You are on page 1of 3

InterContinental Resort Project - Mina Al Arab

Progress Status of JC Maclaen as of 27 October 2020


ID Activities / Guest Rooms 3 MEAL BRASSARIE SEAFOOD (LEVANT) MAIN LIFT LOBBY POOL DECK CLUB LOUNGH (executive loungh) SPA HAMMAM LIFT LOBBY & STAIR BEACH BAR RECEPTION LOBBY
Screed (Dry Area)
Gypsum Wall Framing (Dry Area)
Gypsum Wall Boarding (Dry Area)
Ceiling Boarding (Dry Area)
Screed (Wet Area)
Gypsum Partition Framing (Wet Area)
Gypsum Partition Boarding (Wet Area)
Level 6

Wall Tiles (Wet Area)


Wall Marble (Wet Area)
Ceiling Boarding (Wet Area)
Floor Tiles (Wet Area)
Floor Tiles (Dry Area)
Stucco coat (Wall & Ceiling)
Entrance Door Frames
Entrance Door Shutters
Interconnecting Door Shutters
C.VIP MAJLIS LOBBY LOUNGH BALL ROOM PRE FUNTION MEETING ROOM BOARD ROOM PRAYER ROOM HEALTH CLUB KIDS CLUB TEENS CLUB PUBLIC TOILETS Loungh bar @ level 2 Block A Level 2 Pre function - Block A L2
Intercontinental Resort Hotel,Mina Al Arab, RAK, UAE
Action Plan - October 2020

Package 02 - Public Areas

Public Areas Priority List

S.no Activity Week 1 Week 2 Week 3 Week 4

1 Screed (Dry Area) Health club Kidsclub,Teen Club, Reception Lobby Ball Room , Lounge bar Prefunction, Meeting Room,Club Lounge

2 Gypsum Wall Framing (Dry Area) Club Lounge, Board Room, Brasserie Health Clb, Kids Club ,Teen Club Reception Lobby, Lounge Bar Ball Room, Meeting Room

3 Ceiling suspensions (Dry Area) Levant , Board Room Brasserie , Club Lounge Health Club,Lift lobby & Stairs Teen Club, Kids Club

4 Screed ( Wet Area) Reception Lobby , Levant 3 Meal Resturant Brasserie , Club Lounge Board Room, Teen Club, Kids Club,Ball Room

5 Ceiling suspension (Wet Area) Prayer room Levant , Brasserie Club Lounge, Teen Club Public Toilets

Page 3 of 3

You might also like