Afra Corporation Ltd. is a construction company that has built a strong reputation for
delivering a quality service on time and at a competitive price. We pride ourselves on being
skilled and experienced in all aspects of Sub Soil Investigation, Piling, Sheet pile, Pile Test,
Non-destructive Test (NDT), Civil Construction, Mechanical Fabrication and Erection at land
as well as river (offshore) throughout the country.

Our commitment is to innovation and excellence invariably results in a successfully


completed project for both contractor and client. We understand and promote the idea of
working as a partnership with our clients to ensure their goals are met.

At Afra Corporation Ltd. we never rest upon our laurels and are passionate and driven to
continue the high levels of customer satisfaction we have achieved over the past years.

We undertake a variety of projects for a wide range of cliental – from small private
developments to large Government projects. Our unique and flexible project management
systems ensure that a positive outcome is achieved regardless of size or nature of the project.

Our keen dedication and analytical outlook made way for where we are today because we
always stand for best quality service. Our services do enjoy a distinct reputation, which is
second to none.

Over the past one year Afra Corporation Ltd. has undergone many changes. We have moved
into new fields and strengthened our management teams, advanced our technology and
marketing capabilities and all this throughout this recession.

We are a dedicated team striving to bring growth to our community and assist our clients in
making their dreams become a reality.

Afra’s solid growth, enterprise, expert management, strategy and expanding market
penetration have proved that we are committed to maintain our reputation in the years ahead.
Contents
VISION 1

MISSION STATEMENT 1

THE BUSINESS AND BACKGROUND 1

BRIEF INFORMATION & QUALIFICATION OF COMPANY 2

TOP MANAGEMENT 3

SCOPE OF SERVICES 5

COMPANY STAFF AND EMPLOYEES 6

LIST OF TESTING ENGINEERS ERROR! BOOKMARK NOT DEFINED.

EQUIPMENT AND MACHINERY 7

PARTICULARS OF WORK (Current Project & Successfully Completed In The Last 4 Years): 8

PHOTOGRAPHS 14
VISION
To meet all the need and requirements of all our clients through excellent service and
products that extends beyond their expectation in quality and efficiency.

To operate on sound business principles and to make profits by being efficient, productive,
competitive and effective.

To make Bangladeshi people benefited through the creation of wealth and job opportunities.

MISSION STATEMENT
 To provide top quality and services to all clients.
 To always be competitive in pricing.
 To have a complete understanding of our clients activities to provide total satisfaction,
machinery, and equipment in excellent working condition.
 To be recognized as a company of opportunity for growth and development.
 Committed to building long-term relationships based on integrity, performance, value and
client satisfaction.

THE BUSINESS AND BACKGROUND


The business has been established among engineer to service major contract in Civil Engineering with
the focus on cast-in-situ piling, precast piling, load test, deep tube well and civil as well as mechanical
work.
Due to the lack of development especially in the rural areas, roads as with several other basic
infrastructure and humanitarian needs, the government is committed in investing money in the
development of the rural areas to bring them in line with other developed areas.
Afra Corporation Ltd. has been established by one entrepreneur, has the strong ability in the civil
works and managing and leadership skills in all other type of construction. Afra Corporation Ltd. is
looking forward to creating managerial position for the unemployed citizen to make the strong
management structure.
The structure allows for participation of a wide range of role players with different levels of expertise
and it is envisaged that it will be this dynamic that will be the ultimate success of the company.
We have entered into the field of Infrastructure - Under Water Construction & Offshore Piling Works
a short span ago, Afra Corporation Ltd. lines have become a popular name in public (RHD & LGED)
and private sectors.

Afra Corporation Ltd. Page | 1


BRIEF INFORMATION & QUALIFICATION OF COMPANY

Name Description

Name of the Company AFRA CORPORATION LTD.

Constitutions/ Status Private Limited Company

Incorporation no / Registration no C-117101/14

Trade License 0137384

Registered Capital BDT 20.00 (Twenty) Million.

Paid up Capital BDT 6.00 (six) Million

Value of Construction Plant &


BDT 357.00 (Three Hundred Fifty Seven) Million.
Equipment Owned by the Company.

Tax Identification No 156024510031

VAT Reg. No (BIN) 002010296-0306


Bank Name of Account: AFRA CORPORATION LTD.
Bank: Prime Bank Ltd.
Branch: Bijoynagar
Account no. 15931050016423

Name of Account: AFRA CORPORATION LTD.


Bank: Al-Arafah Islami Bank Limited.
Branch: Joydebpur
Account no. 0361020023986
Business Address AFRA CORPORATION LTD.
Flat-2/A, House-05,
Road-2/3, Block-F, Banani, Dhaka-1213.
Laboratory, Factory, Ware house & Afra Corporation Ltd.
Workshop Vill: Panjora, Post Office: Nagori, Union : Nagori,
Upazila: Kaligonj, District: Gazipur-1463.
+880-2-55040066, +88 01955520820,
Contact No
+88 01955520800
info@afracorporation.com
e-mail
afra.corporation@gmail.com
Web
http://afracorporation.com/

Afra Corporation Ltd. Page | 2


TOP MANAGEMENT
The business is driven by our eight working directors and advisors; collectively they
accumulated more than 42 years of work experience in the construction industry. They are
involved in the business development, procurement, project management and administration
of the company.
The management team proactively gathers feedback, identifies changes in business
environment, reviews work processes and communicates key learning points and company
policy to all staff at regular meetings.

Md. Mohiuddin
Md. Mohiuddin is the Managing Director of the company & has obtained his Hon’s &
Masters from University of Dhaka, Bangladesh. He is responsible for the followings:
Direct the company’s planning activities and provide leadership and overall guidance in both
the administration and operation of the company.
Manage the promotion, development and extension of the business of the Company and
protect the reputation and interests of the Company.
Identify the long range objectives of the Company and recommend their adoption to the
Board.
Oversees the development and implementation of all activities of the Company including
marketing, financial control, personnel and industrial relations, audit and procurement.

