COMPANY PROFILE
At Afra Corporation Ltd. we never rest upon our laurels and are passionate and driven to
continue the high levels of customer satisfaction we have achieved over the past years.
We undertake a variety of projects for a wide range of cliental – from small private
developments to large Government projects. Our unique and flexible project management
systems ensure that a positive outcome is achieved regardless of size or nature of the project.
Our keen dedication and analytical outlook made way for where we are today because we
always stand for best quality service. Our services do enjoy a distinct reputation, which is
second to none.
Over the past one year Afra Corporation Ltd. has undergone many changes. We have moved
into new fields and strengthened our management teams, advanced our technology and
marketing capabilities and all this throughout this recession.
We are a dedicated team striving to bring growth to our community and assist our clients in
making their dreams become a reality.
Afra’s solid growth, enterprise, expert management, strategy and expanding market
penetration have proved that we are committed to maintain our reputation in the years ahead.
Contents
VISION 1
MISSION STATEMENT 1
TOP MANAGEMENT 3
SCOPE OF SERVICES 5
PARTICULARS OF WORK (Current Project & Successfully Completed In The Last 4 Years): 8
PHOTOGRAPHS 14
VISION
To meet all the need and requirements of all our clients through excellent service and
products that extends beyond their expectation in quality and efficiency.
To operate on sound business principles and to make profits by being efficient, productive,
competitive and effective.
To make Bangladeshi people benefited through the creation of wealth and job opportunities.
MISSION STATEMENT
To provide top quality and services to all clients.
To always be competitive in pricing.
To have a complete understanding of our clients activities to provide total satisfaction,
machinery, and equipment in excellent working condition.
To be recognized as a company of opportunity for growth and development.
Committed to building long-term relationships based on integrity, performance, value and
client satisfaction.
Name Description
Md. Mohiuddin
Md. Mohiuddin is the Managing Director of the company & has obtained his Hon’s &
Masters from University of Dhaka, Bangladesh. He is responsible for the followings:
Direct the company’s planning activities and provide leadership and overall guidance in both
the administration and operation of the company.
Manage the promotion, development and extension of the business of the Company and
protect the reputation and interests of the Company.
Identify the long range objectives of the Company and recommend their adoption to the
Board.
Oversees the development and implementation of all activities of the Company including
marketing, financial control, personnel and industrial relations, audit and procurement.
He is the Advisor of this company & also and consultant for Electro-mechanical works. He
obtained his B. Sc. Engineering (Electrical) from Chittagong University of Engineering &
Technology, Chittagong, Bangladesh the year 1976.
Shahadat Hossain
B.Sc. in Mechanical Engineering (CUET), M.Sc. in Mechanical Engineering (Polytecnico di
Milano, Italy)
Mr. Shahadat Hossain is working as research & development Engineer in CANNON Afros,
world’s leading supplier of dosing machine, mixing equipment and processing technologies
for polyurethane and composites. Being expert and creative in Polyurethane (PU) processing
technology, composite processing technologies, he acquired sound analytical and leadership
skills in planning and implementation of product design and development.
He is the Consultant of this company and he is responsible for the followings:
Pre-cast Pile
Manufacturing of Pre-cast Pile.
Hydraulic & Diesel Hammer.
Supply, Driving & Extraction of Sheet Pile
Supply of Sheet Pile (SP-II, SP-III, SP-IV)
Driving & Extraction Using Vibratory Hammer (Hydraulic & Electric)
Driving & Extraction Using Excavator Mounted Vibratory Hammer.
Civil Construction Work
Bridges with PC Girders & Deck Girders.
Construction of Jetty.
Fabrication of Steel
Coffer Dam of Under Water Construction Work
Unifloat (Pontoon)
Steel Tank
Steel Frame Jetty.
Expansion Joint of Bridge
Under Water
Construction of RCC Pile Caps under 8m of Water Using Steel Coffer Dam.
Padma Bridge Railway Link Pile Dynamic Analyze, Static Bangladesh CREC Ongoing
Project Load test, Cross hole Sonic Railway
Division-2, Unit-2 analyze & PIT
Padma Bridge Railway Link Pile Dynamic Analyze, Static Bangladesh CREC Ongoing
Project Load test, Cross hole Sonic Railway
Division-2, Unit-3. analyze & PIT
Padma Bridge Railway Link Static Load test, Cross hole Bangladesh CREC Ongoing
Project Sonic analyze & PIT Railway
Division-3, Unit-2.
