LINE EQUATION :
O A B
0 0.980 10.263
200
Scale X Y
Scale min - - 100
Scale max 520 520
0
Asaoka Plotting 0 100 200 300 400 500 600
First point : 68 St (mm)
Last point : 90
Settlement (mm)
100% consolidation
200
90% consolidation
Settlement (mm)
300
400
500
600
PT. GEOTEKINDO
Ground Improvement Specialist
PT. GEOTEKINDO
Ground Improvement Specialist
300
St+i (mm)
250
LINE EQUATION :
O A B
200
0 0.963 16.405
150
Scale X Y 100
Scale min - -
Scale max 460 460 50
0
Asaoka Plotting 0 100 200 300 400 500
First point : 78 St (mm)
Last point : 90
100% consolidation
150.0
Settlement (mm)
90% consolidation
200.0
250.0
300.0
350.0
400.0
450.0
500.0
PT. GEOTEKINDO
Ground Improvement Specialist
PT. GEOTEKINDO
Ground Improvement Specialist
300
LINE EQUATION :
O A B
0 0.968 16.174
200
Scale X Y
Scale min - - 100
Scale max 530 530
0
Asaoka Plotting 0 100 200 300 400 500 600
First point : 74 St (mm)
Last point : 90
Settlement (mm)
100% consolidation
200
90% consolidation
Settlement (mm)
300
400
500
600
PT. GEOTEKINDO
Ground Improvement Specialist
PT. GEOTEKINDO
Ground Improvement Specialist
300
LINE EQUATION :
O A B
0 0.984 8.810
200
Scale X Y
Scale min - - 100
Scale max 570 570
0
Asaoka Plotting 0 100 200 300 400 500 600
First point : 75 St (mm)
Last point : 90
Settlement (mm)
100% consolidation
200
90% consolidation
Settlement (mm)
300
400
500
600
PT. GEOTEKINDO
Ground Improvement Specialist
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+300
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.084
Top Sub‐grade elevation : + 14.872
Soft soil thickness : 7.136 m
Actual settlement : 0.457 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.084
Platform elevation : + 13.748
Total fill elevation : + 15.329 (backfill for levelling + settlement compensation)
Estimated settlement : 0.457 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
1.081 m (after improvement)
1.581 m (total backfill on top of geomembrane)
Final soil elevation : + 14.872
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.2479 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.872
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.5811
+13.7479
Platform backfill = 1.6644 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.2909
kN/m3 Platform backfill = 1.6644 m; unit weight = 16
+12.0835
Original ground level kN/m3
+11.6265
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+325
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.157
Top Sub‐grade elevation : + 14.766
Soft soil thickness : 6.896 m
Actual settlement : 0.457 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.157
Platform elevation : + 13.660
Total fill elevation : + 15.223 (backfill for levelling + settlement compensation)
Estimated settlement : 0.457 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
1.063 m (after improvement)
1.563 m (total backfill on top of geomembrane)
Final soil elevation : + 14.766
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.1602 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.766
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.5628
+13.6602
Platform backfill = 1.5036 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.2032
kN/m3 Platform backfill = 1.5036 m; unit weight = 16
+12.1566
Original ground level kN/m3
+11.6996
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+350
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.139
Top Sub‐grade elevation : + 14.660
Soft soil thickness : 6.444 m
Actual settlement : 0.457 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.139
Platform elevation : + 13.696
Total fill elevation : + 15.117 (backfill for levelling + settlement compensation)
Estimated settlement : 0.457 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.921 m (after improvement)
1.421 m (total backfill on top of geomembrane)
Final soil elevation : + 14.660
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.1956 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.66
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.4214
+13.6956
Platform backfill = 1.5565 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.2386
kN/m3 Platform backfill = 1.5565 m; unit weight = 16
+12.1391
Original ground level kN/m3
+11.6821
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+375
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 11.967
Top Sub‐grade elevation : + 14.753
Soft soil thickness : 6.437 m
Actual settlement : 0.457 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 11.967
Platform elevation : + 13.829
Total fill elevation : + 15.210 (backfill for levelling + settlement compensation)
Estimated settlement : 0.457 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.881 m (after improvement)
1.381 m (total backfill on top of geomembrane)
Final soil elevation : + 14.753
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.3294 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.753
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.3806
+13.8294
Platform backfill = 1.8627 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.3724