Engr. Md. Nuruddin


Md. Nuruddin is the Director of this company & also a Contract Person with the firm,
responsible for the management of the projects such as this business will be undertaking,
assist the PM in the drafting and issuance of project proposals, RFP’s, tenders, budgets, cash
flows and preliminary schedules .Prior to his position with above business he was employed
by the construction Companies in the position- Ass-Project Engineer, Project Engineer and
Site Manager.
He has obtained his Civil Engineering from Chittagong University of Engineering &
Technology, Chittagong, Bangladesh. During his employment he gain experience in the
following disciplines in civil engineering:

 Construction of Different Power Plant.


 Under water construction work.
 Fabrication and erection of Oil Tank.
 Bridge construction.
 Roads Maintenance and Construction.

Afra Corporation Ltd. Page | 3


Engr. Haroon Ferdousi
Haroon Ferdousi is the Senior Advisor of this company & also a Contract Person with the
firm, responsible for the project planning, pricing and consultancy for mechanical works.
He has obtained his BSc. engineering (Mechanical) from BUET, Bangladesh.
In 1991, he completed FMMI training course, AOTS from Osaka, Japan for scientific
Approach to medium scale industries.
From 1977 to 1977 he was Deputy Spud. At Bengal Development Corporation (BDC).He
served as Plant Manager from 1977-81 at 5000 Precast Houses Project, Abudhabi, and UAE
under BDC. Completing this, he went to Iraq as a Project Coordinator for different
construction work under Baghdad Municipalities.
In 1987, he became the Operative Director of Islam Group. During his period, he has
completed 90MW Power Plant at Fenchuganj, Factory building of Bangladesh Capacitors
Ltd. At Savar, Desh Beverage Ltd., Coca-Cola Canning Project (67000sft), Bangladesh
Tobacco Co. Ltd. On turnkey basis. He resigned from Islam Group at 1996.
From 1984 to till date he is the proprietor of Marshal Services, Marshal Distilleries & Asian
Poly Industry.

Engr. Jashim Uddin


Life Fellow IEB, Deputy Director
Director of Purchase
Bangladesh Power Development Board.

He is the Advisor of this company & also and consultant for Electro-mechanical works. He
obtained his B. Sc. Engineering (Electrical) from Chittagong University of Engineering &
Technology, Chittagong, Bangladesh the year 1976.

Shahadat Hossain
B.Sc. in Mechanical Engineering (CUET), M.Sc. in Mechanical Engineering (Polytecnico di
Milano, Italy)

Mr. Shahadat Hossain is working as research & development Engineer in CANNON Afros,
world’s leading supplier of dosing machine, mixing equipment and processing technologies
for polyurethane and composites. Being expert and creative in Polyurethane (PU) processing
technology, composite processing technologies, he acquired sound analytical and leadership
skills in planning and implementation of product design and development.
He is the Consultant of this company and he is responsible for the followings:

 Implements General Plan or other planning projects represents the organization on


regional/local boards
 Reviews all departmental reports and presentations
 Evaluates planning-related legislation and applicability to department projects
 Evaluates proposals to local governments for organization's planning consulting
services
 Communicate ideas for improving company processes with a positive and
constructive attitude, and for developing this attitude in others.

Afra Corporation Ltd. Page | 4


SCOPE OF SERVICES
Sub-soil Investigation
 Exploratory Boring.
 Laboratory Test.
 Earth Resistivity Test.
 Field Test.
Non Destructive Testing (NDT)
 Axial Static Load Test of Pile (Kent ledge & Anchor Frame Method).
 Lateral Load Test of Pile.
 Uplift/Tensile Test of Pile.
 Plate Bearing Load Test
 Pile Dynamic Analyzer (PDA)
 Dynamic Load Test (DLT)
 Pile Integrity Test (PIT)
 Cross Hole Sonic Logging Test (CSL)
 Rebound Hammer Test.
 Core Cutting Test of Concrete
Installation of Bored Pile
 Hydraulic Rotary Rig.
 Percussion Method.
 Mechanical Rotary Rig.
 Reverse Circulation Driving System (RCD)
 Skid Mounted Table Drive Rotary Boring

Pre-cast Pile
 Manufacturing of Pre-cast Pile.
 Hydraulic & Diesel Hammer.
Supply, Driving & Extraction of Sheet Pile
 Supply of Sheet Pile (SP-II, SP-III, SP-IV)
 Driving & Extraction Using Vibratory Hammer (Hydraulic & Electric)
 Driving & Extraction Using Excavator Mounted Vibratory Hammer.
Civil Construction Work
 Bridges with PC Girders & Deck Girders.
 Construction of Jetty.
Fabrication of Steel
 Coffer Dam of Under Water Construction Work
 Unifloat (Pontoon)
 Steel Tank
 Steel Frame Jetty.
 Expansion Joint of Bridge
Under Water
 Construction of RCC Pile Caps under 8m of Water Using Steel Coffer Dam.

