1. General
_______
The aircraft has a power transfer system to transfer hydraulic power between
the Green and Yellow systems. This is necessary if one of the engine pumps
fails. It also makes it possible to pressurize the Green system from the
Yellow system for maintenance (with the Yellow system electric pump).
The power transfer system is always armed when the hydraulic systems are
pressurized. However, the crew can switch it off if necessary.
2. Component
__________________
Location
(Ref. Fig. 001)
-------------------------------------------------------------------------------
FIN | FUNCTIONAL DESIGNATION | PANEL|ZONE|ACCESS | ATA
| | | | DOOR | REF.
-------------------------------------------------------------------------------
1088GM PTU-G/Y 148 734 29-23-41
3701GM SELF SEALING CPLG-PTU DELIVERY, Y 148 734 29-10-00
3. __________________
System Description
EFF :
ALL 29-23-00
Page 1
Aug 01/09
NIA
(b) Install the screw (5) in the protective cover (1).
EFF :
ALL 29-22-53
Page 453
Feb 01/11
NIA
(8) Safety the stowed switch (6) with MISCELLANEOUS (Material No. 19-
010).
Subtask 29-22-53-865-090
Subtask 29-22-53-860-094
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
(4) Examine the connection of the stowed switch (6) and the RAT actuator
(8) and make sure that there is no leak.
(5) Depressurize the Blue hydraulic system (Ref. TASK 29-10-00-864-003).
Subtask 29-22-53-710-065
D. Test
(2) Do the operational test of the manual deployment and the retraction
of the RAT (Ref. TASK 29-22-00-710-007).
(3) Make sure that the RAT stowed light on the RAT ground control panel
3GE operates correctly during the test.
5. Close-up
________
Subtask 29-22-53-410-064
A. Close Access
(1) Put the protective cover (1) in the correct installation position
over the deployment solenoids.
(a) Tighten the screws (2) in the quick release fasteners (3).
EFF :
ALL 29-22-53
Page 452
Aug 01/09
NIA
(6) Install and adjust the stowed switch (6) as given in the subsequent
steps:
(a) Make sure that the RAT actuator (8) is fully extended.
(c) Install the stowed switch (6) in the RAT actuator (8) until no
continuity is shown on the ohmmeter.
(e) Remove the ohmmeter, remove the protective cap from the electical
connector (7) and connect the connector (7) to the stowed switch
(6).
(f) Remove the safety clip(s) and the tag(s) and close this(these)
circuit breaker(s):
2801GE, 2803GE, 6XE.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(i) Remove the electrical connector (7) from the stowed switch (6)
and install the ohmmeter between the pins B and C of the stowed
switch (6).
(j) Turn the stowed switch (6) into the RAT actuator (8) until no
continuity is shown on the ohmmeter.
(k) Turn the stowed switch (6) out of the RAT actuator (8) until
continuity is shown on the ohmmeter. Turn the stowed switch (6)
between 90 degrees and 180 degrees (maximum) more in the same
direction, until the locking tooth of the stowed switch engages
in the hole on the RAT actuator.
(l) Remove the ohmmeter and connect the connector (7) to the stowed
switch (6).
(7) TORQUE the stowed switch (6) to between 0.56 and 0.67 m.daN (49.55
and 59.29 lbf.in)
EFF :
ALL 29-22-53
Page 451
Feb 01/11
NIA
(6) Make sure that the access panel 147BB is open.
R (8) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(11) Make sure that the protective cover of the RAT compartment is
removed.
Subtask 29-22-53-865-089
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-53-420-067
R (3) Remove the blanking cap from the port of the RAT actuator (8).
(4) Remove the protective cap from the electrical connector of the stowed
switch (6).
(5) Make sure that the electrical connectors are clean and in the correct
condition.
EFF :
ALL 29-22-53
Page 450
Feb 01/11
NIA
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-093
(2) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(3) Make sure that the reservoir of the Blue hydraulic system is
depressurized.
(Ref. TASK 29-14-00-614-001).
(4) Make sure that the left main gear door is open (Ref. TASK 32-12-00-
010-001).
EFF :
ALL 29-22-53
Page 449
Aug 01/09
NIA
TASK 29-22-53-400-014
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R No specific 1 OHMMETER
R No specific 2 WARNING NOTICE(S)
No specific Torque Wrench : range 0.00 to 1.20 m.daN
(0.00 to 9.00 lbf.ft)
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 448
Feb 01/11
NIA
R (5) Put a CAP - BLANKING in the open port of the RAT actuator (8).
EFF :
ALL 29-22-53
Page 447
Feb 01/11
NIA
RAT Stowed Switch
Figure 406/TASK 29-22-53-991-016
EFF :
ALL 29-22-53
Page 446
Aug 01/09
NIA
Subtask 29-22-53-010-064
B. Get Access
(2) Open the left main gear door (Ref. TASK 32-12-00-010-001).
(5) Remove the protective cover from the RAT compartment as follows:
(Ref. Fig. 406/TASK 29-22-53-991-016)
(a) Loosen the screws (2) from the quick-release fasteners (3).
