Professional Documents
Culture Documents
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
IFII □ IF
FC THIS APPROVAL OF INTERP
DONE DOES NOT RELIEV
PRETATION OF THE WORK T
VE THE CONTRACTOR OF
CONTRACTUAL RESPONSIBIILITIES.
TO BE
F THE
ONLY DO
OCUMENTS WITH ENG. SSIGNATURE
E ARE VALID
D
IN-HOUSE REVISIONS
S DOC
CUMENT RE
EVISIONS
D D
C C
B B
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
A A
REV
V. DESCRIPTION DESG. PREP. CHK. APP.
A DATE
E REV. DES
SCRIPTION DESG
G. PREP. C
CHK. APP. DATE
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
Page Page
UMENT REV
DOCU VISIONS Remarkss IN-HOU
USE REVISIO
ONS Remarks
No. No.
0 A B C D E F G 0 A B C D E F G
1 * 1 *
2 * 2 *
3 * 3 *
4 * 4 *
5 * 5 *
6 * 6 *
7 * 7 *
8 * 8 *
9 * 9 *
10 * 10 *
11 * 11 *
12 * 12 *
13 * 13 *
14 * 14 *
15 * 15 *
16 * 16 *
17 * 17 *
18 * 18 *
19 * 19 *
20 * 20 *
21 * 21 *
22 * 22 *
23 * 23 *
24 * 24 *
25 * 25 *
26 * 26 *
27 * 27 *
28 * 28 *
29 * 29 *
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
30 * 30 *
31 31
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
32 32
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
Content:
C
1 REFERENC
R CE DOCUM
MENTS 4
2 PART
P A (D
DIVERTER
R & GUILL
LOTINE) 5
2.1
2 DESCRIP
PTION 6
2.2
2 SYSTEM
M FUNCTION
NAL DESCRIP
PTION 6
2.3
2 LOCAL CONTROL PANEL
P FUNC
CTIONS 10
2.4
2 LOGIC INTERLOCK
K 19
3 PART
P B (H
HPU) 20
3.1
3 GENERA
AL DESCRIP
PTION 21
3.2
3 FUNCTIONAL DESC
CRIPTION 22
3.3
3 OIL LEV
VEL AND TEM
MPERATURE CONTROL
L 29
3.4
3 Alarms 30
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
1 Reference
R e Documeents
Diverter Damper
D Systeem - P&ID TSM/B1-00/TG-G-02-T
TP3-368
Gas Turbiine Drainage - P & ID TSM/B1-00/TG-G-02-T
TG3-377
Piping & Instrument
I Diagram Legen
nd TSM/B1-00/BP-G-02-P
PG3-001
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
2 PART
P A (DIVER
RTER & GUILLO
G OTINE)
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
22.1 DESCRIPTION
N
T
The diverter and
a Guillotin
ne system consisting of the following iteems:
- Diverteer damper
- g air system, for the diverter damper.
Sealing
- Hydrau
ulic Power Un
nit and relevaant Local Con
ntrol Panel.
- Oil pip
pes and fitting
gs to connect the h the diverter damper.
t HPU with
- Cabless and cablewaays between th
he LCP and th
he site instrum
ments / electrric devices.
- Extenssion duct.
- Guillottine damper.
22.2 SYST
TEM FUNCTIONAL
L DESCRIPTION
F
From the functional point of view, the system
s under description tto be composeed of the folloowing main ittems:
A
A) No. 1 diverter
d dam 0AA001), hav
mper (MBR20 ving the folloowing functionns:
M
Main featuress of the divertter damper:
provided on both sides of a perip pheral row off flexible elemments (doublee contact) whhich come in ccontact with
the lan
nding bar to make
m the gas sealing.
s
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
- One “ttoggle-arm sy ystem” compo osed by a cou uple of leverss welded to a driving tubee + a couple oof pull-rods.
The puull-rods are co o end to thee levers and aat the other ennd to the bladde by means of spherical
onnected at one
joints, in order to allow eventual light misalignments and eeventual differrential expannsions of the pparts.
- Landinng bars havin ng a “hollow box section”” where the ssealing air is injected; thee box is provvided with a
series of holes (pitcch about 200
0 mm), so thhat the sealingg air is forceed to get outt of the box through the
flexiblee elements.
