No.Dokumen 011/LPM.

SWS/VI/2020
PT SEKAR WANGI SENTOSA 5462 M³
Total pekerjaan
LAPORAN PROGRES PEKERJAAN MINGGUAN Durasi Pekerjaan 27 mei - 15 Juli 2020
Perusahaan Pemberi kerja PT PATRIA BADAK ARUN SOLUSI Minggu Ke 2 (DUA)
Nama Pekerjaan RESTORASI GARIS PANTAI UNTUK PEMBANGUNAN KILANG DAN GARIS TERMINAL Periode 03 - 06 Juni 2020
No.Surat Perintah 217/SPS/2.04/VI/2020 Revisi
Lokasi Area Restorasi PT. Pertamina (Persero) NGRR Tuban - Tuban Jawa Timur
PROGRES MINGGUAN
VOL SAT BO
No. URAIAN PEKERJAAN UME UAN BOT MINGGU LALU MINGGU INI KUMULATIF MINGGU INI KET
VOLUME (%) BOBOT VOLUME (%) BOBOT VOLUME (%) BOBOT
1 Supply material 5462 M³ 30% 2548 46.6% 14.0% 210 3.8% 1.2% 2758 50.5% 15.1%
2 Leveling/perataan 5462 M³ 30% 2001 36.6% 11.0% 188 3.4% 1.0% 2189 40.1% 12.0%
3 Compact/pemadatan 5462 M³ 30% 1809 33.1% 9.9% 150 2.7% 0.8% 1959 35.9% 10.8%
4 Test sand cone 10 titik 10% 0 0.0% 0.0% 2 20.0% 2.0% 2 20.0% 2.0%
TOTAL 100% 5.0% 39.9%

Tuban,06 Juni 2020


PT SEKAR WANGI SENTOSA PT PATRA BADAK ARUN SOLUSI

GIYANTO,SE KURNIAWAN P. GINTUNG


PT SEKAR WANGI SENTOSA
LAPORAN PROGRES PEKERJAAN MINGGUAN
Perusahaan Pemberi kerja PT PATRIA BADAK ARUN SOLUSI
Nama Pekerjaan PT
No.Surat Perintah 217/SPS/2.04/VI/2020
Lokasi Area Restorasi PT. Pertamina (Persero) NGRR Tuban - Tuban Jawa Timur
BOB PROGRES MINGGU
volu
No. URAIAN PEKERJAAN me sat OT Mei - Juni 2020
(%)
27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 5462
Supply material M3 30.0% 5.0% 5.0% 5.0% 5.0% 5.0%

2 5462 74.0% 74.0% 74.0% 74.0% 74.0% 74.0% 74


Leveling/perataan M3 30.0% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5%69.0%2.5%
59.0%
3 5462 49.0%
54.0%
Compact/pemadatan M3 30.0% 2.5% 34.9% 34.9% 34.9% 36.2%
34.9% 2.5% 38.7% 39.9%
2.5% 37.4% 2.5% 39.9% 2.5%42.0%2.5% 2.5% 2.5% 2.5%
37.0% 37.0%
32.0%
4 23.3%
27.0%
Test sand cone 10 titik 10.0%
11.6%
2.0%
20.0% 2.0%
15.0% 15.0% 15.0% 15.0%
TOTAL 100.0% 0.0%
10.0%
5.0%
0.0%
RENCANA 0.0% 5.0% 5.0% 5.0% 0.0% 0.0% 0.0% 5.0% 7.0% 5.0% 5.0% 0.0% 5.0% 7.0% 5.0% 5.0% 10.0% 5.0% 0.0% 0.0% 0.0% 0.0% 0.0%

KUMULATIF RENCANA 0.0% 5.0% 10.0% 15.0% 15.0% 15.0% 15.0% 20.0% 27.0% 32.0% 37.0% 37.0% 42.0% 49.0% 54.0% 59.0% 69.0% 74.0% 74.0% 74.0% 74.0% 74.0% 74.0%