(b) Remove the screw (5) from the protective cover (1).
(c) Remove the protective cover (1) from the RAT compartment (4).
Subtask 29-22-53-865-088
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(3) Cut, remove and discard the lockwire from the stowed switch (6).
EFF :
ALL 29-22-53
Page 445
Feb 01/11
NIA
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-092
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(6) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
EFF :
ALL 29-22-53
Page 444
Feb 01/11
NIA
TASK 29-22-53-000-014
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific circuit breaker(s) safety clip(s)
R
No specific safety barriers
R No specific 1 CAP - BLANKING
R No specific 2 CAP - PROTECTION
R No specific 2 WARNING NOTICE(S)
EFF :
ALL 29-22-53
Page 443
Feb 01/11
NIA
Subtask 29-22-53-710-064
5. Close-up
________
Subtask 29-22-53-410-063
A. Close Access
(1) Put the protective cover (1) in the correct installation position
over the deployment solenoids.
(a) Tighten the screws (2) in the quick release fasteners (3).
EFF :
ALL 29-22-53
Page 442
Feb 01/11
NIA
R (4) Remove the blanking cap from the port of the RAT actuator (6).
(5) Install the pressure switch (8) with the new packing (7).
(6) TORQUE the pressure switch (8) to between 6.0 and 6.5 m.daN (44.24
and 47.93 lbf.ft).
(7) Safety the pressure switch (8) with lockwire, corrosion resistant
steel dia. 0.8 mm (0.032 in.).
Subtask 29-22-53-865-087
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
Subtask 29-22-53-860-091
C. Aircraft Maintenance Configuration
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
(4) Examine the connection of the pressure switch (8) and the RAT
actuator (6) and make sure that there is no leak.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
EFF :
ALL 29-22-53
Page 441
Feb 01/11
NIA
(4) Make sure that the left main gear door is open (Ref. TASK 32-12-00-
010-001).
R (8) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(9) Make sure that the safety barriers are in position.
(10) Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
(11) Make sure that the protective cover of the RAT compartment is
removed.
Subtask 29-22-53-865-086
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-53-420-066
EFF :
ALL 29-22-53
Page 440
Feb 01/11
NIA
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-00-00-910-002 Safety Procedures of the Hydraulic System
29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
Power Supply
29-10-00-864-003 Depressurize the Blue Hydraulic System
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
29-22-00-710-007 Operational Test of the Manual Deployment and the
Retraction of the Ram Air Turbine
29-22-00-869-005 Extension of the Ram Air Turbine (RAT) on the Ground
29-22-00-869-006 Retraction of the Ram Air Turbine (RAT) on the Ground
32-12-00-010-001 Open the Main Gear Doors for Access
29-22-53-991-015 Fig. 405
3. __________
Job Set-up
Subtask 29-22-53-860-090
(2) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(3) Make sure that the reservoir of the Blue hydraulic system is
depressurized.
(Ref. TASK 29-14-00-614-001).
EFF :
ALL 29-22-53
Page 439
Aug 01/09
NIA
TASK 29-22-53-400-013
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
No specific lockwire, corrosion resistant steel dia. 0.8 mm
(0.032 in.)
Material No. 02-003 F NSA 307110 TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
EFF :
ALL 29-22-53
Page 438
Feb 01/11
NIA
(5) Remove and discard the packing (7).
R (6) Put a CAP - BLANKING in the open port of the RAT actuator (6).
EFF :
ALL 29-22-53
Page 437
Feb 01/11
NIA
RAT Pressure Switch
Figure 405/TASK 29-22-53-991-015
EFF :
ALL 29-22-53
Page 436
Aug 01/09
NIA
Subtask 29-22-53-010-063
B. Get Access
(2) Open the left main gear door (Ref. TASK 32-12-00-010-001).
(5) Remove the protective cover from the RAT compartment as follows:
(Ref. Fig. 405/TASK 29-22-53-991-015)
(a) Loosen the screws (2) from the quick-release fasteners (3).
(b) Remove the screw (5) from the protective cover (1).
(c) Remove the protective cover (1) from the RAT compartment (4).
Subtask 29-22-53-865-085
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(3) Cut, remove and discard the lockwire from the pressure switch (8).
EFF :
ALL 29-22-53
Page 435
Feb 01/11
NIA
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-089
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(6) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
EFF :
ALL 29-22-53
Page 434
Feb 01/11
NIA
TASK 29-22-53-000-013
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific circuit breaker(s) safety clip(s)
R
No specific safety barriers
R No specific 1 CAP - BLANKING
R No specific 2 CAP - PROTECTION
R No specific 2 WARNING NOTICE(S)
EFF :
ALL 29-22-53
Page 433
Feb 01/11
NIA
5. Close-up
________
Subtask 29-22-53-410-062
A. Close Access
(1) Put the protective cover (1) in the correct installation position
over the deployment solenoids.
(a) Tighten the screws (2) in the quick release fasteners (3).
EFF :
ALL 29-22-53
Page 432
Feb 01/11
NIA
R (8) Remove the protective caps from the electrical connectors.