- Supporrts of shaft arre self aligning and self-lub
bricating typee, located exteernally to the diverter fram
me. They are
not sub
bjected to dirrect hot gas temperature.
t The internal spherical parrt is made off cast iron annd internally
lined with
w a layer off graphitized material.
m
- Supporrts of Blade are
a self aligning and self-llubricating tyype, located iinternally to tthe diverter fr
frame; being
inserted in the intern
nal ambient of
o the diverterr box, they aree suitable for the full gas ddesign temperrature.
- Seals of
o shaft are stu
uffing box typ
pe.
- Frame insulation is made by meeans of ceram
mic fiber + claadding stainleess steel platees + retainingg pins (total
thickneess 150 mm)
- Insulattion of blade is made by means
m of ceram
mic fiber + clladding stainlless steel plattes + retainingg pins (total
thickneess 150 mm each
e side of th
he blade)
- Normaal opening-clo
osing time (0°° - 90°): abou
ut 60 sec.
- G (90° - 0°): about 20 secc.
Emergency closing time to HRSG
- No.2 drain
d nozzles are foreseen in the divertter wall at byypass side (im
mmediately aabove the landing bar, in
order to limit the am
mount of the rain
r which can n accumulatee when the divverter blade iss closed to byypass side.
- No.4 loocking devicees are foreseeen for safe keeeping of thee blade in closure to HRSG
G side duringg the HRSG
mainteenance.
WWhen the div verter blade iss closed to HR RSG side, it can
c be movedd from that poosition (openning the way tto the HRSG))
oonly if the gu
uillotine bladee is completelly lifted and th
he guillotine’’s entry door is totally clossed.
T
The diverter is
i provided with
w the follow
wing instrumeentation:
- No.1 poosition transmitter, for feedback signal to LCP annd to DCS (MB R20CG101); thee signal 4-20 mA
A of this positionn transmitter is
translateed by the DCS lo
ogic in a positio
on degree, whichh is compared wwith the current pposition set; as a result of this coomparison, the
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
- Other instrumentation
i is
i described in th
he chapter relevaant to the sealingg air system.
B
B) No. 1 sealing
s ystem for div
air sy verter damper, whose functtion is to guar
arantee a certaain level of aiir
pressurre in the sealling chambers of the diverter; this presssure level w
will be at leasst 50 mmH2O O
higher than the inteernal gas preessure; in thiss way the perrfect gas seaaling will be ensured. Thiis
system
m is composed d of the follow
wing items:
- No.2 air
a fans (MBR R31AN001 an nd MBR32AN N001), one off them is norm mally runningg, the other is as stand-by
and wiill be a`utomatically starteed in case off failure of thhe first fan, oor If the diffeerential pressuure value in
g plates area and hot Gas to be lower than 50 mmH
sealing H2O or whenn pressure traansmitter MB BR33CP101
show thhe pressure leess than 500 mmH2O
m 12 Second
S after sstarting the firrst fan.
- No. 1 sealing air du uct system, conveying thee sealing air tto the sealingg air chamberrs (one locateed at HRSG
side, th
he other located at bypass side).
s
- No. 1 filter-silencerr (MBR31AT T001and MBR R32AT001) aat inlet of fanns; the filter ccan be easily opened and
the releevant cartridg
ge quickly repplaced. The aiir, before enteering the air ffilter is obligeed to follow a “not direct
path” so
s that the heaaviest particlees can by sepaarated from thhe air flow beefore enteringg the filter.
- No. 2 expansion
e join
nts, DN 14” textile
t type, in MBR31BQ001 and MBR32BQ001).
nstalled on faans’ outlets (M
- No. 2 check
c valves (size 12”) on outlets of fan
ns (MBR31A BR32AA001). A reducer ((14” to 10”)
AA001 and MB
is instaalled after the check valve.
- No.2 manual
m air intercepting valv
ves (butterflyy type size 100”) manually aactuated by m
means of a redduction gear
(MBR3 31AA002 and MBR32AA A002), installed on outletss fans; they aare both norm mally open; tthese valves
have to
o be closed when
w the relevant fan or thee relevant che ck valve needd some mainttenance).
- No. 2 expansion jo
oints, DN 10 pe, installed upstream thhe motorized air interceptting valves.
0” textile typ
(MBR333BQ001 andd MBR34BQ0 001).