ACTUAL 0.0% 11.6% 11.6% 11.6% 11.6% 11.6% 11.6% 1.3% 1.3% 1.3% 1.3% 1.3%

KUMULATIF ACTUAL 0.0% 11.6% 23.3% 34.9% 34.9% 34.9% 34.9% 36.2% 37.4% 38.7% 39.9% 39.9%
DEVIASI

10.40% 10.40% 20.80% 31.20% 31.20% 41.60% 52.00% 62.40%

PT SEKAR WANGI SENTOSA

GIYANTO,SE
No.Dokumen 011/LPM.SWS/VI/2020

Total pekerjaan 5462 M³

Durasi Pekerjaan 27 mei - 15 Juli 2020

Minggu Ke 2 (DUA)

Periode 03 - 06 Juni 2020

Revisi

MINGGUAN
ni 2020 KET
120.0%
19 20 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
100.0%
98.0% 100.0%
93.0% 93.0% 93.0%
5.0%
86.0% 80.0%
74.0% 74.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0%
2.5% 2.5% 2.5% 60.0%

2.5% 2.5% 2.5% 40.0%

20.0%
2.0% 2.0% 2.0%

0.0%
0.0% 2.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.0% 7.0% 0.0% 0.0% 5.0% 2.0%

74.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 86.0% 93.0% 93.0% 93.0% 98.0% 100.0%
Tuban,06 Juni 2020
PT PATRA BADAK ARUN SOLUSI

KURNIAWAN P. GINTUNG
No.Dokumen 011/LPM.SWS/VI/2020
PT SEKAR WANGI SENTOSA 5462 M³
Total pekerjaan
LAPORAN PROGRES PEKERJAAN MINGGUAN Durasi Pekerjaan 27 mei - 15 Juli 2020
Perusahaan Pemberi kerja PT PATRIA BADAK ARUN SOLUSI Minggu Ke 2 (DUA)
Nama Pekerjaan RESTORASI GARIS PANTAI UNTUK PEMBANGUNAN KILANG DAN GARIS TERMINAL Periode 03 - 06 Juni 2020
No.Surat Perintah 217/SPS/2.04/VI/2020 Revisi
Lokasi Area Restorasi PT. Pertamina (Persero) NGRR Tuban - Tuban Jawa Timur
PROGRES MINGGUAN
VOL SAT BO
No. URAIAN PEKERJAAN UME UAN BOT MINGGU LALU MINGGU INI KUMULATIF MINGGU INI KET
VOLUME (%) BOBOT VOLUME (%) BOBOT VOLUME (%) BOBOT
1 Supply material 5462 M³ 30% 2548 46.6% 14.0% 210 3.8% 1.2% 2758 50.5% 15.1%
2 Leveling/perataan 5462 M³ 30% 2001 36.6% 11.0% 188 3.4% 1.0% 2189 40.1% 12.0%
3 Compact/pemadatan 5462 M³ 30% 1809 33.1% 9.9% 150 2.7% 0.8% 1959 35.9% 10.8%
4 Test sand cone 10 titik 10% 0 0.0% 0.0% 2 20.0% 2.0% 2 20.0% 2.0%
TOTAL 100% 5.0% 39.9%

Tuban,06 Juni 2020


PT SEKAR WANGI SENTOSA PT PATRA BADAK ARUN SOLUSI

GIYANTO,SE KURNIAWAN P. GINTUNG


PT SEKAR WANGI SENTOSA
LAPORAN PROGRES PEKERJAAN MINGGUAN
Perusahaan Pemberi kerja PT PATRIA BADAK ARUN SOLUSI
Nama Pekerjaan PT
No.Surat Perintah 217/SPS/2.04/VI/2020
Lokasi Area Restorasi PT. Pertamina (Persero) NGRR Tuban - Tuban Jawa Timur
BOB PROGRES MINGGU
volu
No. URAIAN PEKERJAAN me sat OT Mei - Juni 2020
(%)
27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 5462
Supply material M3 30.0% 5.0% 5.0% 5.0% 5.0% 5.0%