(9) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 29-22-53-865-084
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
Subtask 29-22-53-860-088
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
(4) Examine the connection of the solenoid valve (8) and the RAT actuator
(6) and make sure that there is no leak.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
Subtask 29-22-53-710-063
EFF :
ALL 29-22-53
Page 431
Feb 01/11
NIA
R (8) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(10) Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
(11) Make sure that the protective cover of the RAT compartment is
removed.
Subtask 29-22-53-865-083
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-53-420-065
(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new packing (7).
R (4) Remove the blanking cap from the port of the RAT actuator (6).
(5) Put the solenoid valve (8) with the new packing (7) in the
installation position.
(6) Install the solenoid valve (8) with the bolts (10) and the washers
(9).
(7) Safety the bolts (10) with MISCELLANEOUS (Material No. 19-010).
EFF :
ALL 29-22-53
Page 430
Feb 01/11
NIA
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-087
(2) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(3) Make sure that the reservoir of the Blue hydraulic system is
depressurized.
(Ref. TASK 29-14-00-614-001).
(4) Make sure that the left main gear door is open (Ref. TASK 32-12-00-
010-001).
EFF :
ALL 29-22-53
Page 429
Aug 01/09
NIA
TASK 29-22-53-400-012
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 428
Feb 01/11
NIA
(5) Remove the solenoid valve (8).
R (7) Put a CAP - BLANKING in the open port of the RAT actuator (6).
EFF :
ALL 29-22-53
Page 427
Feb 01/11
NIA
RAT Solenoid Valve
Figure 404/TASK 29-22-53-991-014
EFF :
ALL 29-22-53
Page 426
Aug 01/09
NIA
Subtask 29-22-53-010-062
B. Get Access
(2) Open the left main gear door (Ref. TASK 32-12-00-010-001).
(5) Remove the protective cover from the RAT compartment as follows:
(Ref. Fig. 404/TASK 29-22-53-991-014)
(a) Loosen the screws (2) from the quick-release fasteners (3).
(b) Remove the screw (5) from the protective cover (1).
(c) Remove the protective cover (1) from the RAT compartment (4).
Subtask 29-22-53-865-082
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(3) Cut, remove and discard the lockwire from the bolts (10).
EFF :
ALL 29-22-53
Page 425
Feb 01/11
NIA
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-086
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(6) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
EFF :
ALL 29-22-53
Page 424
Feb 01/11
NIA
TASK 29-22-53-000-012
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific circuit breaker(s) safety clip(s)
R
No specific safety barriers
R No specific 1 CAP - BLANKING
R No specific 2 CAP - PROTECTION
R No specific 2 WARNING NOTICE(S)
EFF :
ALL 29-22-53
Page 423
Feb 01/11
NIA
(8) Tighten the nut (3) and make sure that the serrations of the locking
device (2) engage correctly.
(9) TORQUE the nut (3) to between 8.13 and 8.81 m.daN (59.95 and 64.97
lbf.ft).
(10) Safety the nut (3) and the locking device (2) with the lockwire,
MISCELLANEOUS (Material No. 19-010).
(11) Put the eye-end (4) in its correct position at the leg assembly (5).
(12) Install the bolt (6), the washers (7), (8) and the nut (9).
(13) TORQUE the nut (9) to between 4.74 and 5.29 m.daN (34.95 and 39.01
lbf.ft).
Subtask 29-22-53-820-052
(1) Make sure that the adjustment of the RAT actuator is correct. If
necessary, do the adjustment procedure of the RAT actuator (Ref. TASK
29-22-00-820-004).
5. Close-up
________
Subtask 29-22-53-860-073
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Remove the ground support and maintenance equipment, the special and
standard tools and all other items.
EFF :
ALL 29-22-53
Page 422
Aug 01/09
NIA
Subtask 29-22-53-865-069
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(Ref. Fig. 403/TASK 29-22-53-991-008)
Subtask 29-22-53-420-059
(3) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Apply the SPECIAL MATERIALS (Material No. 05-002) to the thread of
the eye-end (4).
(5) Assemble the nut (3) and the locking device (2) on the eye-end (4).
(7) Turn the eye-end (4) until the distance Y is the same as you
recorded during the removal procedure.
EFF :
ALL 29-22-53
Page 421
Aug 01/09
NIA
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-072
A. Aircraft Maintenance Configuration
R (2) Make sure that the WARNING NOTICE(S) is in position to tell persons
not to pressurize the Blue hydraulic system.
- In the cockpit on the hydraulic section 40VU of the overhead panel
- On the ground service panel of the Blue hydraulic system.
(3) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(4) Make sure that the reservoir of the Blue hydraulic system is
depressurized.
(Ref. TASK 29-14-00-614-001).
(5) Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
EFF :
ALL 29-22-53
Page 420
Nov 01/10
NIA
TASK 29-22-53-400-007
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 419
Feb 01/11
NIA
(3) Loosen the nut (3).
(4) Remove the nut (9), the washers (7), (8) and the bolt (6) from the
leg assembly (5).
(5) Disconnect the RAT actuator (1) from the leg assembly (5).