- No.2 motorized
m airr intercepting valves (buttterfly type, siize 10”) elecctrically actuaated, installedd on the air
ducts conveying
c thee sealing air at the diverter’s sealing chaambers (MBRR33AA001 annd MBR34AA A001).
- The sealing air systeem is provideed with the following instruumentation:
- No.2 differential
d preessure transmmitters, one for each sealingg air chamberr (MBR20CP101 and MBR R20CP102).
These transmitters make
m a moniitoring of the differential ppressure exissting betweenn the sealing air chamber
and thee gas duct. Eaach transmitteer is connected at one side to a pressure intake locateed in the diverrter box and
at the other side too a pressure intake
i d in the diverrter’s landingg bar. In thiss situation, thhe measured
located
differential air presssure is not on
nly the one acrross the flexibble sealing ellements, but aalso the air prressure drop
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
differential value becomes loweer than 240 mmH2O m (whiich means 500 mmH2O thrrough sealingg elements),
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
C) No. 1 Hydraulic
H Powerr Unit (HPU). A detailed descrription of this unnit is given heree under part B. T
The HPU will bbe
i a cabinet.
located in
D
D) No. 1 Local Contrrol Panel, insstalled on onee external sidde of the cabinet. On fronnt of the doorr,
there iss a selector for mber of pushbbuttons and llamps. The caabinet and the
f local-remotte, with a num
local panel
p will bee provided with
w a shed to avoid dirrect sun radiiation. A com mplete list oof
pushbuuttons and sig gnal lamps iss given in thee chapter 2.3..1. For comm
missioning or maintenancee,
the opeerator can seleect the local mode
m and conntrol some of the equipmennts locally.
E
E) No. 1 Guillotine damper
d (MBR R40AA001), whose functtion is to isollate the HRS SG during anyy
mainteenance. The blade,
b me of guillottine through a
operateed by an elecctric winch, eenters the fram
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
perfectt gas tightness toward the atmosphere is i ensured. Thhe blade can be lowered oonly when the
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
blade of
o diverter is closed to HR RSG side and the sealing aair system is iin function; iff this cautionns
are nott observed, irrreversible daamages can occur
o to the bblade of guilllotine, with ddistortion andd
subseqquent impossib bility to operrate the blade itself. The gguillotine is prrovided with the followingg
instrum
mentation:
- No.3 lim
mit switches, for complete opening of th
he blade (MB
BR40CG081-882-83)
- No.1 liimit switch, for
fo complete closing
c of the blade (MBR
R40CG084)
- No.1 liimit switch, for
fo complete opening
o of thee entry door ((MBR40CG0091)
- No.1 limit
i switch, for complete
c closing
g of the entry door (MBR40CG0092)
T
There is a locaal control panell for controllin
ng the guillotine which consissts power and ccontrol sectionns and is providded with below
w
signals:
F
F) xtension duct, located
No. 1 Ex l between
n the diverter ou
utlet and the guilllotine inlet. This duct is provideed with:
- No.1 ve
ent pipe (3” diiam.), with a manual interccepting valve (butterfly typpe)
- No.1 drain pipe (2” diaam.), with a mannual interceptingg valve (butterflyy type)
R
Relevant fram
me insulation is made by meaans of ceramic fiber + claddiing stainless stteel plates + retaining pins ((total thicknesss
150 mm)
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
22.3 LOCA
AL CONT
TROL PAN
NEL FUNC
CTIONS
2.3.1 General deescription
- Collectt some of th
he signals com ming from th he electrical--instrumentation devices included withhin diverter
damper battery limits; these signals are taken to the LCP’s terminal boxx for remote trransmission too DCS.
- Receiv
ve the signals coming from
m DCS, necesssary for the coomplete systeem managing.
- Contro
ol the position nd the sealingg air fans by ppush buttons (these signals are sent to
n of the bladee and comman
DCS annd the commands come baack from DCS S).
Pushbutton
ns for manuall operation off:
- Div
verter blade cllosure to HRS SG (*)
- Div
verter blade cllosure to Byppass (**)
- Div
verter blade emmergency clo osure to HRSG G (about 20 s ec.)
