You are on page 1of 36

Technical Description

50 MWp Solar Project in Egypt/ BenBan

SPV Delta for renewable Energy


Structure of the EPC Ideemasun Egypt LLC

IdeemaSun Egypt LLC

26 % ownership 74 % ownership

Ideemagroup Holding GmbH IdeemaSun energy GmbH


Managing Director: Eduard Eckl Managing Director: Mario Eckl and Meik Rekowski
Ownership: Eduard Eckl 50% and Rosemarie Eckl 50% Ownership: Mario Eckl 50% and Eduard Eckl 50%

© IdeemaSun 2015 2
Location

Location
 Kom Ombo/ BenBan

© IdeemaSun 2015 3
Location

Location
 Kom Ombo

Project site
 BenBan

© IdeemaSun 2015 4
Location

© IdeemaSun 2015 5
Side Coordinatinates

19.3 Delta
Delta

© IdeemaSun 2015 6
Executive Layout of the Delta Project

156.240 pcs Module CSI 320 W

22 pcs Inverter SMA SC 2200

49.996,80 KWp

© IdeemaSun 2015 7
Executive Layout of the Delta Project

 Standardized 2,2 MW sections, for large scale projects

© IdeemaSun 2015 8
3D Layout of the Delta Project

 CAD: generation of construction layouts supported by 3D-Simulation

© IdeemaSun 2015 9
PVsyst report

 Yield estimation with Pvsyst 6.2.5

© IdeemaSun 2015 10
Construction Management

Quality management

HSE management

Logistic Management

 Supply of workers with food, water,


accommodation
 Worker camp with canteen, prayer area, toilets
 Providing site facilities
 Waste disposal and sewage treatment
 Modern Equipment

© IdeemaSun 2015 11
Construction Management

Quality management/ Quality assurance

 Ideemasun ensures quality standards according to


the national and international high level standards

 All steps of the construction will be recorded by


quality reports

© IdeemaSun 2015 12
Construction Management

Legend
Fist Aid
HSE management
Assembly point
Fire
extinguisher
Health and Safety First Aid is a very important Example Jordan project Mobile toilet
Point during construction.
SITE HSE LAYOUT
Security
Laydown
area Escape route

A separate HSE Manager take care for safety

instructions and follows the whole construction

time all demands to fulfill the HSE process.

Fist Aid pans/ checklists and kits are available on

site

Emergy flow charts are available on site.

© IdeemaSun 2015 13
Construction Management

Logistic management

 A special skilled and trained team of IdeemaSun


logistic department ensures the just in time
delivery of all construction equipment

 An on-site Logistic manager controls the material


flow to- and within the site

© IdeemaSun 2015 14
Module Manufacturer

 High quality and reliability in all Canadian Solar modules is

insured by 13 years experience in module manufacturing.

 Leading global solar company

 9 GW shipped

 More than 7.500 employees worldwide

 359 internal quality tests

 217 patents worldwide

© IdeemaSun 2015 15
Modules key features

Key features

 Salt mist, ammonia and blown sand resistance, for seaside,

farm and desert environments

 Excellent module efficiency up to 16,6 %

 Positive power tolerance up to 5 W

 High PTC rating up to 91,94%

 IP 67 junction box for long term weather endurance

 25 years insurance-backed warranty

 Non-cancellable, immediate warranty insurance

 Linear power output warranty

 10 years product warranty on materials and workmanship

© IdeemaSun 2015 16
Datasheet of Modules

© IdeemaSun 2015 17
Inverter Manufacturer

SMA Solar Technology AG

 As a leading global specialist for photovoltaic


system technology,
 Over 45 GW shipped into 45 countries worldwide
 More then 5000 SMA employees in 21 countries
 Founded 1981 means more then 30 years
experience

© IdeemaSun 2015 18
Key facts of the Inverter

Containerized Inverter Station of to 2,2MWp

 Siemens MV - transformer
 Siemens MV - Switchgear
 Remote control
 Single string monitoring
 Sunny central 2200

- CONTINUATION OF THE SUCCESSFUL SUNNY CENTRAL SERIES

- Performance classes: 2200 kVA and 2500 kVA

- 1,000 VDC and 1,500 VDC version

- Proven B6-topology with more than 98 % efficiency

- Overdimensioning of up to 160 % DC/AC ratio

- Cool concept OptiCool ™ for use in all environmental conditions

- Up to 24 DC inputs

- Room for customer equipment and interfaces

© IdeemaSun 2015 19
Tracking System

 International leading manufacturer of one-axis


solar tracking systems
 Ideematec solutions for more than 900 MW, in 23
countries worldwide
 Branch offices in 5 countries
 Founded 1981 means more then 30 years
experience

© IdeemaSun 2015 20
Tracking System Benefits

 higher yield, in comparison to fixed-mounted systems


 enhanced yield curve – high power over a long time

© IdeemaSun 2015 21
Tracking System Benefits

Flexible Layout

 Nearly every layout feasible


 Suitable for all kinds of surfaces
 Inclination of terrain of up to 20°
 No leveling work required
 Ground Cover Ratio (GCR) freely selectable

