DETAIL ENGINEERING DESIGN PHASE • SOCIAL SAFEGUARD ACTIVITIES

ALTERNATIVE • EIA DOCUMENT UPDATING


CHOSEN TO BE HYDROLOGY ASPECT
WARSAMSON DAM
TECHNICAL DATA • TOPOGRAPICAL SURVEI AND MEASUREMENT
DESIGN • GEOLOGICAL SURVEI & INVESTIGATION
• Water Availability Mass Curve
• Flood Hydrograf • Dead Storage
• Sedimentation Rate • Active Storage
DEVELOPMENT OF • Flood Storage
CASE 1

MULTI-PURPOSE • Important Elevation DESIGN DESIGN OPTIMATION


Data +
DAM IN TROUGH VALUE CASE 2
UPDATE PARAMETER OF WARSAMSON DAM DESIGN BOQ
WARSAMSON + ENGINEERING
• Update Hydrology Aspect
• Drop of Dead Storage Elevation (Usle Method) RAB PROCESS
CASE 3
• Optimation Active Volume
• Flood Control Adjustment
• Update Water Demand Data CASE 4 CASE 5 CASE 6

START WATER DEMAND WATER DEMAND


HYDROLOGY
HYDROLOGY (Raw Water; (Raw Water;
FLOOD
DEPENDABLE FLOW Electricity; Electricity;
Irrigation; MF; etc
HYDROGRAPH
Irrigation; MF; etc ECONOMIC AND FINANSIAL ANALYSIS
DEAD
STORAGE
(NPV, IRR, BCR)
ANALYSIS
SIMULATION OF VOLUME FLOOD CONTROL ANALYS
EFFECTIVE (FLOOD ROUTING USING HEC
(Dry, Normal, Wet) HMS)

DEAD STORAGE DATA POTENTIAL IRRIGATION AREA


(ELEVATION, VOLUME)
WIDTH OF WIDTH OF
SUITABILITY FOR SPILLWAY ON SPILLWAY
Veff HOLD ENLARGED

DROP DEMAND
SPILLWAY
ELEVATION
EVERY 5 meter OBTAINED TECHNICAL DATA
ACTIVE STORAGE DATA
(ELEVATION, VOLUME) FOR STRUCTURE AND VOLUME FINISH RAW POWER
OF WARSAMSON DAM
WATER PLANTS
Economic Valuation
Method

 Process Progress
< - Process
Breakdown