- Seaaling air fan1 start (pushbutton + lamp)
- Seaaling air fan1 stop
- Seaaling air fan2 start (pushbutton + lamp)
- Seaaling air fan2 stop
- Lammps’ check
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
- Local indications
i fo
or status signaals of HPU’s general
g statuss, and for all eequipment staatus:
- Local operations
o alllowed (LA
AMP)
- Presence main poweer R-S-T (Noo.3 LAMPS)
- HPU reeady to operaate (LA
AMP)
- HPU oil
o pressure L (LA
AMP)
- HPU oil
o pressure LL
L (LA
AMP)
- HPU oil
o pressure H (LA
AMP)
- Diverteer blade closeed to HRSG ((No.1 lamp, aassociated witth pushbuttonn)
- Diverteer blade closeed to Bypass ((No.1 lamp, aassociated witth pushbuttonn)
- Diverteer blade posittion Analogicall
- Sealing
g air fan1 run
nning ((No.1 lamp, aassociated witth pushbuttonn)
- Sealing
g air fan1 motor fault (LA
AMP)
- Sealing
g air fan2 run
nning ((No.1 lamp, aassociated witth pushbuttonn)
- Sealing
g air fan2 motor fault (LA
AMP)
- Sealing
g air automatiic valve (HRS
SG side) open
n (LA
AMP)
- Sealing
g air automatiic valve (HRS
SG side) closeed (LA
AMP)
- Sealing
g air automatiic valve (HRS
SG side) cum
mulative fault (LA
AMP)
- Sealing
g air automatiic valve (bypaass side) open
n (LA
AMP)
- g air automatiic valve (bypaass side) closed
Sealing (LA
AMP)
- Sealing
g air automatiic valve (bypaass side) cum
mulative fault (LA
AMP)
- Differeential pressuree L (HRSG siide) (LA
AMP)
- Differeential pressuree L (bypass side) (LA
AMP)
- Diverteer’s emergenccy closure to HRSG (LA
AMP)
A
Acting on the display, the operator can n request the authorizationn for the funnctioning in L Local; this auuthorization,
w
when given by y DCS, is put in evidence on
o the panel ittself. In this ssituation, the llocal operatorr can perform
m the actions
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
deescribed in thhe following chapter 2.3..2; the operaator must act on the selecctor in orderr to switch ooff the local
auuthorization request.
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
2.3.2 Functionin
ng in LOCAL
L
Th
he local mod
de is authorizzed just in maintenance.
W
When the loccal mode is au
uthorized, the operator can do the follow
wing actions, acting on front panel of thhe LCP:
- Open and close the diverter blade to
o the HRSG an nd Bypass
- Command d the executio
on of the emerrgency closurre of the diverrter’s blade (tto HRSG sidee)
- Start-stop the sealing air fans
Notes:
W
When the LC CP is workingg in local mod
de, in order to
t give back tthe control too the DCS thee operator muust switch-thee
selector to rem
mote position
n. From this moment,
m the DCS
D has the ppossibility to ttake the total control of thee system.
In
n this case thee system can work
w in the fo
ollowing two modes:
- “DCS-manuual”
- “DCS-auto””
DCS-MA
ANUAL
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IIn “DCS-MA
ANUAL” mod
de all the motors and actuaators are not m
managed by D
DCS logic.
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
WWhen in “D DCS-MANUA
AL” mode, the
t operator located at D
DCS control room can ddo the follow
wing manual
ooperations:
- Open and
a close the diverter bladee to the HRSG G and Bypasss.
- Start-sttop the sealin
ng air fans; thiis operation can
c be made ffrom DCS-MA
ANUAL modde.
The ab bove operations can be made from DCS-MANU UAL mode, only if the DCS has nnot given thee
n to the LCP for working in local; in case
aauthorization c this authhorization wass given, the D
DCS must wait until local
ooperations aree finished and
d the control is
i given back
k to DCS itsel f.
DCS-AU
UTO
IIn this mode, the DCS logic is managin
ng all the systeem in automaatic mode.
IIn this situatiion the DCS sends to the LCP all the signals necesssary to manaage the HPU system and the diverter’ss
sealing air sy
ystem.
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
T
The LCP sennds back all th
he signals neccessary for th
he DCS to knoow the state oof the system
m. The LCP ccommunicatess
w
with the HPU
U and receivess signals from
m the local insstrumentationn and limit sw
witches.