2 5462 74.0% 74.0% 74.0% 74.0% 74.0% 74.0% 74.0


Leveling/perataan M3 30.0% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 69.0%2.5%
2.5% 2.5%
59.0%
3 5462 54.0%
49.0%
Compact/pemadatan M3 30.0% 2.5%34.9% 34.9% 34.9% 36.2%
34.9% 2.5%38.7% 39.9%
2.5%37.4% 2.5% 2.5%
42.0%2.5% 2.5% 2.5% 2.5%
37.0% 37.0%
32.0%
4 23.3%
27.0%
Test sand cone 10 titik 10.0%
11.6% 20.0%2.0% 2.0%
15.0% 15.0% 15.0% 15.0%
TOTAL 100.0% 0.0% 10.0%
5.0%
0.0%
RENCANA 0.0% 5.0% 5.0% 5.0% 0.0% 0.0% 0.0% 5.0% 7.0% 5.0% 5.0% 0.0% 5.0% 7.0% 5.0% 5.0% 10.0% 5.0% 0.0% 0.0% 0.0% 0.0% 0.0%

KUMULATIF RENCANA 0.0% 5.0% 10.0% 15.0% 15.0% 15.0% 15.0% 20.0% 27.0% 32.0% 37.0% 37.0% 42.0% 49.0% 54.0% 59.0% 69.0% 74.0% 74.0% 74.0% 74.0% 74.0% 74.0%

ACTUAL 0.0% 11.6% 11.6% 11.6% 11.6% 11.6% 11.6% 1.3% 1.3% 1.3% 1.3%

KUMULATIF ACTUAL 0.0% 11.6% 23.3% 34.9% 34.9% 34.9% 34.9% 36.2% 37.4% 38.7% 39.9%
DEVIASI

10.40% 10.40% 20.80% 31.20% 31.20% 41.60% 52.00% 62.40%

PT SEKAR WANGI SENTOSA

GIYANTO,SE
No.Dokumen 011/LPM.SWS/VI/2020

Total pekerjaan 5462 M³

Durasi Pekerjaan 27 mei - 15 Juli 2020

Minggu Ke 2 (DUA)

Periode 03 - 06 Juni 2020

Revisi

MINGGUAN
ni 2020 KET
120.0%
19 20 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
100.0%
98.0% 100.0%
5.0% 93.0% 93.0% 93.0%
86.0% 80.0%
74.0% 74.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0%
2.5% 2.5% 2.5% 60.0%

2.5% 2.5% 2.5% 40.0%

20.0%
2.0% 2.0% 2.0%

0.0%
0.0% 2.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.0% 7.0% 0.0% 0.0% 5.0% 2.0%

74.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 86.0% 93.0% 93.0% 93.0% 98.0% 100.0%
Tuban,06 Juni 2020
PT PATRA BADAK ARUN SOLUSI

KURNIAWAN P. GINTUNG
No.Dokumen 010/LPM.SWS/V/2020
PT SEKAR WANGI SENTOSA 5462 M³
Total pekerjaan
LAPORAN PROGRES PEKERJAAN MINGGUAN Durasi Pekerjaan 27 mei - 15 Juli 2020
Perusahaan Pemberi kerja PT PATRIA BADAK ARUN SOLUSI Minggu Ke 1 (Satu)
Nama Pekerjaan RESTORASI GARIS PANTAI UNTUK PEMBANGUNAN KILANG DAN GARIS TERMINAL Periode 27-30 Mei 2020
No.Surat Perintah 217/SPS/2.04/VI/2020 Revisi
Lokasi Area Restorasi PT. Pertamina (Persero) NGRR Tuban - Tuban Jawa Timur
PROGRES MINGGUAN
VOL SAT BO
No. URAIAN PEKERJAAN UME UAN BOT MINGGU LALU MINGGU INI KUMULATIF MINGGU INI KET
VOLUME (%) BOBOT VOLUME (%) BOBOT VOLUME (%) BOBOT
1 Supply material 5462 M³ 30% 2548 46.6% 14.0% 2548 46.6% 14.0%
2 Leveling/perataan 5462 M³ 30% 2001 36.6% 11.0% 2001 36.6% 11.0%
3 Compact/pemadatan 5462 M³ 30% 1809 33.1% 9.9% 1809 33.1% 9.9%
4 Test sand cone 10 titik 10%
TOTAL 100% 34.9% 34.9%