Afra Corporation Ltd. Page | 5


Design Work
 Architectural Design & Drawing with Interior.
 Structural Design & Drawing (Steel & RCC, ETP, Industrial Plant).
 Plumbing & Sanitary Design & Drawing.
 Electrical Design & Drawing.
 Mechanical Design & Drawing.
 BMS (Building Management System) Design.
PEB
 Design Drawing Supply & Installation of Pre-Fabricated Steel Structure
 Design Drawing Supply & Installation of Truss Type Steel Structure

COMPANY STAFF AND EMPLOYEES

No Description Person Status


01) Officials Stuff
(a) General Manager (Admin, Finance, Tech) 03 Regular
(c) Deputy General Manager 03 Regular
(d) Transport officer 01 Regular
(e) Safety Engineer 02 Regular
Engineer (B. Sc) 13 Regular
(g) Engineer (Diploma) 26 Regular
(g) Accountant 02 Regular
(h) Manager 05 Regular
(j) Store Keeper 02 Regular
(k) Surveyor 04 Regular
(l) Lab Technician 03 Regular
(m) Supervisor 23 Regular
(n) Engine Mechanics 03 Regular

(o) Electrician 02 Regular


(p) Forman 07 Regular
(q) Operator 16 Regular
(r) Driller 06 Regular
(s) Driver 13 Regular
(t) Fitter 38 Permanent (D/B)
(u) Welder 30 D/B

Afra Corporation Ltd. Page | 6


EQUIPMENT AND MACHINERY
Sl. Equipment/Machinery Description Quantity Rema
No rks
01 Piling Rig
Hydraulic Rotary Rig Soilmec SR-40 03 Set
Hydraulic Rotary Rig Soilmec SR-60 01 Set
Drilling Rig Percussion Method Local Made 10 Nos
Mechanical Rotary Drilling Rig Direct & Reverse Circulation 09 Nos
Pre-cast Drop Hammer, (1-5) ton Local Made 02 Nos
Desander SMD 100, Soilmec 03 Nos
Air Compressor Atlas Copco. XA157, Netherlands. 02 Nos
Centrifugal Pump DELTA 120/2 ET, Soilmec 02 Nos
Mixer BTM 1000 Model-BTM 1000, Soilmec 03 Nos
02 Crawler Crane 50 MT, 65 MT(Sumitomo,IHI) 03 Nos
Rafter Crane 25MT (Tadano, Kato) 02 Nos
03 Excavator,0.3m3 , 0.7m3 Sumitomo, Caterpillar 04 Nos
04 Genset 10 KW to 20 KW China 26 Set
05 Diesel Generator 30-416 KVA, USA, UK, Korea 09 Set
06 Hydraulic Vibratory Hammer with Power ICE 815c 01 Nos
07 Pac
Hydraulic Vibratory Hammer with Power Tomen, SS-40L ,Japan 01 Nos
08 Pac
Electric Vibratory Hammer 60KW & 90KW,Tomen, Japan 02 Nos
09 Pile Test
Pile Dynamic Analyzer (PDA)/DLT Profound, Netherlands & PDI,USA 02 Sets
Pile Integrity Test (PIT) Profound, Netherlands & PDI,USA 03 Sets
Cross Hole Sonic Analyzer (CSL) Profound, Netherlands & PDI,USA 02 Sets
Schmidt Hammer/Concrete Test Hammer China 02 Nos
Pile Load Testing sets up to 1800T Local & China 12 Sets
10 Soil Test Machine
Hydraulic Rotary Drilling Rig. Drilling capacity-150m, China 04 Nos
Drilling Rig (Manual, Hand operated) Local Made 08 Nos
11 Full Furnished Soil Laboratory 01 Unit
12 Full Furnished Concrete Laboratory 01 Unit
13 Portable Concrete Mixture Machine Local & China(7-14 cft) 22 Nos
14 Tower Crane 90 to 120 ft 01 Nos
15 Plate Compactor Manufacturer: China 04 Nos
16 Unifloat ( Pontoon) Manufacturer: Local & India 23 Nos
17 Welding Machine Manufacturer: China 45 Sets
18 Mud Pump With Engine 35 Sets
19 Survey Equipment Sokkia, Kolida 02 Set
20 MS Pipe, I Beam, Steel Props, Scaffolding 210 Ton
Rigging Tool, D Shackles, Hooks Vibrator, 40
21 Cutting Sets, Jacks (2o T to 100 T), Chain 03 Lot
Hoist (2T to 20T)
Lathe Machine, Shaper, Power Tools, Bench
22 Drill, Drill Machine, Hand Tools for 02 Sets
workshop
23 Steel Shutter 2000 Sqm
24 Sheet pile SP-II, SP-III, SP-IV 330 Ton

Afra Corporation Ltd. Page | 7


Current & Successfully Completed Projects:
Name of Project Description of Work Authority Contractor Project
Status
Bangladesh Meghnaghat Pile Dynamic Analyze, Static Reliance Samsung C & T Ongoing
718MW CCPP. Load test, Pullout Test, Bangladesh
Lateral Test & PIT. LNG &
Power Ltd.
Dhaka-Narayanganj Dual Gauge Static Load Test, Rebound Test, Bangladesh Power China Ongoing
Rail way Project. Sheet Pile Rent, driving & Railway International
removal. Group Limited

Padma Bridge Railway Link Pile Dynamic Analyze, Static Bangladesh CREC Ongoing
Project Load test, Cross hole Sonic Railway
Division-2, Unit-2 analyze & PIT
Padma Bridge Railway Link Pile Dynamic Analyze, Static Bangladesh CREC Ongoing
Project Load test, Cross hole Sonic Railway
Division-2, Unit-3. analyze & PIT

Padma Bridge Railway Link Static Load test, Cross hole Bangladesh CREC Ongoing
Project Sonic analyze & PIT Railway
Division-3, Unit-2.