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
W
When operatiing in “Auto”” mode, some important logic interlockss are foreseenn (see chapterr 2.4).
a) AAs soon as th
he GT starts, the
t DCS com mmands the sttart of the air fan No.1 (thee one that is nnormally runnning): let us
say the fan MBR31AN00
M 1 (note that periodically
p DCS
D gives an alarm to the operator to exxchange the ffan which is
nnormally runnning with the fan that is no
ormally in staand by as soonn as possible)).
b) A
After a defin
ned period of time (12 secc.), correspon
nding to the sstarting time of the fan, iff the pressuree transmitter
M
MBR33CP10 01 (located on the commo on fans outlet) is not giviing a pressurre signal lower than a sett value (500
m
mmH2O), thee first fan is stopped
s and th
he DCS can proceed
p with tthe phase “e”” of this sequeence; otherwisse:
c) The DCS com
mmands the start
s of the airr fan No. 2 (M
MBR32AN0001).
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
d) A
After a defin
ned period off time (12 secc.) correspond
ding to the sttarting time oof the fan, iff the pressuree transmitter
M
MBR33CP10 01 (located on the commo on fans outlet) is not giviing a pressurre signal lower than a sett value (500
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
mmmH2O), the first fan is stopped and d the DCS caan proceed wwith the phasee “e” of this sequence; ottherwise the
ppressurization
n system is in
n “fault” and the
t DCS can only
o go to thee phase “h”.
e) C
Check of th
he status off the air inttercepting vaalves’ limit switches (siignals from closure lim
mit switches
M
MBR33/34AA001-S03). If the valves are
a not closedd, the LCP coommands theiir closure.
f) TThe DCS com mmands the opening
o of thee air interceptting valve loccated at HRSGG side (valve MBR33AA0001) sending
iin this way th
he air to the sealing air chaamber of the diverter.
d The other air inteercepting valvve (MBR34AA
A001) stays
iin closed position.
g) AAfter a defineed period of time
t (30 sec.) (correspondiing to the opeening stroke oof the valve (222sec)plus a ccertain extra
8sec) if the signal
s comingg from the op pening limit switch of thee valve is preesent (MBR33AA001-S022) the DCS
sequence is successfully ended, otherw wise the pressu
urization systeem is in “faullt”; the air inttercepting vallve could be
llocked in an intermediate
i position
p and an
a operator shhould go to thhe plant to verify the statuss of the valvee (eventually
oopen the valvve manually)
h) A
At this time the
t gas turbine can be startted in simple cycle
c (exhausst gas totally sent to bypass stack).
c)) If the signaal coming froom the closin ng limit swittch of the vaalve MBR33//34AA001-S003 is not preesent after a
defined periiod of time (3
30 sec.) corresponding to the
t closing strroke of the vaalve plus a ceertain extra tim
me, then the
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
2.3.7 Emergency
y conditions
T
The following
g events (inteernal to the LC
CP / HPU / Diverter
D system
m) can produce an emergeency situationn:
E
Event Coonsequence on diverter damper
11. Emergency
y for very low
w pressure in accumulators
a 1. Hydrraulic Pumps are off. Diveerter is closedd in
emergeency mode.
22. Emergency
y for very low
w oil level in HPU
H 2, 3. H
Hydraulic Puumps are off. f. Diverter staays in its
33. Emergency
y for high oil temperature in
i HPU positionn by the acccumulators upp to the timee that the
pressurre reaches 1000bar. Then, thhe diverter is closed in
emergeency mode.
TThe emergency conditionss listed in the previous tablle can be activvated in all thhe operating cconditions:
- “DCS--auto” mode
- “DCS--manual” mod de
- “Locall” mode
IIn addition, when
w workinng in “DCS-aauto” mode, as a consequuence of exteernal process situations thhe DCS can
ccommand thee trip closure of the diverteer’s blade to th
he HRSG (strroke time aboout 20 sec).
ccircuit; the deecreasing beloow the mentioned set poinnt can happenn after hours oof staying in pposition of thhe blade, but
iit is impossib
ble to define an
a exact time.
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
3 PART
P B (HPU)
(
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
33.1 GENE
ERAL DE
ESCRIPTIO
ON
TThe followingg description talks about thhe hydraulic power
p unit thhat manages thhe movementts of a diverteer blade.