kN/m3 Platform backfill = 1.8627 m; unit weight = 16
+11.9667
Original ground level kN/m3
+11.5097
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+400
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.202
Top Sub‐grade elevation : + 14.447
Soft soil thickness : 6.294 m
Actual settlement : 0.429 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.202
Platform elevation : + 13.708
Total fill elevation : + 14.876 (backfill for levelling + settlement compensation)
Estimated settlement : 0.429 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.668 m (after improvement)
1.168 m (total backfill on top of geomembrane)
Final soil elevation : + 14.447
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.2082 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.447
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.1678
+13.7082
Platform backfill = 1.5062 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.2792
kN/m3 Platform backfill = 1.5062 m; unit weight = 16
+12.202
Original ground level kN/m3
+11.773
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+425
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.115
Top Sub‐grade elevation : + 14.341
Soft soil thickness : 6.111 m
Actual settlement : 0.429 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.115
Platform elevation : + 13.604
Total fill elevation : + 14.770 (backfill for levelling + settlement compensation)
Estimated settlement : 0.429 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.666 m (after improvement)
1.166 m (total backfill on top of geomembrane)
Final soil elevation : + 14.341
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.1038 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.341
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.1662
+13.6038
Platform backfill = 1.4891 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.1748
kN/m3 Platform backfill = 1.4891 m; unit weight = 16
+12.1147
Original ground level kN/m3
+11.6857
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+450
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.167
Top Sub‐grade elevation : + 14.235
Soft soil thickness : 9.516 m
Actual settlement : 0.429 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.167
Platform elevation : + 13.752
Total fill elevation : + 14.664 (backfill for levelling + settlement compensation)
Estimated settlement : 0.429 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.412 m (after improvement)
0.912 m (total backfill on top of geomembrane)
Final soil elevation : + 14.235
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.2516 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.235
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 0.9124
+13.7516
Platform backfill = 1.5843 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.3226
kN/m3 Platform backfill = 1.5843 m; unit weight = 16
+12.1673
Original ground level kN/m3
+11.7383
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+475
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.090
Top Sub‐grade elevation : + 14.128
Soft soil thickness : 5.497 m
Actual settlement : 0.429 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.090
Platform elevation : + 13.793
Total fill elevation : + 14.557 (backfill for levelling + settlement compensation)
Estimated settlement : 0.429 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.264 m (after improvement)
0.764 m (total backfill on top of geomembrane)
Final soil elevation : + 14.128
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.2929 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.128
unit weight = 16 kN/m3 Backfill on top of Geomembrane level =
+13.7929
Platform backfill = 1.703 m; unit weight = 16 0.764100000000001 m; unit weight = 16 kN/m3
+13.3639
kN/m3 Platform backfill = 1.703 m; unit weight = 16
+12.0899
Original ground level kN/m3
+11.6609
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+500
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.147
Top Sub‐grade elevation : + 14.024
Soft soil thickness : 6.618 m
Actual settlement : 0.491 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.147
Platform elevation : + 13.791
Total fill elevation : + 14.515 (backfill for levelling + settlement compensation)
Estimated settlement : 0.491 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.224 m (after improvement)
0.724 m (total backfill on top of geomembrane)
Final soil elevation : + 14.024
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.2909 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.024
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 0.7241
+13.7909
Platform backfill = 1.6438 m; unit weight = 16 m; unit weight = 16 kN/m3
+13.2999
kN/m3 Platform backfill = 1.6438 m; unit weight = 16
+12.1471
Original ground level kN/m3
+11.6561
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+525
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.066
Top Sub‐grade elevation : + 13.937
Soft soil thickness : 7.473 m
Actual settlement : 0.491 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.066
