CIP unit preparation (In CIP Room)


No. Task Responsibility Status
1 Check Chemical Concentration (22 mS/cm) Chemist PO Check Not Check
2 Check Chemical Temperature (85 C) Chemist PO Check Not Check
3 Check CIP Strainer & Clean Chemist PO Check Not Check
4 Check CIP Swing Bend in syrup room (Must be alligned as per Loop requirement) Chemist PO Check Not Check
5 Check CIP return pump switch in CIP room according to Line wise. Electrician Chemist Check Not Check
6 Check the Ammonia valve is closed? PO Operator Check Not Check
CIP unit preparation (In Filler Hall)
No. Task Responsibility Status
1 Does the filler Cup propely cleaned & attached with valves PO Chemist Check Not Check
2 Does the CIP Bends are connected properly according to Loop Requirement. Chemist PO Check Not Check
3 Does All the CIP Loop valves are open (Filler Return, Flow mix & CIP) Chemist PO Check Not Check
4 Does all the Electrical Equipments (EBI, Sensor, Motors) are properly covered? PO Electercian Check Not Check
5 Does all the seals, Joints & valves has been checked? PO Chemist Check Not Check
6 Does all the finished product is removed from the plant? PO Chemist Check Not Check
During CIP
No. Task Responsibility Status
1 Monitoring of CIP operating parameters (Temperature, Flow rate, Conductivity & Contact Time) Chemist PO Check Not Check
2 Verification of any leakages in CIP loop (From filler valve, Joints, seal, valves, FM) Chemist PO Check Not Check
3 Check all the Electrical Equipments (EBI, Sensor, Motors) are protected from heat and water. Electrician PO Check Not Check
4 Verify the Flow-Mix, Syrup side, water side sampling valves are open. Chemist PO Check Not Check
5 Remove Air from return pump to avoid choking/Cavitation. PO Operator Check Not Check
6 Record all the operating parameters in log sheets. Chemist PO Check Not Check
After CIP
No. Task Responsibility Status
1 Preparation of COP chemical prior to CIP end. PO Chemist Check Not Check
2 Proper cleaning of all equipments (Carbo-Cooler, FM, Filller & Rest of units in filling Hall) PO Chemist Check Not Check
3 Verification of Cleaning results, Filler, FM, Carbo-cooler inspection Chemist PO Check Not Check
4 Micro sampling Chemist PO Check Not Check
5 Syrup attachment. Chemist po Check Not Check