Learning objectives
• Geological objectives
Obtaining Consent
• Permission from relevant authorities
Collection of data
• Well pressure data, seismic and geological profile etc.
Rig Selection
Well Details
• location
• type
• depth
• operator / owner
• designation
• target size and depth
• contractor and rig name
Well Objectives
• to establish objectives at TD
Producer
Injector
Abandon
Drilling Programme Casing
Casing Design
• conductor
• surface casing
• intermediate casing
• production casing
• liners
• pressure profile chart
• initial design
• setting depth
• casing shoe setting depth
• burst, collapse, tension,
compressional effects
• tensile failure
• shock loading
• overpull
• cement force
• position of packer
• centralisation
• running procedures
Drilling Programme Well Head
High Pressure
Wellhead
Wellhead Housing
Drilling Programme BOP’s
BOP Requirements
• bottom hole pressures
• company policy
• stack up configuration
Cementing Program
• volumes required
• bottom hole temperatures
• mud type
• formation type
• stinger technique
• liner cementing
• yield
• density
• thickening time
• mix water
• compressive strength
• fluid loss
• flow characteristics
Drilling Programme Deviation
& Survey Requirements
Deviation Program
• extent of drift
• jetting techniques
• whipstocks
Drilling Programme Deviation
& Survey Requirements (continued)
Survey Requirements
• minimum requirements
• totcos
• directional MWD
Well Evaluation
• Well Logs
• Mud Logs
• Sample Logs
• Multiple Logs
• Core Logs
• Side Wall Coring
• Wire Line Logs
• SP Logs
• Radioactive Logs
• Sample logs
• Sonic Log Devices
• Dipmeter Log Devices
Drilling Programme Continued
Mud Program
• mud weight requirements
for primary control
• suitable trip margin
• confirm mud weight does
not exceed formation
strength
• reaction of formations to
drilling fluid alternatives
• selection of mud type
• fluid loss requirements
• pH requirements
• viscosity
• temperature/ stability
• analysis of mud treatment
equipment
Drilling Programme Continued
Evaluation Requirements
• drilling log
• mud logging
• coring
• MWD (measurements while drilling)
• electric log
• testing
• plug and abandon
Well Evaluation
• Well Logs
• Mud Logs
• Sample Logs
• Multiple Logs
• Core Logs
• Side Wall Coring
• Wire Line Logs
• SP Logs
• Radioactive Logs
• Sample logs
• Sonic Log Devices
• Dipmeter Log Devices
Drilling Programme Continued
Operational Procedures
and Time Graph Construction
• company policy
• contractor policy
• bridging document
• time graph
Drilling Programme Continued
Reporting Requirements
• Frequency
• Recipients/addresses
Discussion and Feedback
Thanks!