TThe handlingg of the blade is operated by y two couple of hydraulic cylinders moounted on the diverter’s casse and
cconnected to the command d shaft througgh levers of coontrol dedicatted.
TThe alimentation of hydrau ulic fluid for the cylinders is assured byy a high presssure power unnit that managges every
function and movement off the diverter’s blade.
T
The hydraulicc power unit is
i composed by
b the follow
wing componeents:
nk “MBR01BB
Oil tan B001” (realizzed in carbon steel with insspection hole on frontal sidde),
N.1 levvel gauge “MBR01CL501””.
N.1 levvel transmitteer “MBR01CL L101”.
N.1 levvel switch “M MBR01CL001 1”.
N.1 temmperature ind dicator “MBR R01CT501”.
N.1 temmperature tran nsmitter “MB BR01CT101”.
N.6 preessure indicattor “MBR01C CP501 ~ 506””.
N.3 preessure transm mitters “MBR0 01CP101/102 2/103”.
N.1 fillling plug withh filter “MBR R01BS001”.
N.1 baall valve for oiil discharge “MBR01AA2
“ 01”.
N.2 retturn filters “M
MBR01AT013 3/014” with electric
e cloggiing switches ““MBR01-CP003/004”.
N.2 airr-oil heat exchhangers “MBR01AN011/0 012”.
N.2 eleectro pump grroups verticall axis “MBR0 01AP001/0022”.
N.2 asyynchronous 3-phases
3 electtric motors “MMBR01AP00 1-M01/AP0002-M01”.
Safety valves, check k valves and by-pass
b valvee.
N. 1 emmergency han nd pump comp plete of leverr and control/iinterception vvalves “MBR
R01AP011”.
N. 2 Prressure filterss “MBR01AT T011/012” witth electric cloogging switchhes “MBR01C CP001/002”.
N. 1 seet of electro-p
pneumatic acccumulator blaadder type “M MBR01BB0111/012/013”, w with nitrogen ppre-load,
compleete of relevan nt interceptionn pre-load valves (MBR01A AA101/102/1103) relevant discharge vaalves
(MBR0 01AA203/204 4/205) and reelevant safety valve (MBR001AA725)
N. 1 caabinet realized d with sheet of
o carbon steeel with accesss door.
N. 1 lo
ocal control paanel
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
33.2 FUNC
CTIONAL
L DESCRIP
PTION
3.2.1 Oil pumps
Thhe hydraulic power
p unit is provided witth n.2 oil pum
mps perfectly iinterchangeabble, capable oof providing ooil in
prressure to maiin manifold; connected
c to accumulatorss and to hydraaulic cylinderrs of the diverrter.
Thhe first pumpp “MBR01AP P001”, (calledd PRIMARY PUMP)
P normmally works, wwhile the secoond pump
“MMBR01AP00 02” (called SE ECONDARY PUMP) is in stand-by, reaady to start iff the oil pressuure decreases under
1110bar (PLmin n).
A
After 168 hourrs of service ofo the first pum i issued in D CS and the opperator shoulld change the roles of
mp, a signal is
twwo pumps as soon
s as possibble; make thee PRIMARY pump p SECON NDARY and the SECOND DARY pump,,
PR RIMARY.
Thhe start/stop, of the electricc motors of th
he oil pumps, can be comm manded by DC CS, accordingg to the logic shown in
thhe table below
w; depending on the oil preessure “P” meeasured in the main line. Thhe value of thhe oil pressuree “P” is
m
measured by No.3
N pressure transmitters “MBR01CP1
“ 01/102/103” that send a 4--20mA signall to the DCS. DCS
haandles these signals
s with “2oo3” logic.
Puumps will be off in case off receiving low w low level and
a high high temperature signal in DCS S.
Thhe pressure inn the circuit can
c be quickly y checked thro
ough the No.66 pressure gaauges (PI) insttalled into thee HPU :
Tatt1 120 s*
pressurrization phasee
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
Starting
g waiting tim
me of the Secondary pump duringd
Tatt2 60 s*
changeeover procedu ure
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
Priimary pump
Oil pressure Action
n N
Note
stattus
Iff the oil presssure doesn’t
reeach the PL vvalue until thee
T
Tatt1 time, thee exchange
The oill is sent to thee main coommand for tthe two pumpps is
PRIIMARY PUM
MP line * [solenoid
[ valvve is isssued. After cchangeover, iff
0 <P< PN
Nmin
RU
UNNING energizzed] thhe two pumpss are ON for
“MBR R01AA716” T
Tatt2 time andd they can nott
m
make the presssure PNmin, tthe
coommand for sshutdown of tthe
twwo pumps is iissued.