Tuban,30 Mei 2020


PT MITRA TUNGGAL SENTOSA PT PATRA BADAK ARUN SOLUSI

KARMAN KURNIAWAN P. GINTUNG


PT SEKAR WANGI SENTOSA
LAPORAN PROGRES PEKERJAAN MINGGUAN
Perusahaan Pemberi kerja PT PATRIA BADAK ARUN SOLUSI
Nama Pekerjaan PT
No.Surat Perintah 217/SPS/2.04/VI/2020
Lokasi Area Restorasi PT. Pertamina (Persero) NGRR Tuban - Tuban Jawa Timur
BOB PROGRES MINGGU
volu
No. URAIAN PEKERJAAN me sat OT Mei - Juni 2020
(%)
27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18
1 5462
Supply material M3 30% 5% 5% 5% 5% 5%

2 5462 74.0% 74.0% 74.0% 74.0% 74.0% 74.0% 74.0


Leveling/perataan M3 30% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 2.5% 69.0% 2.5%
2.5%
59.0%
3 5462 49.0%
54.0%
Compact/pemadatan M3 30% 2.5%
34.9% 2.5% 2.5% 2.5% 2.5%
42.0% 2.5% 2.5% 2.5% 2.5%
37.0% 37.0%
32.0%
4 23.3%
27.0%
Test sand cone 10 titik 10% 11.6% 20.0%2.0% 2.0%
15.0% 15.0% 15.0% 15.0%
TOTAL 100% 0.0%
10.0%
5.0%
RENCANA 0.0%
0.0% 5.0% 5.0% 5.0% 0.0% 0.0% 0.0% 5.0% 7.0% 5.0% 5.0% 0.0% 5.0% 7.0% 5.0% 5.0% 10.0% 5.0% 0.0% 0.0% 0.0% 0.0% 0.0%

KUMULATIF RENCANA 0.00% 5.0% 10.0% 15.0% 15.0% 15.0% 15.0% 20.0% 27.0% 32.0% 37.0% 37.0% 42.0% 49.0% 54.0% 59.0% 69.0% 74.0% 74.0% 74.0% 74.0% 74.0% 74.0%

ACTUAL 0.00% 11.6% 11.6% 11.6% 11.64% 11.64%

KUMULATIF ACTUAL 0.0% 11.6% 23.3% 34.9% 34.9% 34.9% 34.9%


DEVIASI

10.40% 10.40% 20.80% 31.20% 31.20% 41.60% 52.00% 62.40%

PT MITRA TUNGGAL SENTOSA

KARMAN
No.Dokumen 010/LPM.SWS/V/2020

Total pekerjaan 5462 M³

Durasi Pekerjaan 27 mei - 15 Juli 2020

Minggu Ke 1 (Satu)

Periode 27-30 Mei 2020

Revisi

MINGGUAN
ni 2020 KET
120.00%
19 20 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15
100.00%
98.0% 100.0%
93.0% 93.0% 93.0%
5%
86.0% 80.00%
4.0% 74.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0%
2.5% 2.5% 2.5% 60.00%

2.5% 2.5% 2.5% 40.00%

20.00%
2.0% 2.0% 2.0%

0.00%
0.0% 2.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 0.0% 10.0% 7.0% 0.0% 0.0% 5.0% 2.0%

74.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 76.0% 86.0% 93.0% 93.0% 93.0% 98.0% 100%
Tuban,30 Mei 2020