Dhaka Elevated Expressway Pile Dynamic Analyze & PIT. First Dhaka First Dhaka Ongoing
PPP Project. Elevated Elevated
Expressway Expressway co.,
co., Ltd Ltd
Bashundhara Jetty at Naiyatola, Driving & Extraction of Sheet Bashundhara Bashundhara Ongoing
Buriganga River. Pile Using Vibratory Hammer. ( Group Multi Treding
24m long) Ltd.
Western Bangladesh Bridge Cast-In-Situ Pile Work, Pile RHD Monico Ltd Ongoing
Improvement Project (Package Dynamic Analyze, Static Load
PW-01) test, Cross whole Sonic analyze,
PIT.
SASEC Road Connectivity Pile Dynamic Analyze, Static RHD HEGO-MIR Ongoing
Project-II, WP-06. Load test, Cross hole Sonic AKHTER JV
analyze, PIT.
SASEC Road Connectivity Pile Dynamic Analyze, Static RHD AML Ongoing
Project-II, WP-07. Load test, Cross hole Sonic
analyze, PIT.
SASEC Road Connectivity Cast-In-Situ pile, Pile RHD CPC-TANTIA- Complete
Project-II, WP-08. Dynamic Analyze, Static Load JV d
test, Cross hole Sonic analyze,
PIT.
SASEC Road Connectivity Cast-In-Situ pile using RHD KMC-Monico Ongoing
Project-II, WP-09. Hydraulic Rig, Sub-soil JV.
investigation, Pile Dynamic
Analyze, Static Load test,
Cross hole Sonic analyze, PIT.
SASEC Road Connectivity Sub-soil investigation, Pile RHD China Ongoing
Project-II, WP-10. Dynamic Analyze, Static Load Construction
test, Cross hole Sonic analyze, Seventh
PIT. Engineering
Division Corp.
Ltd.
SASEC Road Connectivity Sub-soil investigation, Pile RHD China Complete
Project-II, WP-12. Dynamic Analyze, Static Load Construction d
test, Cross hole Sonic analyze, Seventh
PIT. Engineering
Division Corp.
Ltd.
Construction of 650 m long P.C 112 Nos Cast-In-Situ Piles LGED Nation Tech Ongoing
Girder Bridge, Kumarkhali, using Hydraulic rig (1,000mm Communication
Kustia dia) with all necessary s Ltd.
supporting equipment, Static
Load Test.

Afra Corporation Ltd. Page | 8


Hospital Building Project, Sylhet Static Load test, Cast-In-Situ Bangladesh Monico Ltd. On Going
Cantt. Sylhet. Pilling Work Army
Rangs KM Square, Uttara Dhaka Cast-in-situ piling work Rangs Rangs Properties On Going
(Using Hydraulic Rotary Group Ltd
Drilling Rig)
Construction of 8(Eight) storied Cast-In-Situ Pile Work. Labib Group Labib Dyeing Ongoing
Dyeing Mills Bulding for Labib Mills Ltd.
Dyeing Mills Ltd.
Cross Border Road Network Pile Dynamic Analyze, Sub-soil RHD CPCL Ongoing
Improvement Project. investigation, Static Load test,
Cross hole Sonic analyze, PIT
& Cast-In-Situ Pile Work
Madani Avenue Bridge Project Static Load Test ARK Group On Going
GRP Pipe Line Project, Khilkhet. Driving & Extraction of Sheet Bangladesh Build Stone Completed
Pile Using Hydraulic Vibratory Army Construction Co, , 2020.
Hammer. Ltd.
645.015 m long P.C Girder Static Load test. LGED MM Group. Completed
Sonahat Bridge, Kurigram. 2020
Plot no. 248-251 at Bashundhara Static Load test. CMH Sena Kalyan Completed
R/ A, Dhaka. Constructions & , 2020.
Developments
Construction of Kulaura- Pile Dynamic Analyze (PDA) RHD JON-JV Completed
Prithimpasha-Hazipur- Sharifpur , 2019
(ZED-2822) Road’s 14th km PC
Girder Bridge & 7.5 km
connectivity road
SASEC Road Connectivity Static Load Test RHD Abdul Monem Completed
Project-I Limited , 2019
SASEC Road Connectivity SSI, PLT, PIT, LLT, PDA. RHD MAHL Ongoing
Project-I
2x660 MW Maitree Super Pile Dynamic Analyze on Pre- BHEL Dipon Gulf Completed
Thermal Power Plant, Rampal Cast Pile. , 2020
2x660 MW Maitree Super Pile Dynamic Analyze on Pre- BHEL Keller Completed
Thermal Power Plant, Rampal Cast Pile. , 2019
Khulna - Mongla Port Rail Line Cast-In-Situ Pile Work, Static Bangladesh IRCON Completed
Project. Load test, Lateral Load Test & Railway International , 2019
PIT.
International Beverages Pvt. Ltd. Static Load Test FABS Dipon Gas Co. Completed
(IBPL)-Brown field Project, Management Ltd. , 2019
Bhaluka, Mymensingh Service Pvt.
Ltd.
Construction of Patenga Pile Integrity Test (PIT) 34 Engineer Infratech Completed
Container Terminal (PCT) Construction Construction Co. , 2019
Flyover Project Brigade Ltd
Western Bangladesh Bridge Pile Dynamic Analyze, Static RHD Monico Ltd. Completed
Improvement Project (Package Load test, Cross hole Sonic , 2020
PW-03) analyze, PIT, Cast-In-Situ Pile
Work, Sheet Pile Rent, driving
& removal
Improvement of Jatrabari Pile Integrity Test (PIT) 24 Engineer Spectra Completed
Intersection (Including Equria – Construction Engineers , 2019
Babubazar Link Road) to Brigade Limited.
Pachchar-Bhanga through Mawa
Road of Dhaka-Khulna (N-8)
Highway to 4 Lane Project.
Hathazari to Shikalbaha 230kV Static Load Test PGCB MBL Completed
TL & Hathazari to Rampur 230 , 2019
kV TL
Potuakhali to Payra 230kV TL Static Load Test, Uplift Test PGCB MBL Completed
, 2019
Potuakhali to Payra 230kV TL Static Load Test PGCB Molla Traders Completed
Ltd. , 2019
New 230/130kV AIS Sub Station Static Load Test PGCB GME Completed
at Jhinaidah , 2019
Construction of 55m Long Bridge Static Load Test & PIT LGED Md. Abdul Latif Completed
on Dublagiri National Highway Hakkani , 2019