(6) Remove the eye-end (4) from the RAT actuator (1).
(7) Disassemble the locking device (2) and the nut (3) from the eye-end
(4).
EFF :
ALL 29-22-53
Page 418
Aug 01/09
NIA
Eye-End of the RAT Actuator
Figure 403/TASK 29-22-53-991-008
EFF :
ALL 29-22-53
Page 417
Aug 01/09
NIA
3. __________
Job Set-up
Subtask 29-22-53-860-071
(3) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(4) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
(5) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
Subtask 29-22-53-865-068
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-53-020-057
A. Removal of the Eye-End of the RAT Actuator
(1) Cut, remove and discard the lockwire from the nut (3) and the locking
device (2).
(2) Measure and record the distance Y between the eye-end (4) and the
locking device (2).
EFF :
ALL 29-22-53
Page 416
Nov 01/10
NIA
TASK 29-22-53-000-007
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 415
Nov 01/10
NIA
Subtask 29-22-53-942-056
EFF :
ALL 29-22-53
Page 414
Feb 01/11
NIA
(5) Examine the hydraulic connections of the RAT actuator and make sure
that there are no leaks.
Subtask 29-22-53-820-053
(1) Do the adjustment procedure of the RAT doors (Ref. TASK 29-22-00-820-
004).
(2) If you can not adjust the doors correctly, do the adjustment
procedure of the RAT actuator (Ref. TASK 29-22-00-820-004).
Subtask 29-22-53-869-052
Subtask 29-22-53-710-060
5. Close-up
________
Subtask 29-22-53-410-059
A. Close Access
(1) Put the protective cover (2) in the correct installation position
over the deployment solenoids
(Ref. Fig. 401/TASK 29-22-53-991-011)
.
(a) Tighten the screws (1) in the quick release fasteners (3).
(3) Close the main gear main door (Ref. TASK 32-12-00-010-001).
EFF :
ALL 29-22-53
Page 413
Feb 01/11
R
NIA
(15) Put the bonding strap (37) in position and install the washer (36)
and the screw (35) (Ref. TASK 20-28-00-912-004).
(16) Remove the protective caps from the electrical connectors and the
receptacles.
(17) Connect the electrical connectors (25), (28), (33), (34) and (38) to
their related receptacles.
R (18) Remove the blanking caps from the hydraulic line end-fittings.
(19) Apply the HYDRAULIC FLUIDS (Material No. 02-003) to the threads of
the line end-fittings.
(21) Attach the union nuts (29) and (30) to their related ports.
(22) TORQUE the union nut (29) to between 5.4 and 5.9 m.daN (39.82 and
43.51 lbf.ft).
(23) TORQUE the union nut (30) to between 2.9 and 3.2 m.daN (21.38 and
23.59 lbf.ft).
(24) TORQUE the nut (46) to between 4.74 and 5.29 m.daN (34.95 and 39.01
lbf.ft).
Subtask 29-22-53-790-052
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
(3) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
EFF :
ALL 29-22-53
Page 412
Feb 01/11
NIA
Subtask 29-22-53-420-062
(1) Put the eye-end (44) of the RAT actuator (27) between the forked
mounting (43) of the leg assembly (40).
(2) Install the bolt (42), the washers (41), the washer (45) and the nut
(46). Do not tighten the nut (46) at this time.
(3) Put the rear gimbal half (5) on the RAT actuator (27).
(4) Carefully raise the RAT actuator (27) to its correct installation
position.
(6) Install the bolts (19) and (20) into the upper section of the
structure (8) and (18).
(7) Put the forward gimbal half (14) on the RAT actuator (27).
(8) Make sure that the bolts (19) and (20) are in the correct position
between the gimbal halves (5) and (14).
(10) Install the nuts (6) and the washers (7), but do not tighten the nuts
(6) at this time.
(11) Install the washers (9) and (15) and the nuts (10) and (16).
(12) Tighten the nut (10) and safety it with a new cotter pin (11).
(13) Tighten the nut (16) and safety it with a new cotter pin (17) .
EFF :
ALL 29-22-53
Page 411
Aug 01/09
NIA
Subtask 29-22-53-865-077
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(Ref. Fig. 401/TASK 29-22-53-991-011, 402/TASK 29-22-53-991-012)
Subtask 29-22-53-210-056
(1) Make sure that the parts retained from the removed component are
clean and in the correct condition.
(4) Make sure that the hydraulic line end-fittings are serviceable.
(5) Make sure that the electrical connectors are clean and in the correct
condition.
(6) Apply SPECIAL MATERIALS (Material No. 05-002) to the shaft of the
bolts (1),(19) and (20).
(7) Apply COMMON GREASE (Material No. 04-011) to the support shafts (31)
of the RAT actuator (27).
EFF :
ALL 29-22-53
Page 410
Aug 01/09
NIA
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-53-860-081
(2) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(3) Make sure that the reservoir of the Blue hydraulic system is
depressurized.
(Ref. TASK 29-14-00-614-001).
(4) Make sure that the left main gear door is open (Ref. TASK 32-12-00-
010-001).
