You are on page 1of 6

BAHASA INGGRIS TEKNIK

SECOND TASK

Disusun Oleh :

ELVIANA

321 18 007

3A D3 TEKNIK LISTRIK

PROGRAM STUDI TEKNIK LISTRIK


JURUSAN TEKNIK ELEKTRO
POLITEKNIK NEGERI UJUNG PANDANG
MAKASSAR
2020
PLAGIARISM SCAN REPORT

Date 2020-11-28

Words 991

0% 100% Characters 6017


Plagiarised Unique

Content Checked For Plagiarism

Asslamualaikum wr, wb My name is Elviana, I studied at the Ujung Pandang State Polytechnic Department Electrical Engineering.
Polytechnic is one of the education units in higher education budgeting applied education in a number of specialized knowledge areas. A
college student at polytechnics are equipped with reliable abilities and skills before entering the world work. These abilities and skills are
honed and enhanced through workshop practices Practice is important because the theory obtained during lectures is less effective
andunbalanced without direct practice. Thus students will have work experience indirectly through the practice that is held so very needed
now and also in the future As for my moment when carrying out the workshop for semesters 1 to 4, namely at the time workshop before
starting the practice we always carry out the morning apple directed by Our supervisor must wear safety shoes, workshop clothes, and do
things our practice must comply with the rules according to safety procedures. In the 1st semester workshop, namely the mechanic
workshop which is held for 2 weeks. starting from 23 October -07 November 2018, students are required to do 3 The first job is the U Profile
job where in the process students will learn using the calipers, the dripping technique, the scratching technique, the file drilling, etc. While
doing this practice I myself felt a little bit difficult because drilling, etc. at the time of doing this practice myself feel a little bit difficult because
I think it's hard work that is rarely done by women however after I do this practice I feel happy because I get a lot experiences where we are
trained to be patient in filing, sawing and drawing on U profile, accuracy in doing practice and Using calipers correctly The second. Job,
namely duck eye training. In this job, it takes persistence to put up cables on a wiring board with varying degrees of cable thickness. in the
process stripping the end of the cable requires care because it could injure hands, experience myself, my hand was bleeding from not being
careful in peeling the third Yane cable namely Job wiring exercises, where students connect the cables to various terminals in my opinion
job 3 is easier than the two jobs previous. In the 2nd semester workshop, namely the lighting installation workshop which was carried out for
2 Sunday. Rada practicum uses the method of applying the meaning of the image to the boardpractice. In this practicum we were distributed
a jobsheet, we could see the picture location diagrams and one-line wiring diagrams, new students can read pictures diagrams in order to
complete the job properly and precisely on this job, there are several the first step is to make a guide line on the triplex, this gazis serves to
assist in determine the position of the components to be installed. The second stage is conducting the piping stage the third installs the
components on the guide lines that have been made Phase four capturing the fifth stage by working on the panel as for the obstacles The
face is that there are some appliances that are lacking like a lamp and a staircase so it is a must taking turns with other students while
testing the series But at the time testing the circuit there could be troubleshooting trouble in my circuit, namely the lights group 2 does not
turn on, the cause lies in the first input of the swap switch switched with the output (the input is at the output terminal) After that is done
check and re-analyze the accuracy of the cable connection and the correctness of its installation.So after the problem is known, repair and
justification are immediately carried out so that it can function properly. In the 3rd semester workshop, namely the labor installation and
lighting practicum held for 2 weeks starting November 25 - December 13 2019, In this practicum, students are taught to carry out the
installation process according to the existing jobsheet given in this practicum is still related to the previous semester practicum where
students must be able to read pictures in order to complete jobs correctly After installing the lighting, then proceed to the power installation
process. On when it is intended to build installations that can be used to control motorbikes. There are several types of controls that are
applied in this practice, namely Auto Reverse, Star-delta, up to DOL. In this job there can be trouble such as short ballini lights usually occur
due to improper installation of the caused by reading a wrong picture thus the activities of this workshop accuracy is required in composing
and reading images. In the 4th semester workshop, namely the Conventional Industrial Automation & PLC) practicumheld for about 2 weeks
starting from March 03 - March 13 2020. At the workshop this time, students were assigned to do 4 kinds of tasks, namely Air Blast, Milling.
Furnace and Pumps Before doing the first job we were divided into groups which consists of groups of each group consists of 3 people.
After implementing 4 kinds of tasks, students are expected to know how industrial work simulations are currently running so as to achieve
maximum work results in the industrial world need to prepare a reliable and experienced workforce and capable students appear confident
in seeking out and resolving damage caused to the distraction installation, and in this job also train practical cooperation to become a
workforce professional and competent in their field later. In the workshop, 21 safety golden rules must be applied, such as treating all
devices of all electrical devices as if they were alive or energized,. However, at the time of the 3rd semester workshop, there were still
negligence because they did not pay attention to the 21 safety golden rules, namely not disconnecting the power source before repairing
electrical equipment, resulting in a short circuit in the workshop room which caused the workshop lights to go out.