Dhaka Elevated Expressway Pile Dynamic Analyze & PIT. First Dhaka First Dhaka Ongoing
PPP Project. Elevated Elevated
Expressway Expressway co.,
co., Ltd Ltd
Bashundhara Jetty at Naiyatola, Driving & Extraction of Sheet Bashundhara Bashundhara Ongoing
Buriganga River. Pile Using Vibratory Hammer. ( Group Multi Treding
24m long) Ltd.
Western Bangladesh Bridge Cast-In-Situ Pile Work, Pile RHD Monico Ltd Ongoing
Improvement Project (Package Dynamic Analyze, Static Load
PW-01) test, Cross whole Sonic analyze,
PIT.
SASEC Road Connectivity Pile Dynamic Analyze, Static RHD HEGO-MIR Ongoing
Project-II, WP-06. Load test, Cross hole Sonic AKHTER JV
analyze, PIT.
SASEC Road Connectivity Pile Dynamic Analyze, Static RHD AML Ongoing
Project-II, WP-07. Load test, Cross hole Sonic
analyze, PIT.
SASEC Road Connectivity Cast-In-Situ pile, Pile RHD CPC-TANTIA- Complete
Project-II, WP-08. Dynamic Analyze, Static Load JV d
test, Cross hole Sonic analyze,
PIT.
SASEC Road Connectivity Cast-In-Situ pile using RHD KMC-Monico Ongoing
Project-II, WP-09. Hydraulic Rig, Sub-soil JV.
investigation, Pile Dynamic
Analyze, Static Load test,
Cross hole Sonic analyze, PIT.
SASEC Road Connectivity Sub-soil investigation, Pile RHD China Ongoing
Project-II, WP-10. Dynamic Analyze, Static Load Construction
test, Cross hole Sonic analyze, Seventh
PIT. Engineering
Division Corp.
Ltd.
SASEC Road Connectivity Sub-soil investigation, Pile RHD China Complete
Project-II, WP-12. Dynamic Analyze, Static Load Construction d
test, Cross hole Sonic analyze, Seventh
PIT. Engineering
Division Corp.
Ltd.
Construction of 650 m long P.C 112 Nos Cast-In-Situ Piles LGED Nation Tech Ongoing
Girder Bridge, Kumarkhali, using Hydraulic rig (1,000mm Communication
Kustia dia) with all necessary s Ltd.
supporting equipment, Static
Load Test.
Matarbari Ultra Super Critical Cast-in-situ piling work (Dia, POSCO Mir Akhter Completed
Coal-Fired Power Plant, 600 mm dia, 32 m Long) & PIT. Engineering Hossain Ltd. , 2019
MoheskhaliCox's Bazar. &
Construction
Co. Ltd.
Construction of 44.68m Long PC Construction of 33.68m Long BBA Monico Ltd. Completed
Girder Kashipur PC Girder Kashipur Bridge. Implementati , 2017-18
Bridge. on Authority,
Bangladesh
Army.
Western Bangladesh Bridge Sub-Soil Investigation RHD Dienco Ltd. Completed
Improvement Project (PW-04) , 2018
Ashugong 150 MW HFO Power Supply, installation and Midland CRRC Ziyang Completed
Plant Project commissioning of Deep Tube Group Co. Ltd. ,2018
Well
Ashugong 150 MW HFO Power Topographic Survey, Sub-soil Midland CRRC Ziyang Completed
Plant Project Investigation, Soil Resistivity Group Co. Ltd. ,2018
Test, Test Pile & Load Test.
Dhaka-Khulna (N-8) Highway Static Load Test at Link Road RHD China Harbour Completed
Project. Flyover Project by using sand Engineering Co. ,2018
bag & steel (800 Ton test)- 2 Ltd.
nos.
GPH Ispat Factory Project. Supply, Driving & Extraction of GPH Group Pubali Completed
Sheet Pile Using Suspended Construction ,2017-
Vibro Hammer. Ltd. 2018
Dhaka-Khulna (N-8) Highway Pile Dynamic Analyzer (PDA) RHD China Harbour Completed
Project. Load Test (6 Nos.) Engineering Co. ,2017-
Ltd. 2018
Prime Minister Sheltered Project. Making & Driving of Pre-cast Implementati Juvenile Completed
pile. on Authority International. , 2017
Bangladesh
Army.