R (8) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(9) Make sure that the container is in position below the hydraulic
connections of the Ram Air Turbine.
(10) Make sure that the safety barriers are in position.
EFF :
ALL 29-22-53
Page 409
Feb 01/11
NIA
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
11 cotter pin 29-22-03 03A-080
17 cotter pin 29-22-03 03A-080
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 408
Aug 01/09
NIA
TASK 29-22-53-400-010
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 407
Feb 01/11
NIA
(11) Remove the nut (46), the washer (45), the washers (41) and the bolt
(42) from the forked mounting (43).
(12) Disengage the eye-end (44) of the RAT actuator (27) from the forked
mounting (43).
(13) Remove and discard the cotter pins (11) and (17).
(14) Remove the nuts (10) and (16) together with the washers (9), (15).
(18) Carefully remove the remaining gimbal half (14) together with the
bolts (13) and the washers (12).
(19) Carefully lower and remove the RAT actuator (27) from the RAT stowage
area.
(20) Remove the bolts (19) and (20) from the structure (8) and (18).
EFF :
ALL 29-22-53
Page 406
Aug 01/09
NIA
RAT Actuator 1GE
Figure 402/TASK 29-22-53-991-012
EFF :
ALL 29-22-53
Page 405
Aug 01/09
NIA
RAT Actuator - Protective Cover
Figure 401/TASK 29-22-53-991-011
EFF :
ALL 29-22-53
Page 404
Aug 01/09
NIA
Subtask 29-22-53-865-076
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-53-020-060
(1) Loosen the screws (1) from the quick-release fasteners (3).
(2) Remove the screw (5) from the protective cover (2).
(3) Remove the protective cover (2) from the RAT compartment (4).
(4) Disconnect the electrical connectors (25), (28), (33), (34), (38)
from their receptacles.
(7) Put a CONTAINER 5 L(1 1/2 USGAL) below the hydraulic connections to
collect unwanted fluid.
(8) Loosen the union nuts (29) and (30) and remove the hydraulic hoses
from the ports.
R (10) Put the CAP - BLANKING on the ports of the RAT actuator.
EFF :
ALL 29-22-53
Page 403
Feb 01/11
NIA
3. __________
Job Set-up
Subtask 29-22-53-941-053
(1) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(2) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
Subtask 29-22-53-010-060
C. Get Access
(2) Open the left main gear main door (Ref. TASK 32-12-00-010-001).
(5) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
EFF :
ALL 29-22-53
Page 402
Feb 01/11
NIA
JACK - EJECTION, RAT (2454GE) - REMOVAL/INSTALLATION
____________________________________________________
TASK 29-22-53-000-010
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
R No specific AR CAP - BLANKING
No specific 1 CAP - PROTECTION
No specific 1 CONTAINER 5 L(1 1/2 USGAL)
R No specific AR PLUG - BLANKING
R No specific 2 WARNING NOTICE(S)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-53
Page 401
Feb 01/11
NIA
5. Close-up
________
Subtask 29-22-51-860-112
Subtask 29-22-51-410-063
B. Close Access
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(4) Close the left main door of the main gear (Ref. TASK 32-12-00-410-
001).
EFF :
ALL 29-22-51
Page 606
Nov 01/10
R
NIA
R (8) Make sure that the clearance H between the turbine blade tip and
the outboard RAT door edge (not door seal) is between 40.0 mm (1.5748
in.) and 48.0 mm (1.8897 in.).
R (9) Make sure that the clearance G between the turbine blade tip and
the inboard RAT door edge (not door seal) is between 31.0 mm (1.2204
in.) and 37.0 mm (1.4566 in.).
Subtask 29-22-51-865-107
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
Subtask 29-22-51-280-051
(2) Make sure that the hydraulic connections of the RAT and its related
components do not leak.
(3) Make sure that the filter indicator of the RAT has not popped out.
(4) Do the draining of the RAT oil drain tank (Ref. TASK 29-22-51-680-
003).
(7) Make sure that the clearance F between the highest point of the RAT
hub (1) and the forward outboard attachment bracket (2) of the RAT
box is not less than 14 mm (0.5511 in.).
EFF :
ALL 29-22-51
Page 605
Nov 01/10
NIA
R Ram Air Turbine - Clearances
Figure 601/TASK 29-22-51-991-028
EFF :
ALL 29-22-51
Page 604
Nov 01/10
NIA
(4) Extend the RAT (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-106
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-51-210-076
R A. Detailed Visual Inspection of the RAT and the Doors in the Deployed
R Position
(1) Make sure that the door links are correctly attached to the leg
assembly and to the RAT doors.
R NOTE : The RAT door link assembly and both ends must be clean and
____
R straight. No bends are acceptable.
R (3) Examine the RAT doors for cracks, corrosion and any other damage.
R (4) Make sure that the RAT and its related components are correctly
attached.
R (5) Make sure that all the lockwire and the cotter pins are in the
correct condition.
R (6) Examine the RAT and its related components for cracks, corrosion and
any other damage.
R (7) Turn the turbine blades manually and make sure that they turn freely.
