments and estimates.

HCC stated they conducted a clarificatory with DPWH regarding the budgetary costing
last November 12, 2020, DPWH to return the budgetary costing and for revision of
HCC. HCC are waiting official letter. DPWH replied its just for signatory of their
heads.

Perimeter Roads
HCC already received the comments from DPWH last November 16, 2020, HCC will
provide a response on November 18, 2020.

Other Item Landscape GF


HCC asked DPWH and SCT about the approved Landscape GF. DPWH replied that both
overlayed plan is with HCC and the revised Ground Floor layout is with SCT. SCT
updated HCC that is under review and they are trying have signed after reviewing.

The other direct contact patient ichecheck ulit bukas at aassed bukas at kapag okay
na bukas baka iclear na rin bukas
The other direct contact patient will be re-assed on November 18, 2020, Once okay
with the LGU the patient will be clear

Raised Flooring
HCC forwarded the addditional requirement last nov 9. DPWH mentioned they have an
ongoing coordination with HCC Engineering bali po with regards sa costing naman sa
paguusapan namin ay additonal clarification with details ay ongoing naman
nagreresponse naman daw si maam ayla
maam ayla:ang hinihingi ni maam ivory ay yung confirmation from the designer na
yung lang yung area lang na lalagyan sa fourth floor at kung value enginnering na
din ba yon
at kung magaaprove yon yung na yung final design para sa fourth floor at kung may
iba areas sa ibang floor na malalagyan ng raised flooring yan yung mga queries ni
maam lil
maam yassi: yan na yung recommendation ng consultant set up ng raised flooring ay
per floor
mam lil: tinanong sct kung aware sa every floor approval sa raised flooring
sir orlie: approved basta masubmit pero rerelay pa rin sa mga superiors niya
Maam yassi: HCC mentioned that the Raised flooring is alligned
with RDAED dati daw kasi nagpaparallel coordination 2nd 3rd 4th
floor kaya don natigil ang raised flooring sa third pero may final
locations na sa third floor bali fourth yung inaayos as of today
along with finalization of layout dito lang din nafifinalize ang
raised flooring di siya pwede ilahat kasi don lang naiidentify
yung space utilization na gusto ni senate.
raised flooring started at GF up to Roof meron daw letter na nandon
yung proposed raised flooring kaso mababago nga daw siya dahil
sa gusto ni senate.
mam lil. bakit daw yung fourth floor lang yung may costing bat ibang floor wala
mam y. don lang daw nagrequire ng rate ng costing dati walang requirement ng
costing pag
dating sa raised flooring
mam lil pwede daw maging CE of VO dapat kung ano ginawa sa fourth
floor meron din dapat costing sa ibang floor levels kung isasama
sa VO di namna pwede 4th floor ang may budgetary costing
mam y: gusto lang daw malaman ng SCT ang cost ng budgetary costing
mam lil; tinanong si sir orlie kung okay kung fourth floor lang
magagawa ng costing di magawa yung iba floor levels.
sir orlie: note na lang na partial others to follow as we go along
pero will verify muna sa superior

Elevator:

Berde

You might also like