69° 42.

232’ E, COT Land Road to be developed by


APSEZL
22° 47.377’ N
69° 42.347’ E, 69° 43.280’ E,
22° 47.555’ N 22° 47.551’ N

69° 42.629’ E,
22° 47.387’ N

The proposed plot does not fall


under CRZ
Existing
Road

level of filling: +7.5 mtrs CD


with 95% Proctor compaction

69° 42.642’ E, 69° 43.277’ E,


22° 46.897’ N 22° 46.894’ N