Afra Corporation Ltd. Page | 9


to Dholbhanga GC via
Amlagachi.
Western Bangladesh Bridge Pile Dynamic Analyze, Static RHD Mir Akhter Completed
Improvement Project (Package Load test, Cross whole Sonic Hossain Ltd. , 2020
PW-02) analyze, PIT.
Greater Dhaka Sustainable Urban Pile Dynamic Analyze, Static RHD MBA Provision Completed
Transport Project. Load test, Cross hole Sonic , 2018.
analyze, PIT,LLT
Western Bangladesh Bridge Pile Dynamic Analyze, SLT, RHD Monico Ltd. Completed
Improvement Project (Package Cross hole Sonic analyze, , 2018
PW-05) PIT,Cast-In-Situ Pile Work
RCC Flyover At Rajshahi Cast-In-Situ Pile Work, City Corp, Dienco Ltd. Completed
Rajshahi , 2019
FIDC Sub-Station Kalurghat Static Load Test & Lateral Load PDB CEC Completed
Chittagong Test , 2018-19
500 m Long PC Girder Bridge at Cast-in-situ pilling (dia 750- Bangladesh Monico Ltd. Completed
Naniarchar, Rangamai. 1200mm), load test, Pipe drive, Army , 2020
sheet pile driving & extraction.

Dhaka-Tangail 4-Lane Highway Construction of 02 No. Coffer RHD Spectra On going


under SASEC Road Connectivity Dam at Kodda Bridge-2, Pier 2 Engineers Ltd.
Project. & 3 by using Sheet Pile, I-
Beam, and Drum Sheet, Cast-in-
situ pilling work.
GPH Ispat Factory Project. Supply, Driving &Extraction of GPH Group Monico Ltd. Completed
Sheet Pile Using Vibro , 2018
Hammer.
DPDC 8 Nos. 33/11 KV GIS Architectural & Structural DPDC CRRC Ziyang Completed
Sub-station project. Design of DPDC 8 Nos. 33/11 Co. Ltd. , 2018
KV GIS Sub-station Project.
Rangs Atrium, Dhanmondi 27 Cast-in-situ piling work (Dia, Rangs Properties Completed
600 mm dia, 22.85 m Long) Ltd , 2019

Matarbari Ultra Super Critical Cast-in-situ piling work (Dia, POSCO Mir Akhter Completed
Coal-Fired Power Plant, 600 mm dia, 32 m Long) & PIT. Engineering Hossain Ltd. , 2019
MoheskhaliCox's Bazar. &
Construction
Co. Ltd.
Construction of 44.68m Long PC Construction of 33.68m Long BBA Monico Ltd. Completed
Girder Kashipur PC Girder Kashipur Bridge. Implementati , 2017-18
Bridge. on Authority,
Bangladesh
Army.
Western Bangladesh Bridge Sub-Soil Investigation RHD Dienco Ltd. Completed
Improvement Project (PW-04) , 2018
Ashugong 150 MW HFO Power Supply, installation and Midland CRRC Ziyang Completed
Plant Project commissioning of Deep Tube Group Co. Ltd. ,2018
Well
Ashugong 150 MW HFO Power Topographic Survey, Sub-soil Midland CRRC Ziyang Completed
Plant Project Investigation, Soil Resistivity Group Co. Ltd. ,2018
Test, Test Pile & Load Test.
Dhaka-Khulna (N-8) Highway Static Load Test at Link Road RHD China Harbour Completed
Project. Flyover Project by using sand Engineering Co. ,2018
bag & steel (800 Ton test)- 2 Ltd.
nos.
GPH Ispat Factory Project. Supply, Driving & Extraction of GPH Group Pubali Completed
Sheet Pile Using Suspended Construction ,2017-
Vibro Hammer. Ltd. 2018

Dhaka-Khulna (N-8) Highway Pile Dynamic Analyzer (PDA) RHD China Harbour Completed
Project. Load Test (6 Nos.) Engineering Co. ,2017-
Ltd. 2018

Afra Corporation Ltd. Page | 10


Dhaka-Khulna (N-8) Highway Static Load Test at Bhanga RHD China Harbour Completed
Project. Interchange Project by using Engineering Co. ,2018
sand bag (520 Ton test). Ltd.
Itna-Mithamain-Austagram Road Cast-in-Situ Piling Work & RHD Monico Ltd. Completed
under Kishorgang Road Division. Load Test. ,2017-
2018

Itna-Mithamain-Austagram Road Sub-soil Investigation. RHD Monico Ltd. Completed


under Kishorgang Road Division. ,2017-
2018
Dhaka-Khulna (N-8) Highway Test Pile, Dia- 1200 mm, by RHD China Harbour Completed
Project. using Hydraulic Rig at Bhanga Engineering Co. , 2017
Interchange. Ltd.
Dhaka-Khulna (N-8) Highway Static Load Test by using sand RHD RBL-MBIL (JV) Completed
Project. bag at Dhaka-Khulna (N-8) , 2017
Highway Project (600 Ton).
Dhaka-Khulna (N-8) Highway Static Load Test by using sand RHD Wahed Completed
Project, Contact Package-04 bag at Dhaka-Khulna (N-8) Construction , 2017
Highway Project (600 Ton), 3 Ltd.
Nos.
Dhaka-Khulna (N-8) Highway Static Load Test at Link Road RHD Intratech Completed
Project. Flyover Project by using sand Construction , 2017
bag & steel (600 Ton). Ltd.