Town Bypass Road, Chittagong Cast-in-Situ Piling Work, Dia- Chittagong Spectra Completed
900 mm, Length- 26m. City Engineers Ltd. , 2017
Corporation
Arial Kha Bridge Project Site Camp Construction and site RHD China Harbour Completed
preparation work. Engineering Co. , 2017
Ltd.
Dhaka-Khulna (N-8) Project at Test Pile by using Hydraulic RHD NDE Completed
Bhanga, Faridpur. Rig & Load Test. , 2017
Piling Work at Bashundhara JCX Business Tower, Plot No. JAMPS Group Completed
1136/A, Block-I, Bashundhara , 2017
R/A
Matarbari 2 x 600 MW Ultra Manufacturing 6m long steel PDB KPL Completed
Critical Coal-Fired Power Plant Dredge Pipe 500mm dia, 8mm , 2017
Project. thick plates rolled and welded.
Construction of 13 No. Food Cast-in-situ piling by Rotary City Group Sub Soil Completed
Grain Silo, Rupshi, Narayangonj Drilling Rig. , 2016
Mariners Road at Ch.960.00 mm Construction of 02 17.70m Span Chittagong M/S. Yonus Completed
project, Chittagong. RCC Girder Bridge at Tecpara City Brothers , 2016
and 20.34m Span RCC Girder Corporation.
Bridge at Jalilgonj.
Mariners Road at Ch.960.0m Execution of cast-in-situ piling Chittagong Abdus Salam- Completed
Project, Chittagonj work, load test. City Yakub Brothers , 2016
Corporation (JV)
Construction of Central Mosque Piling, Load test & PIT test Bangladesh Monico Ltd. Completed
at BNS Isa Khan, Chittagong Navy , 2016
Ashugonj-Vulta 400 KV T/I Execution of cast-in-situ piling PGCB Seimcon Completed
Chatok-Sunamgonj 132KV work International , 2015-
Transmission Line. 2016
Green Hannan Tower Rotary Pile AMFL AMFL Completed
, 2016
Eastern Bangladesh Bridge Fabrication and Supply of Monico Ltd. Completed
Improvement Project Anoara- Unifloat& Steel Tank. , 2015
Banshkhali
National Academy for Primary Sub-soil Investigation for the Executive Soil & Pile Completed
Education (NAP) at Mymensing Construction of Proposed 10- Engineer, Engineering , May
storied Dormitory Building at Mymensing Construction 2015
Sadar, NAP.
Eastern Bangladesh Bridge Construction of 102 m Long PC RHD Gannon Completed
Improvement Project Girder Mohonbug Bridge, Dunkerley & Co. , 2014-
Sylhet-Sunamgonj Road 2015
Construction of Faelkhair Drilling & Casting 550 mm dia IDB Mir Akhter Completed
Program: School Cum Cyclone Cast-in-situ pile Hossain Ltd. , 2014-
Shelters, Package No. 09 2015
Eastern Bangladesh Bridge Construction of RCC Pile Caps RHD Monico-CPC Completed
Improvement Project LRP-108a, under 8m of Water using (JV) , 2014-
Halda Brdige Peripheral Sealing of Piles to 2015
Cap.
Eastern Bangladesh Bridge Fabrication & Erection of RHD Monico-CPC Completed
Improvement Project LRP-108A, Coffer Dam. (JV) , 2015
Halda Bridge.
Construction of Faelkhair Drilling & casting 550 mm dia IDB Corolla Completed
Program: School Cum Shelters, cast-in-situ pile. Corporation Ltd , 2014-
Package No. 10 2015
Construction of Faelkhair Driving and testing pre-cast IDB Corolla Completed
Program: School Cum Shelters, pile. Corporation Ltd. , 2014-
Package No. 10 2015
Dhaka Elevated Expressway Making & Driving of Pre-cast Italy Thai First Dhaka Completed
pile. Development Elevated , 2014-
Projec: 33/11 KV GIS S/S under DPDC Hydraulic Rotary Drilling Machine
Client: Dong Fang Electric Co., Ltd
Manufacturer: Profound BV
Origin: Netherland
Project: 700 MT Test on Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport).
Contractor: JTEG, Client: BBA, Consultant: SMEC
Project: 650m PC Girder Bridge project Kumar Project: 650m PC Girder Bridge project Kumar
Khali, Kustia. Khali, Kustia.