EFF :
ALL 29-22-51
Page 603
Nov 01/10
NIA
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-51-010-065
A. Get Access
(1) Open the left main door of the main gear (Ref. TASK 32-12-00-010-
001).
(3) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
EFF :
ALL 29-22-51
Page 602
Feb 01/11
NIA
RAM AIR TURBINE (RAT) - INSPECTION/CHECK
________________________________________
TASK 29-22-51-200-003
Detailed Visual Inspection of the Ram Air Turbine-Assembly and the Doors in the
Deployed Position
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE CONTROLS AGREE WITH THE POSITION OF THE ITEMS THEY
_______
OPERATE BEFORE YOU PRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
CAUTION : BE CAREFUL WHEN YOU TOUCH OR MOVE THE RAM AIR TURBINE (RAT). THE RAT
_______
BLADES ARE MADE OF COMPOSITE MATERIAL AND CAN EASILY BECOME DAMAGED.
1. __________________
Reason for the Job
2. ______________________
Job Set-up Information
A. Fixtures, Tools, Test and Support Equipment
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-51
Page 601
Feb 01/11
NIA
Subtask 29-22-51-710-059
D. Test
(1) Do the operational test of the manual deployment and the retraction
of the RAT (Ref. TASK 29-22-00-710-007).
(2) Make sure that the RAT filter indicator stays in the in position.
5. Close-up
________
Subtask 29-22-51-860-110
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 29-22-51
Page 443
Feb 01/11
NIA
(9) Install the filter element (6) with the bypass valve assembly (4) and
the helical compression spring (3) in the RAT hydraulic pump housing
(7).
(10) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new packing (2).
(12) Install the filter cap (1) in the RAT hydraulic pump housing (7).
(13) TORQUE the filter cap (1) to between 2.4 and 3.4 m.daN (17.69 and
25.07 lbf.ft).
Subtask 29-22-51-865-105
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
Subtask 29-22-51-860-109
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
(4) Examine the connection of the filter cap (1) and the RAT hydraulic
pump housing (7) and make sure that there is no leak.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
EFF :
ALL 29-22-51
Page 442
Feb 01/11
R
NIA
R (4) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(6) Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-104
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-51-420-068
A. Installation of the Filter Element
(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new packings (5).
(4) Do a check of the filter element (6) and make sure that it is clean
and not damaged.
(6) Apply some HYDRAULIC FLUIDS (Material No. 02-003) to the bypass valve
assembly (4).
(7) Install the bypass valve assembly (4) in the filter element (6).
R (8) Remove the blanking cap from the RAT hydraulic pump housing (7).
EFF :
ALL 29-22-51
Page 441
Feb 01/11
NIA
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
D. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-00-00-910-002 Safety Procedures of the Hydraulic System
29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground
Power Supply
29-10-00-864-003 Depressurize the Blue Hydraulic System
29-14-00-614-001 Depressurization of the Hydraulic Reservoirs
29-14-00-614-002 Pressurization of the Hydraulic Reservoirs through
the Ground Connector
29-22-00-710-007 Operational Test of the Manual Deployment and the
Retraction of the Ram Air Turbine
29-22-00-869-005 Extension of the Ram Air Turbine (RAT) on the Ground
29-22-00-869-006 Retraction of the Ram Air Turbine (RAT) on the Ground
29-22-51-991-027 Fig. 404
3. __________
Job Set-up
Subtask 29-22-51-860-108
(3) Make sure that the reservoir of the Blue hydraulic system is
depressurized (Ref. TASK 29-14-00-614-001).
EFF :
ALL 29-22-51
Page 440
Feb 01/11
R
NIA
TASK 29-22-51-400-013
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 02-003 F NSA 307110 TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
EFF :
ALL 29-22-51
Page 439
Feb 01/11
NIA
RAT Filter Element
Figure 404/TASK 29-22-51-991-027
EFF :
ALL 29-22-51
Page 438
Feb 01/11
R
NIA
4. Procedure
_________
Subtask 29-22-51-020-064
R (5) Put a CAP - BLANKING in the open port of the RAT hydraulic pump
housing (7).
(6) Remove the bypass valve assembly (4) from the filter element (6).
(7) Remove the packings (5) from the filter element (6).
EFF :
ALL 29-22-51
Page 437
Feb 01/11
NIA
3. __________
Job Set-up
Subtask 29-22-51-860-107
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(6) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-103
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
EFF :
ALL 29-22-51
Page 436
Feb 01/11
NIA
TASK 29-22-51-000-013
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
R No specific 1 CAP - BLANKING
R No specific 2 WARNING NOTICE(S)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-51
Page 435
Feb 01/11
NIA
5. Close-up
________
Subtask 29-22-51-860-106
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
R (2) Remove the safety barriers.
EFF :
ALL 29-22-51
Page 434
Feb 01/11
NIA
Subtask 29-22-51-865-102
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
Subtask 29-22-51-860-105
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
(2) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
(4) Examine the connection of the delta pressure indicator (1) and the
RAT hydraulic pump housing (4) and make sure that there is no leak.