Prime Minister Sheltered Project. Making & Driving of Pre-cast Implementati Juvenile Completed
pile. on Authority International. , 2017
Bangladesh
Army.
Town Bypass Road, Chittagong Cast-in-Situ Piling Work, Dia- Chittagong Spectra Completed
900 mm, Length- 26m. City Engineers Ltd. , 2017
Corporation

Arial Kha Bridge Project Site Camp Construction and site RHD China Harbour Completed
preparation work. Engineering Co. , 2017
Ltd.
Dhaka-Khulna (N-8) Project at Test Pile by using Hydraulic RHD NDE Completed
Bhanga, Faridpur. Rig & Load Test. , 2017

Piling Work at Bashundhara JCX Business Tower, Plot No. JAMPS Group Completed
1136/A, Block-I, Bashundhara , 2017
R/A
Matarbari 2 x 600 MW Ultra Manufacturing 6m long steel PDB KPL Completed
Critical Coal-Fired Power Plant Dredge Pipe 500mm dia, 8mm , 2017
Project. thick plates rolled and welded.

Itna-Mithamain-Austagram Road Sub Soil investigation at RHD Spectra Completed


under Kishorgang Road Division. Chiley,Vatsala,Dhaki,Astogram Engineers Ltd. , 2016-
Bridge (30m to 60m) 2017
Itna-Mithamain-Austagram Road Cast-in-Situ Piling Work, Load RHD Spectra Completed
under Kishorgang Road Division. Test. Engineers Ltd. , 2016-
2017
Construction of Paira Bridge at Fabrication and Erection of RHD Corolla Completed
Lebukhali, Barishal Floating Jetty for Construction Corporation , 2017
of Paira Bridge. Ltd.
AUCTUS, BATB Load Test (16 No.) British NDE Completed
American , 2017
Tobacco
Construction of 44.68m Long PC Sub Soil investigation (30.00m BBA & Monico Ltd. Completed
Girder Kashipur Bridge. to 40.00m). Bangladesh 2017
Army.
Nobideb Project Cast-in-site piling by Rotary LGED AH Completed
Drilling Rig. Construction , 2017
DIV Head Quarter Building Cast-in-Situ Piling Work & Bangladesh Monico Ltd. Completed
Project, Sylhet. Load Test. Army , 2016-
2017

Afra Corporation Ltd. Page | 11


Construction of 6.60 km Kushtia Execution of test pile, service RHD Monico Ltd. Completed
Town Bypass Road pile, load test, PIT test etc. , 2016
Modhumoti Model Town, Savar Sub Soil Investigation Dr. Shahidur Completed
Dhaka Bari , 2016
Bibiyana-II Power Plant Project Cast-in-situ piling work (Dia- BPDB UML Completed
750 mm & 500 mm) , 2016
Bibiyana (South) Power Plant Pilling & Load Test by Anchor BPDB NDE Completed
Project Method , 2016
8 No. 33/11 KV GIS Substations Site preparation work, DPDC CRRC Ziyang Completed
Project Topographic Survey, Sub-soil Co. Ltd. , 2016
Investigation, Soil Resistivity
Test, Test Pile & Load Test.
Construction of Factory Building Cast-in-site piling by Rotary Partex Group Sub-soil Completed
Drilling Rig. , 2016
Sikolbaha 360MW Combined Fabrication and Erection of PDB UML Completed
Cycle Power Plant Floating Jetty at Kornafuli , 2016
River.
Bhola 225 MW Combined Cycle Construction of Permanent Jetty PDB UML Completed
Power Plant Project using Sheet Pile. , 2016

Construction of 13 No. Food Cast-in-situ piling by Rotary City Group Sub Soil Completed
Grain Silo, Rupshi, Narayangonj Drilling Rig. , 2016
Mariners Road at Ch.960.00 mm Construction of 02 17.70m Span Chittagong M/S. Yonus Completed
project, Chittagong. RCC Girder Bridge at Tecpara City Brothers , 2016
and 20.34m Span RCC Girder Corporation.
Bridge at Jalilgonj.
Mariners Road at Ch.960.0m Execution of cast-in-situ piling Chittagong Abdus Salam- Completed
Project, Chittagonj work, load test. City Yakub Brothers , 2016
Corporation (JV)
Construction of Central Mosque Piling, Load test & PIT test Bangladesh Monico Ltd. Completed
at BNS Isa Khan, Chittagong Navy , 2016
Ashugonj-Vulta 400 KV T/I Execution of cast-in-situ piling PGCB Seimcon Completed
Chatok-Sunamgonj 132KV work International , 2015-
Transmission Line. 2016
Green Hannan Tower Rotary Pile AMFL AMFL Completed
, 2016
Eastern Bangladesh Bridge Fabrication and Supply of Monico Ltd. Completed
Improvement Project Anoara- Unifloat& Steel Tank. , 2015
Banshkhali
National Academy for Primary Sub-soil Investigation for the Executive Soil & Pile Completed
Education (NAP) at Mymensing Construction of Proposed 10- Engineer, Engineering , May
storied Dormitory Building at Mymensing Construction 2015
Sadar, NAP.
Eastern Bangladesh Bridge Construction of 102 m Long PC RHD Gannon Completed
Improvement Project Girder Mohonbug Bridge, Dunkerley & Co. , 2014-
Sylhet-Sunamgonj Road 2015
Construction of Faelkhair Drilling & Casting 550 mm dia IDB Mir Akhter Completed
Program: School Cum Cyclone Cast-in-situ pile Hossain Ltd. , 2014-
Shelters, Package No. 09 2015
Eastern Bangladesh Bridge Construction of RCC Pile Caps RHD Monico-CPC Completed
Improvement Project LRP-108a, under 8m of Water using (JV) , 2014-
Halda Brdige Peripheral Sealing of Piles to 2015
Cap.
Eastern Bangladesh Bridge Fabrication & Erection of RHD Monico-CPC Completed
Improvement Project LRP-108A, Coffer Dam. (JV) , 2015
Halda Bridge.
Construction of Faelkhair Drilling & casting 550 mm dia IDB Corolla Completed
Program: School Cum Shelters, cast-in-situ pile. Corporation Ltd , 2014-
Package No. 10 2015
Construction of Faelkhair Driving and testing pre-cast IDB Corolla Completed
Program: School Cum Shelters, pile. Corporation Ltd. , 2014-
Package No. 10 2015
Dhaka Elevated Expressway Making & Driving of Pre-cast Italy Thai First Dhaka Completed
pile. Development Elevated , 2014-