In casee of T ≥ 48°C C,
primarry pump is runnning
PRIIMARY PUM
MP and oill is re-circulatted into
T
The circuit’s ppressurizationn is
RU
UNNING the tan
nk [solenoid vvalve is
coomplete, the system move to
P >= PN
Nmax de-energized]
thhe condition ““B” - Normaal
“MBR R01AA716”
opperating
PRIIMARY PUM
MP
In casee of T <43°C,, pumps
STO
OPS
are offf
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
Primary pump
Condition Oil preessure Action Note
status
The bblade is moveed with a
connstant pressuree to the
PNmin ≤ P < PN- PRIMARYY [so lenoid valve is desireed position. T
To fullfill
B
Blade in the
movve PUMP IS
S energized] this aaction, controllling PN-
Movement
RUNNINGG “M
MBR01AA7166” move is performeed by the
relief valve of
MBR01AA7716.
Justt in case of T ≥
48°C,, primary pum mp is
runnning oil is ree-
circullated into the tank
PRIMARYY
[solennoid valve is de- 1000% of the oill is re-
(P>= PN
Nmax) PUMP IS
S
energized] cirrculated to thee tank.
STOPPEDD
B
Blade In the “MB BR01AA716”” up
position to thhe time that ooil
tempperature reachhes
43°C.
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
TThe oil contaained in the front chamberss of cylinders flows to the ooil tank.
WWhen the com mplete closurre to by-pass isi reached, thee proportionaal valve (MBR R01AA718) hhas to receivee from DCS a
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
signal of 12m
mA so switcheed in its central position (cutting the waays to cylinderrs), pump stops and the soolenoid valvess
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
W
When the div
verter’s blade comes close to its end stro
oke position, its speed decrreases for efffect of the breeaking
system mounnted on the cylinders.
- If the presssure decreasees less than PNNmin, primarry pump is ON N up to the ttime that pressure reaches PPNmax, as
long as puump is ON, so olenoid valve (MBR01AA716) is energgized.
- If temperaature increasees more than 48°C,
4 primaryy pump is ON N up to the tim me that tempeerture reachess 43°C, as
long as puump is ON, so olenoid valve (MBR01AA716) is deeneergized.
- In case booth happens, pressure
p contrrolling has priiority to tempperatre controolling.
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
HPU management
m during
d the con
ntrol position:
Emerg
gency case
Thhe emergency y closing is reealized with a dedicated hyydraulic circuuit that conneccts the accummulators side oof circuit to
thhe cylinders annd the dischaarge side of th
he cylinders to
o the oil tank;; the accumullator rack is ddesigned to prrovide oil in
quuantity/pressuure enough to run two com mplete closing movements ffrom the com mplete open poosition of the diverter
w
without the hellp of two oil pumps.
p
Thhe emergency y circuit is designed to runn the completee closure of thhe diverter in 20s; the finall phase of thee cylinders
strroke is providded with an adjustable brak t reduce the impact betweeen the blade and the structure of the
king system to
diiverter.
Thhe emergency y closing is coommanded by y the two soleenoid valves ““MBR01AA7720/721” on tthe “emergency circuit”:
thhese valves arre energized during
d the norrmal operationn. For the em
mergency closiing de-energiizing of one oof these two
vaalves is enouggh (1oo2).
Thhe emergency y closing signnal must be prrevailing overr any other oppen/close signnal. During thhe emergencyy closure the
m
main distribution valve musst be de-energ gized (MBR01AA718-S11 /S21).
Inn Local mode, the emergenncy closure to o the diverteer blade can be commandedd by the locall operator,
o HRSG side of
accting on the proper pushbu
utton of the LCCP.
HPU Trip
p
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
HRSG Trrip
Inn this case cau use of trip is outside
o HPU (e.g.
( any prob blem in HRSG G).
- During g emergency trip,
t Pump is turned off and all valves aare deenergizeed.