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
D. Test
(1) Do the operational test of the manual deployment and the retraction
of the RAT (Ref. TASK 29-22-00-710-007).
(2) Make sure that the delta pressure indicator (1) stays in the
retracted position.
EFF :
ALL 29-22-51
Page 433
Feb 01/11
R
NIA
R (4) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(6) Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-101
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
Subtask 29-22-51-420-067
A. Installation of the Delta Pressure Indicator
(3) Apply HYDRAULIC FLUIDS (Material No. 02-003) to the new packing (2)
and packing (3).
(4) Install the packings (2), (3) on the delta pressure indicator (1).
R (5) Remove the blanking cap from the RAT hydraulic pump housing (4).
(7) TORQUE the delta pressure indicator (1) to between 0.678 and 1.356
m.daN (59.99 and 119.99 lbf.in).
EFF :
ALL 29-22-51
Page 432
Feb 01/11
NIA
C. Expendable Parts
-------------------------------------------------------------------------------
FIG.ITEM |DESIGNATION |IPC-CSN
-------------------------------------------------------------------------------
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
3. __________
Job Set-up
Subtask 29-22-51-860-104
A. Aircraft Maintenance Configuration
WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.
_______
(2) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
(3) Make sure that the reservoir of the Blue hydraulic system is
depressurized (Ref. TASK 29-14-00-614-001).
EFF :
ALL 29-22-51
Page 431
Feb 01/11
R
NIA
TASK 29-22-51-400-012
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Consumable Materials
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
Material No. 02-003 F NSA 307110 TYPE 4
NO LONGER AVAILABLE (Ref. 20-31-00)
EFF :
ALL 29-22-51
Page 430
Feb 01/11
NIA
RAT Delta Pressure Indicator
Figure 403/TASK 29-22-51-991-026
EFF :
ALL 29-22-51
Page 429
Feb 01/11
R
NIA
4. Procedure
_________
Subtask 29-22-51-020-063
R (2) Put a CAP - BLANKING in the open port of the RAT hydraulic pump
housing (4).
(3) Remove and discard the packings (2), (3) from the delta pressure
indicator (1).
EFF :
ALL 29-22-51
Page 428
Feb 01/11
NIA
3. __________
Job Set-up
Subtask 29-22-51-860-103
(4) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration.
(Ref. TASK 29-00-00-864-001).
(5) Depressurize the reservoir of the Blue hydraulic system (Ref. TASK
29-14-00-614-001).
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(6) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-100
B. Open, safety and tag this(these) circuit breaker(s):
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
EFF :
ALL 29-22-51
Page 427
Feb 01/11
NIA
TASK 29-22-51-000-012
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
R
No specific circuit breaker(s) safety clip(s)
No specific safety barriers
R No specific 1 CAP - BLANKING
R No specific 2 WARNING NOTICE(S)
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-51
Page 426
Feb 01/11
NIA
(4) Make sure that the value of the gap X between the interlock
proximity switch (2) and the flag lever (1) is between 0.018 in.
(0.4571 mm) and 0.020 in. (0.5079 mm).
R (5) If necessary adjust the gap X with applicable shims (4).
(6) TORQUE the nuts (3) to between 0.226 and 0.249 m.daN (19.99 and 22.03
lbf.in).
(8) Make sure that the electrical connectors are clean and in the correct
condition.
Subtask 29-22-51-865-099
B. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
Subtask 29-22-51-710-057
C. Adjustment of the Interlock Proximity Switch and Test
(1) Do the adjustment of the interlock proximity switch (Ref. TASK 29-22-
00-820-005).
(1) Make sure that the work area is clean and clear of tool(s) and other
items.
EFF :
ALL 29-22-51
Page 425
Feb 01/11
NIA
3. __________
Job Set-up
Subtask 29-22-51-860-101
(1) Make sure that the Blue hydraulic system is depressurized and put it
in the maintenance configuration (Ref. TASK 29-00-00-864-001).
R (2) Make sure that the WARNING NOTICE(S) are in position to tell persons
R not to pressurize the Blue hydraulic system:
- in the cockpit on the hydraulic section 40VU of the overhead panel,
- on the ground service panel of the Blue hydraulic system.
(4) Make sure that the RAT is extended (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-098
B. Make sure that this(these) circuit breaker(s) is(are) open, safetied and
tagged
-------------------------------------------------------------------------------
PANEL DESIGNATION IDENT. LOCATION
-------------------------------------------------------------------------------
49VU HYD/RAT/CTL 2801GE D14
106VU CSM/G /EV/MAN/SPLY 6XE B04
121VU HYDRAULIC/RAT/SPLY/EXTN/SOL1 2803GE P33
4. Procedure
_________
(3) Install the interlock proximity switch (2) with the bolts (7), the
washers (6), the shim (4) and the nuts (3). Refer to the marks on the
attachment bracket to find the correct installation position.
