Project: Proposed 2-Storey Residential Singly Attached

Project No.: 001

Location: Narra Street, Barangay Bucal, Calamba City, Laguna

Owner: Man and Land Incorporated

WEEKLY REPORT

(December 2, 2020)

Date: December 2,
Weather: A.M. – Sunny
P.M. - Sunny
Activities:
 Installation of CHB for interior and exterior walls
 Installation of electrical wires and pipes
 Installation of pipes for drainage and sewer lines
 Plastering of exterior walls
 Construction of Septic tank
 Preparation for concreting of stairs
 Installation of roof purlins and rafters
Materials Consumed:
 Reinforced Steel Bars
 Concrete
 Scaffoldings
 Concrete Hollow Blocks
 Purlins and Rafters
 PVC pipes for sanitary and electrical
Materials Testing : N/A

Date: December 3
Weather: A.M. – Sunny
P.M. - Rainy
Activities:
 Installation of CHB for interior and exterior walls
 Installation of electrical wires and pipes
 Installation of pipes for drainage and sewer lines
 Plastering of exterior walls
 Construction of Septic tank
 Preparation for concreting of stairs
 Installation of roof purlins and rafters
Materials Consumed:
 Reinforced Steel Bars
 Concrete
 Scaffoldings
 Concrete Hollow Blocks
 Purlins and Rafters
 PVC pipes for sanitary and electrical
Materials Testing : n/a

Date: December 4,
Weather: A.M. – Rainy
P.M. - Rainy
Activities:
 Installation of CHB for interior and exterior walls
 Installation of electrical wires and pipes
 Installation of pipes for drainage and sewer lines
 Plastering of exterior walls
 Construction of Septic tank
 Preparation for concreting of stairs
 Installation of roof purlins and rafters
Materials Consumed:
 Reinforced Steel Bars
 Concrete
 Scaffoldings
 Concrete Hollow Blocks
 Purlins and Rafters
 PVC pipes for sanitary and electrical
Materials Testing : n/a

Date: December 5,
Weather: A.M. – Sunny
P.M. - Rainy
Activities:
 Installation of CHB for interior and exterior walls
 Installation of electrical wires and pipes
 Installation of pipes for drainage and sewer lines
 Plastering of exterior walls
 Construction of Septic tank
 Preparation for concreting of stairs
 Installation of roof purlins and rafters
Materials Consumed:
 Reinforced Steel Bars
 Concrete
 Scaffoldings
 Concrete Hollow Blocks
 Purlins and Rafters
 PVC pipes for sanitary and electrical
Materials Testing : n/a

Date: December 7,
Weather: A.M. – Rainy
P.M. - Rainy
Activities:
 Installation of CHB for interior and exterior walls
 Installation of electrical wires and pipes
 Installation of pipes for drainage and sewer lines
 Plastering of exterior walls
 Construction of Septic tank
 Preparation for concreting of stairs
 Installation of roof purlins and rafters
Materials Consumed:
 Reinforced Steel Bars
 Concrete
 Scaffoldings
 Concrete Hollow Blocks
 Purlins and Rafters
 PVC pipes for sanitary and electrical
Materials Testing : n/a

Date: December 8,
Weather: A.M. – Rainy
P.M. - Rainy
Activities:
 Installation of CHB for interior and exterior walls
 Installation of electrical wires and pipes
 Installation of pipes for drainage and sewer lines
 Plastering of exterior walls
 Construction of Septic tank
 Preparation for concreting of stairs
 Installation of roof purlins and rafters
Materials Consumed:
 Reinforced Steel Bars
 Concrete
 Scaffoldings
 Concrete Hollow Blocks
 Purlins and Rafters
 PVC pipes for sanitary and electrical
Materials Testing: n/a
As part of the technical team of the project and as per inspection at the drainage system of
Gemsville Subdivision, I recommend to unclog and clean the drainage system so that there is
no flooding will occur on our site premises. As I have witnessed last December 8, 2020, on
my site inspection, the rain falls moderately, but the water from the upper part of the
subdivision go to the lower part which our project is located, and all the from the road did not
flow on the drainage canal, instead it overflows to the road. So I recommend to check, survey
and unclog all the debris that blocks our drainage system.

Prepared by:

Engr. John Michael Campitan, CE, SO2


Civil/Structural Engineer/Safety Officer II
PHOTO DOCUMENTATION

Water did not flow properly on our


drainage system, instead it overflows on
the road

Installation of Rafters and Purlins

Construction of Septic Tank and Sanitary


lines for CR