You are on page 1of 2

Field Data Sheet

Dia of Plunger:(mm)
Project:
Area of Piston(cm2)
Client : Regression Equation
Contractor: Test starting
Location: Design Load Test Completion
Pile ID: Test Load Dial Gauge (M-1)
Dia of Pile: Gross Settlement: Dial Gauge (M-2)
Pile Length : Net Settlement: Dial Gauge (M-3)
Casting Date: Calibrated on Dial Gauge (M-4)
Dial Gauge Reading
% of Actual Observed Elapsed Cumulative
Loading Reading Applied Observed Reading Actual Reading Average
Test Pressure Pressure Time Elapsed Time
Time Time Load M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 Settlement Remarks
Load (Kg/cm2) (Kg/cm2) (Min.) (Min.)
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)
Dial Gauge Reading
% of Actual Observed Elapsed Cumulative
Loading Reading Applied Observed Reading Actual Reading Average
Test Pressure Pressure Time Elapsed Time
Time Time Load M-1 M-2 M-3 M-4 M-1 M-2 M-3 M-4 Settlement Remarks
Load (Kg/cm2) (Kg/cm2) (Min.) (Min.)
(mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm) (mm)

You might also like