EFF :
ALL 29-22-51
Page 424
Feb 01/11
NIA
TASK 29-22-51-400-011
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE TRAVEL RANGES OF THE FLIGHT CONTROL SURFACES ARE
_______
CLEAR BEFORE YOU PRESSURIZE/DEPRESSURIZE A HYDRAULIC SYSTEM.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
29-00-00-864-001 Put the Related Hydraulic System in the Depressurized
Configuration before Maintenance Action
29-22-00-710-007 Operational Test of the Manual Deployment and the
Retraction of the Ram Air Turbine
29-22-00-820-005 Adjustment of the RAT Interlock Proximity Switch
29-22-00-869-005 Extension of the Ram Air Turbine (RAT) on the Ground
29-22-51-991-025 Fig. 402
EFF :
ALL 29-22-51
Page 423
Feb 01/11
NIA
(3) Mark the position of the interlock proximity switch (2) on its
attachment bracket before removal. This will help you to find the
correct installation position.
(4) Remove the nuts (3), the interlock proximity switch (2), the shim
(4), the washers (6) and the bolts (7).
EFF :
ALL 29-22-51
Page 422
Aug 01/09
NIA
RAT Interlock Proximity Switch
Figure 402/TASK 29-22-51-991-025
EFF :
ALL 29-22-51
Page 421
Aug 01/09
NIA
3. __________
Job Set-up
Subtask 29-22-51-860-100
WARNING : MAKE SURE THAT THE RAT TRAVEL RANGE IS CLEAR BEFORE YOU
_______
EXTEND/RETRACT THE RAT.
(4) Extend the Ram Air Turbine (RAT) (Ref. TASK 29-22-00-869-005).
Subtask 29-22-51-865-097
4. Procedure
_________
(Ref. Fig. 402/TASK 29-22-51-991-025)
Subtask 29-22-51-020-062
EFF :
ALL 29-22-51
Page 420
Feb 01/11
NIA
TASK 29-22-51-000-011
WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU
_______
START A TASK ON OR NEAR:
- THE FLIGHT CONTROLS
- THE FLIGHT CONTROL SURFACES
- THE LANDING GEAR AND THE RELATED DOORS
- COMPONENTS THAT MOVE.
WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING
_______
GEAR.
1. __________________
Reason for the Job
Self Explanatory
2. ______________________
Job Set-up Information
-------------------------------------------------------------------------------
REFERENCE QTY DESIGNATION
-------------------------------------------------------------------------------
B. Referenced Information
-------------------------------------------------------------------------------
REFERENCE DESIGNATION
-------------------------------------------------------------------------------
EFF :
ALL 29-22-51
Page 419
Feb 01/11
NIA
Subtask 29-22-51-410-062
B. Close Access
(2) Put the sidewall panel (4) in position on the structure (1) and make
sure that the holes align.
(3) Install the screws (5) together with the washers (6) in the sidewall
panel (4).
(7) Close the left main gear main door (Ref. TASK 32-12-00-410-001).
EFF :
ALL 29-22-51
Page 418
May 01/11
R
NIA
Subtask 29-22-51-790-055
(3) Pressurize the reservoir of the Blue hydraulic system (Ref. TASK 29-
14-00-614-002).
(4) Pressurize the Blue hydraulic system (Ref. TASK 29-10-00-863-003).
(5) Examine the hydraulic connections of the RAT and make sure that there
are no leaks.
Subtask 29-22-51-860-099
(1) Remove the container from below the hydraulic connections and discard
any spilt fluid.
(2) Make sure that the work area is clean and clear of tool(s) and other
items.
Subtask 29-22-51-710-056
G. Do the operational and the functional test of the RAT (Ref. TASK 29-22-
00-720-003).
5. Close-up
________
(Ref. Fig. 401/TASK 29-22-51-991-024)
Subtask 29-22-51-864-069
EFF :
ALL 29-22-51
Page 417
May 01/11
R
NIA
(f) Tighten the nut (13) and safety it with a new cotter pin (12).
(30) Put the cable (40) with the P-clips (43) in position on the structure
of the RAT stowage compartment.
(31) Attach the P-clips (43) in the RAT stowage compartment with the
screws (41), the washers (42) and the spacers (44).
(32) Remove the blanking caps from the electrical connectors (2) and (53).
(33) Remove the blanking caps from the electrical receptacles (3) and
(52).
(34) Make sure that the electrical connectors are clean and in the correct
condition.
(35) Connect the electrical connectors (2) and (53) to the receptacles (3)
and (52).
(36) Connect the electrical connectors (98), (99), (100) and (101) to the
RAT actuator (10).
(37) Install the bonding lead (93) with the washer (94) and the screw (95)
at the RAT actuator (10).
(38) Put the protection cover (4) in the correct position at the RAT
compartment (96).
C. Make sure that the level of the fluid in the reservoir of the Blue
hydraulic system is correct. Add fluid as necessary (Ref. TASK 12-12-29-
611-001) or (Ref. TASK 12-12-29-611-002).
Subtask 29-22-51-865-096
D. Remove the safety clip(s) and the tag(s) and close this(these) circuit
breaker(s):
2801GE, 2803GE, 6XE
EFF :
ALL 29-22-51
Page 416
May 01/11
R
NIA