Matched Source

No plagiarism found
Asslamualaikum wr, wb

My name is Elviana, I studied at the Ujung Pandang State Polytechnic Department


Electrical Engineering. Polytechnic is one of the education units in higher education budgeting
applied education in a number of specialized knowledge areas. A college student at polytechnics
are equipped with reliable abilities and skills before entering the world work. These abilities and
skills are honed and enhanced through workshop practices Practice is important because the
theory obtained during lectures is less effective andunbalanced without direct practice. Thus
students will have work experience indirectly through the practice that is held so very needed
now and also in the future

As for my moment when carrying out the workshop for semesters 1 to 4, namely at the
time workshop before starting the practice we always carry out the morning apple directed by
Our supervisor must wear safety shoes, workshop clothes, and do things our practice must
comply with the rules according to safety procedures.

In the 1st semester workshop, namely the mechanic workshop which is held for 2 weeks.
starting from 23 October -07 November 2018, students are required to do 3 The first job is the U
Profile job where in the process students will learn using the calipers, the dripping technique, the
scratching technique, the file drilling, etc. While doing this practice I myself felt a little bit
difficult because drilling, etc. at the time of doing this practice myself feel a little bit difficult
because I think it's hard work that is rarely done by women however after I do this practice I feel
happy because I get a lot experiences where we are trained to be patient in filing, sawing and
drawing on U profile, accuracy in doing practice and Using calipers correctly The second. Job,
namely duck eye training. In this job, it takes persistence to put up cables on a wiring board with
varying degrees of cable thickness. in the process stripping the end of the cable requires care
because it could injure hands, experience myself, my hand was bleeding from not being careful
in peeling the third Yane cable namely Job wiring exercises, where students connect the cables to
various terminals in my opinion job 3 is easier than the two jobs previous.

In the 2nd semester workshop, namely the lighting installation workshop which was
carried out for 2 Sunday. Rada practicum uses the method of applying the meaning of the image
to the boardpractice. In this practicum we were distributed a jobsheet, we could see the picture
location diagrams and one-line wiring diagrams, new students can read pictures diagrams in
order to complete the job properly and precisely on this job, there are several the first step is to
make a guide line on the triplex, this gazis serves to assist in determine the position of the
components to be installed. The second stage is conducting the piping stage the third installs the
components on the guide lines that have been made Phase four capturing the fifth stage by
working on the panel as for the obstacles The face is that there are some appliances that are
lacking like a lamp and a staircase so it is a must taking turns with other students while testing
the series But at the time testing the circuit there could be troubleshooting trouble in my circuit,
namely the lights group 2 does not turn on, the cause lies in the first input of the swap switch
switched with the output (the input is at the output terminal) After that is done check and re-
analyze the accuracy of the cable connection and the correctness of its installation.So after the
problem is known, repair and justification are immediately carried out so that it can function
properly.

In the 3rd semester workshop, namely the labor installation and lighting practicum held
for 2 weeks starting November 25 - December 13 2019, In this practicum, students are taught to
carry out the installation process according to the existing jobsheet given in this practicum is still
related to the previous semester practicum where students must be able to read pictures in order
to complete jobs correctly After installing the lighting, then proceed to the power installation
process. On when it is intended to build installations that can be used to control motorbikes.
There are several types of controls that are applied in this practice, namely Auto Reverse, Star-
delta, up to DOL. In this job there can be trouble such as short ballini lights usually occur due to
improper installation of the caused by reading a wrong picture thus the activities of this
workshop accuracy is required in composing and reading images.

In the 4th semester workshop, namely the Conventional Industrial Automation & PLC)
practicumheld for about 2 weeks starting from March 03 - March 13 2020. At the workshop this
time, students were assigned to do 4 kinds of tasks, namely Air Blast, Milling. Furnace and
Pumps Before doing the first job we were divided into groups which consists of groups of each
group consists of 3 people. After implementing 4 kinds of tasks, students are expected to know
how industrial work simulations are currently running so as to achieve maximum work results in
the industrial world need to prepare a reliable and experienced workforce and capable students
appear confident in seeking out and resolving damage caused to the distraction installation, and
in this job also train practical cooperation to become a workforce professional and competent in
their field later.

In the workshop, 21 safety golden rules must be applied, such as treating all devices of all
electrical devices as if they were alive or energized,. However, at the time of the 3rd semester
workshop, there were still negligence because they did not pay attention to the 21 safety golden
rules, namely not disconnecting the power source before repairing electrical equipment, resulting
in a short circuit in the workshop room which caused the workshop lights to go out.

You might also like