You are on page 1of 1

DRAINAGE DRAINAGE DRAINAGE

FACILITY FACILITY FACILITY

INLET WATER LINE PIPE 450DN BOP=1171.773


TO TANK R1

BOP=1171.773

O/F PIPE 300NB

O/F PIPE 300NB


BRANCH 250NB

BRANCH 250NB

BOP=1171.773
BRANCH 250NB

NOTE:8 TO COLONY
PIPE 450DN BOP=1172.900

PIPE 500DN BOP=1173.250

Angelique - Gannon Dunkerley (J.V)


PROJECT ENGINEERING, PROCUREMENT AND CONSTRUCTION COMPANY

CIMA INTERNATIONAL
CAMROON WATER UTILITIES CORPORATION
004/M/CAMWATER/DSCM
/CIPM/AFD-BEI/2017 Travaux de réhabilitation, renforcement et
Extension de l'approvisionnement en eau potable pour
la ville de Ngaoundere- CAMEROUN

PVS 09/08/17 GA OF TANK R4

GRB 09/08/17

NDP 09/08/17 --
AS SHOWN 0 1 2

You might also like