Afra Corporation Ltd. Page | 12


Ltd. Expressway Co. 2015
Ltd.
Eastern Bangladesh Bridge Construction of 102 m Long PC RHD Monico-CPC Completed
Improvement Project LRP-108a, Girder Halda Bridge, LRP- (JV) , 2014-
HaldaBrdige 018a, Chittagonj 2015
Construction of 40m Long Steel Baily Bridge RHD Monico Ltd. Completed
Baily Bridge at Manikchori, , 2014
Khagrachori.
Supply of Unifloat (Steel Corolla Completed
Pontoon) & Steel Tank Corporation Ltd , 2014
Shantahar&Katakhali 50 MW Construction of Rectification of BPDB CSR Ziyang Co. Completed
HFO Power Plant Project Civil Work, Road Repairing & Ltd. , 2014
Deep Tubewell.
Construction of 20-storied Head Piling Work PGCB Desh Unnayan- Completed
Office Building of PGCB The Builders , 2014
including 02 basement at NLDC Engineers (JV)
premises, Dhaka
Construction of 12-storied Piling Work PWD Desh Unnayan Completed
building at Mohammadpur, Ltd. , 2014
Dhaka.
Eastern Bangladesh Bridge Execution of cast-in-situ pile RHD Corolla Completed
Improvement Project Corporation Ltd , 2013-
2014
Eastern Bangladesh Bridge LRP-36,38,44,53,49&70 RHD Corolla Completed
Improvement Project Corporation Ltd , 2014
Dhaka-Chittagong 4-lanning 42 nos. cast-in-situ piling work RHD Gannon Completed
Highway Road Project at offshore using Dunkerley& Co , 2013-
Unifloat/Pontoon (1200/1500 Ltd. 2014
mm dia, 40-52 m Long, 3 Nos.
bridges.
Dhaka-Chittagong 4-lanning Sub-soil Investigation at Lamua RHD Gannon Completed
Highway Road Project Bridge. Dunkerley& Co , 2013
Ltd.
4-lanning of Dhaka-Chittagong Cast-in-situ piling work (Dia, RHD Sinohydro Completed
Highway Project 1000 mm dia, 26m Long) Corporation , 2012-13
LTd.

Afra Corporation Ltd. Page | 13


Photographs
Sub-soil Investigation (Laboratory work)

Direct Share Test Apparatus

Atterberg Limit’s Test Ongoing

Hydrometer Test is on progress Data Observation & Lab Data Processing

Afra Corporation Ltd. Page | 14


Sub-soil Investigation (Site Work)

Equipment: Digital Ground Resistance Tester Model-4630


Method: Wenner Four-Pole Method

Projec: 33/11 KV GIS S/S under DPDC Hydraulic Rotary Drilling Machine
Client: Dong Fang Electric Co., Ltd

SPT is on progress by mechanical percussion


drilling method SASEC Road Connectivity Project-II.

Afra Corporation Ltd. Page | 15


Dynamic Load Test (DLT/ PDA):

Manufacturer: Pile Dynamics, Inc. (PDI)


Origin: USA.

Manufacturer: Profound BV
Origin: Netherland

Afra Corporation Ltd. Page | 16


Project: Bangladesh Meghnaghat 718MW Combined Cycle Power Plant.
Contractor: SAMSUNG C & T, Client: RELIANCE BANGLADESH LNG & POWER LTD

Project: Padma Bridge Rail Link Project.


Contractor: CREC, D-2, U-3.

Afra Corporation Ltd. Page | 17


Project: Dhaka Elevated Expressway.
Contractor: Segregate Engineers, Client: First Dhaka Elevated Expressway Co., Ltd.

Project: Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport).


Contractor: Jiangsu Provincial transportation Engineering Group Co., Ltd. Client: BBA

Afra Corporation Ltd. Page | 18


Cross Hole Sonic Logging Test (CSL):

Cross Hole Analyzer CHAMP-Q


Manufacturer: Pile Dynamics Inc. Origin: USA

Manufacturer: NOVASONIC U5700


Origin: ITALY

Afra Corporation Ltd. Page | 19


Project: SASEC Road Connectivity Project-II.
Contractor: Monico Ltd., Client: Roads & Highways Department.

Project: Cross Border Road Network Improvement Project


Contractor: CPCL, Client: Roads & Highways Department

Afra Corporation Ltd. Page | 20


Project: Padma Bridge Rail Link Project.
Contractor: CREC, D-2, U-3.

Project: SASEC Road Connectivity Project-II.


Contractor: Monico Ltd, Client: Roads & Highways Department.

Afra Corporation Ltd. Page | 21


Pile Integrity Test (PIT):

Pile Integrity Tester PIT-QV


Manufacturer: Pile Dynamics Inc. Origin: USA

Sonic integrity testing equipment


SIT.20100/SIT.201200/SIT.201300

Afra Corporation Ltd. Page | 22


Project: Construction of Patenga Container Terminal (PCT) Flyover Project.
Contractor: Infratech Construction Co. Ltd., Client: 34 ECB.

Project: SASEC Road Connectivity Project-II.


Contractor: Abdul Monem Ltd., Client: Roads & Highways Department.

