Telephone:
Mobile:
Email:
Post Code:
VAT rate:
Carreg Construction Ltd, Unit 2, Western Tangiers, Tangiers, Haverfordwest, Pembrokeshire, SA62 4BU
Tender Enquiry Document:
Drawings:
Specification:
Programme:
Preliminaries:
Dayworks
All variations to be priced and agreed before works are undertaken. Should day work be absolutely necessary, it is then a
sub-contractor duty to ensure that they are signed on a weekly basis by the Contracts Manager. Payments for unsigned or
unarranged dayworks will not be made.
Materials: %
Please confirm:
Carreg Construction Ltd, Unit 2, Western Tangiers, Tangiers, Haverfordwest, Pembrokeshire, SA62 4BU
Contract Particulars:
Method of Measurement
Liquidated Damages
Retention
Sub-contract Valuations
Secure Storage
Unloading materials
Hoisting of materials
Placing in position
Setting out
*The care and security of any generators, leads, lights, small tools, etc., if loaned to the sub-contractor is their responsibility.
Carreg Construction Ltd, Unit 2, Western Tangiers, Tangiers, Haverfordwest, Pembrokeshire, SA62 4BU
Supplementary Conditions:
1. You are required to sign and return this order prior to commencement on site.
2. All terms and conditions appended to your quotation are superseded by the details and conditions
contained within this order.
3. All your works are to comply with the current Health and Safety legislation and all measures are deemed to
be included within your quotation.
4. Should you fail to clear debris on a daily basis then a warning notice may be issued by our supervisor.
Failing clearance on the notice, Carreg will clear the debris on your behalf and either all associated costs or
a minimum charge of £100.00 (whichever the greater) will be deducted from your account accordingly.
5. You may be required to attend sub-contract collaboration and progress meetings. When asked to do so,
these meetings will be compulsory and should take no more than one hour. The person who should attend
is your site foreman / supervisor.
6. It is assumed that you have included for sufficient visits and labour to satisfactory carry out your works
within the programme of works.
7. It is assumed that you have visited the site to obtain all necessary information upon all matters which may
influence you or effect your order, as no claim will be allowed for lack of knowledge of either site or contract
conditions.
Signed: Name:
Position: Date:
We accept the terms and conditions of Carreg Construction Limited sub-contractor purchase order
Signed: Name:
Position: Date:
Carreg Construction Ltd, Unit 2, Western Tangiers, Tangiers, Haverfordwest, Pembrokeshire, SA62 4BU