You are on page 1of 1

NATIONAL SLUMP

UPGRADING PROGRAM
(NSUP)

200 PROPINSI
SULAWESI UTARA
KOTA
MANADO
KECAMATAN
BUNAKEN KEPULAUAN
KELURAHAN
240 TANGGA BESI
ALUNG BANUA
DIBUAT OLEH:
FASILITATOR TEKNIK
80 RAILING BESI HOLLOW RAILING BESI HOLLOW
BESI Ø12 - 150 MM
(RANGKAP)
PIPA PERNAFASAN BAK
20 GALVANIS Ø2" RING BALOK 15/20
PLAT PENUTUP BAK BETON K-225
RING BALOK 15/20
- BESI STRIP,
BETON K-225
T= 10 CM, BETON K-225 SILVIA PANDELAKI
KOLOM BETON 25/25
- BESI SIKU,
- DYNABOLT
BETON K-225 DIPERIKSA OLEH:
BESI Ø8 - 150 MM
BESI Ø12 - 150 MM
(RANGKAP)
ASKOT INFRASTRUKTUR
200
BESI 6Ø12 MM
LANTAI KERJA, BETON 1:3:5
LANTAI BAK, T= 12 CM
BETON K-225 SLOOF BETON 15/20
SLOOF BETON 15/20 BETON K-225
BETON K-225
BESI Ø12-150 MM HENKY A. ERUNGAN, ST
SELASAR, T=6 CM
20 PASANGAN BATU PONDASI BETON K-175 DISETUJUI OLEH:
14 CAMP 1:4 TIMBUNAN TANAH
16
54

16
TIM TEKNIS BPPW SULAWESI UTARA
25
5 20
URUGAN PASIR, T= 5 CM 50
PASANGAN BATU KOSONG, T= 15 CM
65

_______________________
NAMA GAMBAR
AS-BUILT DRAWING
POTONGAN
SKALA 1:50 NO. GAMBAR JLH. LEMBAR

You might also like