What is IBS/DAS ?
IBS Project
3.Implementation work
5.Walk test
PLANNING PROCESS
Survey, IBS Planning
ADA Cellworks
SITE ACQUISITION
Customer request
1. Building Information.
2. Surrounding Network Information.
3. Draft Solution Design.
4. Budgetary Cost Estimation.
ADA Cellworks
SITE SURVEY
1. Propagation Measurement.
2. Final BTS & Antenna location.
3. Final Cable routing.
4. Photos of Antenna Location, BTS Location, Microwave
Pole location.
ADA Cellworks
IF PCM CABLE OR A-BTS IS REQUIRED FOR TX ,THEN MAKE NOTE THAT PCM CABLE LENGTH
IS NOT EXCEEDING BY THAT OF GIVEN SPECIFICATION( UPTO 250 M).
( DO NOT COMPROMISE WITH BTS LOCATION IT AFFECTS POWER CALCUTAION )
ADA Cellworks
INDOOR PROPOGATION
Indoor channels are different from traditional mobile radio
channels in two different ways
• The distances covered are much smaller
• The variability of the environment is much greater for a
much
smaller range of Tx-Rx separation distances.
PARTITION LOSSES
There are two kind of partition at the same floor:
• Hard partitions: the walls of the rooms
• Soft partitions: moveable partitions that does not
span to the
ceiling
• The path loss depends on the type of the partitions
10M
AN5F017
7dB J 15M
20M
15M
AN5F018
CP7dB5F03
SP4W5F03
AN5F019
10M
AN5F020
21M
AN5F025
ADA
Cellworks
J 21M 08M
SP3W5F02 SP4W5F01 SP4W5F03
5M SP2W5F04
10M 7M 18M
AN5F003 AN5F023
15M 11M
AN5F017 J
7dB AN5F020 08M
Cable goes to the sixth floor CP7dB5F03
AN5F009 20M AN5F022
24M AN5F012 23M 23M 7dB
25M
AN5F004 SP2W5F03
10M SP3W5F01 CP7dB5F02
3M 13M
SP2W5F01 CP7dB5F01 30M 19M
AN5F002 AN5F013 09M AN5F016
J
J SP2W5F02 14M
14M 7dB 10M SP2W5F06
14M
6M 14M AN5F008
AN5F005 AN5F021
10dB
09M
SP3W5F03 SP2W5F05
8M CP10dB5F01 SP4W5F02 3M 4M
8M 8M
AN5F001
AN5F140
AN5F014 AN5F015
AN5F006 AN5F007
DUCT – 1( ELECTRICAL)
LINK BUDGET CALCULATION
ADA
Cellworks
IT IS BASICALLY FOR POWER THAT REQUIRED AT ANTENNA END.IT DEPENDS ON THE COMPONENTS
THAT HAS BEEN USED FROM BTS TO ANTENNA THAT IS ERP( EFFECTIVE RADIATED POWER ).
We generally deal with EIRP ( Effective Isotropic Radiated Power ),which is defined below.
EIRP( Effective Isotropic Radiated Power )= ERP( Effective Radiated Power ) + Gain of that component
1) SPLITTERS
2) COUPLERS
3) CABLES
4) ANTENNAS
5) COMBINER
6) JUMPER CABLE
1) SPLITTERS:: ADA
Cellworks
Generally 3 types of splitters are used in IBS which are as follows.
NOTE: Ideally there should be 0 dB loss at through port. But there is always some loss, which is
mentioned in table.
ADA
2) COUPLERS ( Continue ):: Cellworks
THROUGH PORT
COUPLED PORT
INPUT
3) CABLES::
ADA
Cellworks
½ ‘’( LDF4-50 A)
-0.11
7/8 ‘’( LDF5-50 A )
-0.06
1-5/8’’ ( LDF7-50 A )
-0.03
ADA
3) CABLES ( Continue )::
Cellworks
4) ANTENNAS::
ADA
Cellworks
Generally 3 types of antenna are used in IBS, which are as follows.
OMNI ANTENNA
2
PANEL ANTENNA
7
FLAT PATCH OMNI ANTENNA
5
4) ANTENNAS ( Continue ):: ADA
Cellworks
OMNI ANTENNA
ADA
4) ANTENNAS ( Continue ):: Cellworks
PANEL ANTENNA
4) ANTENNAS ( Continue ):: ADA
Cellworks
12 cm
12 cm
TYPE LOSS
TX 1
A
N
T
e. g TRX E
N
N
TX 2 A
ADA
Cellworks
6) LINK BUDGET CALCULATION :: Example with Trunking Diagram:
ADA
Cellworks
To connect female port of other component like our antennas and splitter.
( 2 ) ½ N FEMALE CONNECTOR( L4PNF-RC )
ADA
Cellworks
To connect female port of 7/8 cable at one side and female port of ½ cable or splitter
( 4 ) DIN Male for LDF5-50 A 7/8 inch Cable( L5PDM-RPC )
ADA
Cellworks
Female Port
Female Port
( 6 ) EXTERNAL COMBINER(KAVERI)
ADA
( 6 ) EXTERNAL COMBINER(KAVERI) Cellworks
Female Port
Female Port
Female Port
ADA
( 7 ) EXTERNAL JUMPER CABLE
Cellworks
THIS PORT HAS SIZE SAME AS 7/8 CABLE
AT COMBIER END
AT BTS END
7) BTS Types:
Configuration: 4+4+4
Power: 43 dBm
85cm
25cm
35cm
Configuration: 2+2
Power: 40 dBm
ADA
Cellworks
SECTOR’S JUMPER CABLE
2) FREQUENCY SELECTIVE:
BAND SELECTIVE
ADA Cellworks
IBS IMPLEMENTATION
ADA Cellworks
COUPLER
Couple port/through port is reversed
Input port/through port is reversed
LABELING
All the splitters and couplers should be labeled for easy identification
VENDOR HANDLING
1. Handover site to vendor with all details like work permission,
material storage
space, proper cable routing.
2. Generate MRF for delivery of material to this site.
3. Ask vendor for daily update.
4. Must visit site 2-3 day in week.
5. Ask all details after completion of full site.
6. Get the material details from the vendor
7. Get the BOM (Bill of Material) from the vendor and generate cam
Form for
the site after reconciling the material
ADA Cellworks
IMPLIMENTATION AUDIT
Visit site daily if possible otherwise 2-3 day in week
Check installation is as par plan or change
Decide any changes in antenna location (if require according to
aesthetic,
permission, cable routing etc..)