Afra Corporation Ltd. Page | 23


Static Load Test (SLT):

Project: Padma Bridge Railway Link Project


Contractor: CREC D-2 U-2.

Project: Padma Bridge Rail Link Project (Padma Bridge Project)


Contractor: CREC D-2 U-3.

Afra Corporation Ltd. Page | 24


Project: 800 Ton Test On Link Road Flyover Under Dhaka-Mawa Road Project (N-8)
Contractor: China Harbour Engineering Company Ltd.; Client: Bangladesh Army & RHD

Project: 700 MT Test on Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport).
Contractor: JTEG, Client: BBA, Consultant: SMEC

Afra Corporation Ltd. Page | 25


Project: 1040 Ton Load Test on Western Bangladesh Bridge Improvement Project (Package PW-01),
Contractor: Monico Limited. ; Client: RHD.

Project: Bibiyana-II 225MW CC Power Plant Project


Client: ISOLUX-CORSAN

Afra Corporation Ltd. Page | 26


Project: Bangladesh Meghnaghat 718MW Combined Cycle Power Plant.
Contractor: SAMSUNG C & T, Client: RELIANCE BANGLADESH LNG & POWER LTD

Project: Bangladesh Meghnaghat 718MW Combined Cycle Power Plant.


Contractor: SAMSUNG C & T, Client: RELIANCE BANGLADESH LNG & POWER LTD

Afra Corporation Ltd. Page | 27


Lateral Load Test (LLT):

Project: Bangladesh Meghnaghat 718MW Combined Cycle Power Plant.


Contractor: SAMSUNG C & T, Client: RELIANCE BANGLADESH LNG & POWER LTD

Project: Greater Dhaka Sustainable Urban Transport Project (BRT Gazipur-Airport).


Contractor: JTEG, Client: BBA, Consultant: SMEC

Afra Corporation Ltd. Page | 28


Project: Bibiyana-II 225MW CC Power Plant Project
Client: ISOLUX-CORSAN

Afra Corporation Ltd. Page | 29


Uplift / Pull-out Test :

Project: Bibiyana-II 225MW CC Power Plant Project


Client: ISOLUX-CORSAN

Project: Bangladesh Meghnaghat 718MW Combined Cycle Power Plant.


Contractor: SAMSUNG C & T, Client: RELIANCE BANGLADESH LNG & POWER LTD

Afra Corporation Ltd. Page | 30


Rebound Hammer Test

SCHMIDT (REBOUND) HAMMER ZC3-A

Project: Dhaka Narayanganj Dual Gauge Railway Project.


Contractor: Power China Int. Group Ltd. Client: Bangladesh Railway

Afra Corporation Ltd. Page | 31


Pilling

Project: 650m PC Girder Bridge project Kumar Khali, Kustia.


Contractor: Nation Tech Communications Ltd.

Project: 650m PC Girder Bridge project Kumar Project: 650m PC Girder Bridge project Kumar
Khali, Kustia. Khali, Kustia.
Contractor: Nation Tech Communications Ltd. Contractor: Nation Tech Communications Ltd.

Afra Corporation Ltd. Page | 32


Project: Vanga Interchange Flyover under Dhaka-Khulna 4-Lanning Highway (N-8)
Client: China Harbour Engineering Company Ltd.

Afra Corporation Ltd. Page | 33


Project: Offshore pile at Lemua-Muhuri-Dhumghat Bridge under Dhk-Ctg 4-lanning Highway (N-1)
Contractor: GANNON DUNKERLEY & CO Ltd,

Project: Pile on steel cofferdam


Contractor: Monico Limited; Location: Halda Bridge, Raojan, Chittagong.

Afra Corporation Ltd. Page | 34


Sheet Pile

Project: Bashundhara Jetty


Contractor: Bashundhara Multitrading Co, Ltd.

Project: Dhaka Narayanganj Dual Gauge Railway project


Contractor: Power China International Group Ltd.

Afra Corporation Ltd. Page | 35


Western Bangladesh Bridge Improvement Project
Sheet Pile at Yard
PW-01

Projec: GPH Ispat Factory Construction Project: Western Bangladesh Bridge


Client: Monico Limited Improvement Project PW-01
Client: Monico Limited

Afra Corporation Ltd. Page | 36


Projec: Uttara 3rd Phase Project: First Dhaka Elevated Expressway
Client: ENA-DDJ Construction Firm Client: Italian Thai DevelopmentCompany Ltd.

Project: First Dhaka Elevated Expressway


Client: Italian Thai Development Company Ltd.

Afra Corporation Ltd. Page | 37


Project: 66M Long PC Girder Bridge Over ChaktaiKhal, Chittagong.
Location: Chaktai, Chittagong, : Client: Chittagong City Corporation

Afra Corporation Ltd. Page | 38


Project:Eastern Bangladesh bridge improvement project( EBBIP ), CP-02
Contractor:MonicoLimited.;Client: RHD .Location: Raojan,Chittagong.

Project: 44.02m Long PC Girder Bridge at Kashipur, Narayangong.


Contractor: Monico Limited; Client: Bangladesh Bridge Authority

Afra Corporation Ltd. Page | 39


Fabrication of cofferdam at workshop
Location: Plod# 09, Block-D, Aftabnagar, Rampura, Dhaka.

Fabrication & Erection of Floating Jetty at Kornafuli River (using unifloat).


Project: Sikolbaha 360MW CC Power Plant. ; Client:Union Mercantile Ltd

Afra Corporation Ltd. Page | 40


Fabrication of Steel Pontoon(Unifloat)

Fabrication & Erection 02 Nos Cofferdam ( 8m Below from Water Level)


Project: EBBIP, CP-02; Location: Halda Bridge, Raojan, Chittagong.
Contractor: Monico Limited; Client: RHD.

Afra Corporation Ltd. Page | 41

You might also like