- After complete
c closure of the blaade (2oo3 of limit
l switchess MBR20CG0091/092/093))
IIf the pressurre decreases leess than PNmmin, primary pump
p is ON uup to the timee that pressuree reaches PNm
max, as
llong as pump p is ON, solen noid valve (M
MBR01AA716 6) is energizedd.
IIf temperaturre increases more
m than 48°CC, primary pu ump is ON upp to the time that tempertuure reaches 433°C, as long
aas pump is ON, solenoid valvev (MBR01AA716) is deenergized.
d
IIn case both happens,
h presssure controlliing has prioriity to temperaatre controllinng.
VValves MBR R01AA720/721/717/718 rem main de-energ gized,
Thhe sequence of
o operations is the followiing:
L
Logic elemen
nts MBR01AA
A713/714 hav
ve to be closeed.
T b valves MBR01AA007
The manual ball 7/008 have to be opened
T
The hand pummp lever has to
t be inserted
d and used forr manual operrating of the ppump MBR011AP011.
T
The manual selector
s MBRR01AA715 haas to be switch hed in order tto select the w
way of blade m
movement.
T
The valves (M
MBR01AA71 16/717/718) are
a de-energizzed.
Before coming
g back to automatic operatiion, the follow
wing operatioons have to bee performed:
L
Logic elemen
nts MBR01AA
A713/714 hav
ve to be restored in the inittial conditionns
T
The manual ball
b valves MBR01AA007 7/008 have to be closed.
THIS DOCUMENT IS A PROPERTY OF DESIGNER TEAM SO NO UTILIZATION
IS PERMITTED WITHOUT ANY PRIOR DESIGNER PERMISSION OR
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
Tempeerature
CS alarm
DC Inter-block
situation
w Oil
Low
T < 9 °C
° The heateer(s) is startedd, the operatioon of the pum
mps is allowedd
Tem
mperature
12 °C ≤ T ≤
The heateer(s) is turnedd off
65 °C
Both heatt air exchangeers start to woork simultaneously in
temperatu ure more thann 48°C and turrn off under 443°C. When
HPU is ru unning, pumpp should start and recirculaate oil in case
T ≥ 48°C of high teemperature (mmore than 48°C), wheneverr pump is ON N
to cool the oil, valve M
MBR01AA7166 should be ddeenergized.
For Valvee MBR01AA7716, Pressuree control is prrevailing on thhe
temperatu ure control.
gh oil
Hig
T > 65°C Temperatture High, Alaarm in DCS
tem
mperature
Hydraulicc Pumps are ooff. Diverter sstays in its poosition by the
Hig
gh-high oil
T > 75°C accumulaators up to thee time that thee pressure reaaches 100bar,
tem
mperature
and then the
t diverter iss closed in em mergency modde.
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم
CONTR
RACTOR CONS
SULTANT: CLIENT
T:
KHUZEESTAN MAPNA
A GENERATION CO.
PRO
OJECT: BEHBAHA
B AN COMB
BINED CY
YCLE PO
OWER PLA
ANT ( B.O
O.O )
Thhe quantity of the oil in thee tank can be quickly checcked trough thhe visual oil leevel indicatorr (LI) installeed on the tank
k
“M
MBR01CL50 01”.
(*) Thee final values will be set duuring the firstt test
33.4 Alarm
ms
Thhe following alarms are av vailable in DCCS (in these cases the operration of the uunit is still posssible, but is nnecessary to
coontrol and elim
minate the caause of the alaarm):
OIL PUM
MP 1 (MBR001-AP001) FAAULT
OIL PUM
MP 2 (MBR001-AP002) FAAULT
PRESSUURE LINE 1 OR 2 OIL FIL
LTER CLOG
GGED (MBR001-CP001/2)
RETURNN LINE 1 OIIL FILTER CLOGGED (M
MBR01-CP0003/4)
CLIENT : Ow
wner's Doc. N
No. : Exxt.Rev:0
KHUZESTA AN
MAPNA TSM
M/B1-IA-04--AF0-438
GENERATION nt.Rev:0
In
CO.
MAPN
NA'S DOC NO: Filee No. : D
Design Stage
TSM//B1-00/TG-G-0
04-TP3-338 Basic
AUTHORIZATIIN
Bas
sed on: TUGA. No.
B1-DD-01-9C210-A-338
Con
ntract No. :
ﻃﺮح ﻧﻴﺎم