You are on page 1of 5

1

Assignment #4

Assignment topic: Explain and interpret


control charts
Subject: Total quality management
Submitted to: Sir Waseem khan
Submitted by: Makhzan Saleem
Class Code: Cu-685-2016
Semester: 6th
Date: 15th July ,2020
CECOS University of IT and Emerging Sciences
2

Part A

Interpretation:
This graph is unstable because the last points is showing
deviation and are not close to the central limit.
And there points are placed accidentally.

Part B

Interpretation:
It is unstable because the last points is showing deviation and are
not close to the central limit.And there points are placed
accidentally.
3

Part C

Interpretation:
This graph is unstable because the last points is showing
deviation and are not close to the central limit. And there points
are placed accidentally

Part D

Interpretation:
This graph is unstable because the last points is showing
deviation and are not close to the central limit.
And there points are placed accidentally
4

Part E

Interpretation:
In part e the graph is unstable because the last points is showing
deviation and are not close to the central limit.
And there points are placed accidentally.

Part F

Interpretation:
This graph is stable because the last points are not showing any
deviation and are close to the central limit
5

You might also like