Work Planning
Work Planning
Done 11/4/2019
Fabrication of 8 inch two number of pump stainer Anwar sadat
Pipe support fabrication Done 11/6/2019
Platform, Ladder making over pump house Done 11/3/2019
Pump Alignment. Done 11/6/2019
Civil Casting under rain shed column Mr. Haque Not Okay
Colling water bypass line Done 11/8/2019
Anwar sadat
Cleaning of Cooling water pond Done 11/3/2019
Chemical for cooling water pond Mr. Aziz Not Okay
Commissioning with Avenue Trade Anwar sadat Done 3/12/2019
4 Nitrogen line for receiving Liquid Nitrogen. Anwar sadat Done 11/4/2019
5 Fixing LPG pump stainer Anwar sadat Done 11/2/2019
6 Emergency eye and body shower for NHT CRU Anwar sadat On going
7 CFP Sampling Point 6 Nos.
8 Flare BMS Skid bolt Tighten (For leak prevention) Anwar sadat Done 11/7/2019
11 Hydrogen Generator
CWS, CWR, PW Line, Product line Anwar sadat Done 11/2/2019
Table and Frame making for tubing Anwar sadat Done 11/3/2019
Tubing E&I Done
SS DM water line fabrication Anwar sadat Done 1/12/2019
Alignment, Belt tension, Pitch angle. Anwar Sadat, Mr. Shofi Done 10/28/2019
Alignment, Belt tension, Pitch angle. Anwar Sadat, Mr. Shofi On going 11/3/2019
18 Automation and Final check of fire network Anwar Sadat Done 11/7/2019
19 Pressure vessel Platform making Mr. Arif and Mr. Saiful On going
All rotary pump luboil level, Alignment, Dry rum current CFP Done, CRU On
25 Mr. Aziz and Anwar Sadat
reading, Temperature, vibration need to check. going
26 Stataic Vessle of NHT CRU Need to inspect and have to Anwar sadat Done
prepare a punch list.
27 Inspection and Preparing Punch list for NHT CRU. Mr. Ali Hossain On going
28 Need to Run Instrument air compressor 2nd unit, Cooling Mr. Aziz Done
tower. Also need to finish automation of fire pump.
29 Hydro testing, flashing, boxup of NHT CRU. Mr. Ali Hossain Done
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
3/12/2019
11/12/2019
11/12/2019
11/12/2019
11/10/2019
11/15/2019 Khulna Mechanical doing work
11/12/2019
11/8/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/12/2019
3/12/20169
11/12/2019
11/12/2019
11/12/2019
10/27/2019
11/15/2019
11/20/2019
11/21/2019
11/22/2019
11/3/2019
11/3/2019
11/3/2019
Insulation on going. Mr. Haque and
11/9/2019
Mr. Saiful
Insulation on going. Mr. Haque and
11/9/2009
Mr. Saiful
11/12/2019
11/12/2019
11/12/2019
11/12/2019
11/14/2019
11/20/2019
11/12/2019
4/12/2019
7/12/2019
7/13/2019
7/14/2019
7/15/2019
7/16/2019
7/17/2019
7/18/2019
7/19/2019
7/20/2019
7/21/2019
7/22/2019
7/23/2019
7/24/2019
7/25/2019
7/26/2019
15/12/2019
15/12/2020
15/12/2021
15/12/2022
15/12/2023
1. Spool wrong P11 P 22.
2. Alloy Nut bolt wrong.
3. Flange face wrong.
4. Heater MOC.
5. Orifice installation wrong.
6.HEX 3001 P11 CS
7.LT SCH 160 PUT 40
8. LT Double making
9. MJA India wrong material
10.LPG Bullet N2 insert.