© IdeemaSun 2015 22
Tracking System Benefits

Profitable System operation


 Easy to clean : V-position and no connection
rods between tracker rows allow cleaning by
vehicles
 Very low maintenance costs, due to maintenance
free components

Proven Quality & Bankabilty


 99,9 % availability determined since 2007 by
Black & Veatch
 ISO 9001 certified by TÜV Süd
 Technical Due Dilligence by Fichtner
 Windtunneltests by Wacker Ingenieure

Extract from Ideematec brochure


© IdeemaSun 2015 23
Tracking System Technical Data

© IdeemaSun 2015 24
Overview project steps Delta project

Signing Start of Groundwork Supply of Pile


Engineering
of contract construction operations materials driving work

Mechanical Electrical Installation of Medium Grid Commissioning


installation works / Inverters voltage final connection Handover
trackers Cabeling tests

© IdeemaSun 2015 25
Security on site during construction - Delta project

One Person in all 4 corner of the plot. 24/7 ;

in an own small building with electricity

2 Persons at the Main Entrance also with an own

Security check at the Main Entrance for all cars / Trucks


and human.

1 Car on site for regularly inspection around the complete


site

© IdeemaSun 2015 26
Project Consultans/ Advisors - Delta project

ERCC Norensa

 Specialist in providing service in PV systems, has been


involved in over 600MW of wind and solar projects

Ardaman-ACE (arabic consulting engineers)

 Is one of the leading geotechnical companies in EGYPT

 ACE has a staff of over 800

EcoConserv

 Finished the EIAS study for the whole BenBan plot

 Has experience in environmental audits

 Water resource management

 Renewable energy

 Waste management

© IdeemaSun 2015 27
Current status of project steps - Delta project

STEPS which are already done:

 Land survey by ERCC Norensa, Cairo

 Geotechnical report, report is finished and available, by


ERCC Norensa and Ardaman-ACE , Cairo

 3D Plant layout created by Ideematec, ready to build

 Inverter string conception created by Ideemasun

 Road layout, created by Ideematec/ Ideemasun

 Fence layout, created by Ideemasun

© IdeemaSun 2015 28
Current status of project steps - Delta project

STEPS which are already done:

STEPS which are already done:STEPS which are already


done:

© IdeemaSun 2015 29
Current status of project steps - Delta project

Main points of the finished EIAS are:

Water:

 Water can be found underground on a depth of 250


meters. However, this proposal has been ruled out by
the ministry of irrigation.

 Also, it has been advised that there are already 6 wells


that have been dug by a local company called United
Group.

Accommodation:

 New Faris settlement (Komombo district) is also close


to site at around 15 - 20 Km. New Faris village is
completely vacant and it consists of 100 building ready
for accommodation.

© IdeemaSun 2015 30
Current status of project steps - Delta project

Main points of the finished EIAS are:

Health facilities:

 There are 2 facilities in New Faris village (both are


working very well)

Ambulance station:

 There is 1 New Faris village and it is working very well

Transportation & Logistics:

 There are 3 cargo sea ports near Aswan which are Al


Qussaywer port, Safaga port & Hurghada port.

 There is 1 airport

 There is main highway

© IdeemaSun 2015 31
Current status of project steps - Delta project

STEPS will be executed until February 2016

Environmental & Social Impact Assessment Form B:

 Form B is required from the Egyptian authorities

 Under Egyptian Laws and Regulations

 Under IFC Performance standards 1 – 8

 Geographic, ecological, social, health and temporal


context

 Refers to on site and off site infrastructure and utilities


that will be required

e.g.. Transmission lines, sub stations, access road

networks, contractor facilities, storage areas, ….

© IdeemaSun 2015 32
Current status of project steps - Delta project

STEPS will be executed until February 2016

 Feasibility Assessment in Accordance with IFC


Guidelines

 Meteorological analysis/ Weather research and forecast

 Preliminary annual energy production

 Comparative energy yield analysis considering the use


of Horizon Tracking System

 Bankable energy yield prediction

 Providing Metrics to characterize the risk

(P50,P75,P80,P90)

© IdeemaSun 2015 33
Current status of project steps - Delta project

STEPS will be executed until February 2016

 Supply and installation of meteorological weather


station

 Three secondary standard Pyranometer

 Wind speed sensor

 Wind direction Sensor

 Data Logger

 PV Modules

© IdeemaSun 2015 34
Current status of project steps - Delta project

STEPS will be executed until February 2016:

 Ramming/ pull out test

 EIAS study, price is negotiated with the company


EcoConserv - Cairo, ready to order

 Feasibility study according the IFC guidelines, price is


negotiated with ERCC - Cairo, ready to order

 Erecting of a meteostation, price is negotiated with the


company ERCC - Cairo, ready to order

 Preparation EPC Contact

 Termsheet under negotiation

 Preparation O&M contract

 Preparation module delivery contract

 Technical due diligence

 Also all further steps are listed in Ideemasun´s


construction program

© IdeemaSun 2015 35
Thank you
for your attention!
IdeemaSun energy GmbH
Neusling 9c
94574 Wallerfing
Germany

+49 (0)9936-951 09 08-0


info@ideemasun.com
www. ideemasuncom

© IdeemaSun 2015 36

You might also like