Platform elevation : + 13.490
Total fill elevation : + 14.428 (backfill for levelling + settlement compensation)
Estimated settlement : 0.491 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.438 m (after improvement)
0.938 m (total backfill on top of geomembrane)
Final soil elevation : + 13.937
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.9899 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.937
unit weight = 16 kN/m3 Backfill on top of Geomembrane level =
+13.4899
Platform backfill = 1.4235 m; unit weight = 16 0.938099999999999 m; unit weight = 16 kN/m3
+12.9989
kN/m3 Platform backfill = 1.4235 m; unit weight = 16
+12.0664
Original ground level kN/m3
+11.5754
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+550
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.079
Top Sub‐grade elevation : + 13.874
Soft soil thickness : 6.724 m
Actual settlement : 0.491 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.079
Platform elevation : + 13.456
Total fill elevation : + 14.365 (backfill for levelling + settlement compensation)
Estimated settlement : 0.491 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.409 m (after improvement)
0.909 m (total backfill on top of geomembrane)
Final soil elevation : + 13.874
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.9558 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.874
unit weight = 16 kN/m3 Backfill on top of Geomembrane level =
+13.4558
Platform backfill = 1.3768 m; unit weight = 16 0.909200000000001 m; unit weight = 16 kN/m3
+12.9648
kN/m3 Platform backfill = 1.3768 m; unit weight = 16
+12.079
Original ground level kN/m3
+11.588
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+575
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.273
Top Sub‐grade elevation : + 13.832
Soft soil thickness : 6.307 m
Actual settlement : 0.491 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.273
Platform elevation : + 13.304
Total fill elevation : + 14.323 (backfill for levelling + settlement compensation)
Estimated settlement : 0.491 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.520 m (after improvement)
1.020 m (total backfill on top of geomembrane)
Final soil elevation : + 13.832
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.8035 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.832
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.0195
+13.3035
Platform backfill = 1.0304 m; unit weight = 16 m; unit weight = 16 kN/m3
+12.8125
kN/m3 Platform backfill = 1.0304 m; unit weight = 16
+12.2731
Original ground level kN/m3
+11.7821
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+600
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.016
Top Sub‐grade elevation : + 13.814
Soft soil thickness : 5.466 m
Actual settlement : 0.505 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.016
Platform elevation : + 13.122
Total fill elevation : + 14.319 (backfill for levelling + settlement compensation)
Estimated settlement : 0.505 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.697 m (after improvement)
1.197 m (total backfill on top of geomembrane)
Final soil elevation : + 13.814
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.6217 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.814
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.1973
+13.1217
Platform backfill = 1.1055 m; unit weight = 16 m; unit weight = 16 kN/m3
+12.6167
kN/m3 Platform backfill = 1.1055 m; unit weight = 16
+12.0162
Original ground level kN/m3
+11.5112
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+625
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 12.069
Top Sub‐grade elevation : + 13.818
Soft soil thickness : 6.205 m
Actual settlement : 0.505 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 12.069
Platform elevation : + 13.314
Total fill elevation : + 14.323 (backfill for levelling + settlement compensation)
Estimated settlement : 0.505 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.510 m (after improvement)
1.010 m (total backfill on top of geomembrane)
Final soil elevation : + 13.818
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.8135 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.818
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.0095
+13.3135
Platform backfill = 1.2449 m; unit weight = 16 m; unit weight = 16 kN/m3
+12.8085
kN/m3 Platform backfill = 1.2449 m; unit weight = 16
+12.0686
Original ground level kN/m3
+11.5636
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+650
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 11.962
Top Sub‐grade elevation : + 13.845
Soft soil thickness : 5.477 m
Actual settlement : 0.505 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 11.962
Platform elevation : + 13.513
Total fill elevation : + 14.350 (backfill for levelling + settlement compensation)
Estimated settlement : 0.505 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.337 m (after improvement)
0.837 m (total backfill on top of geomembrane)
Final soil elevation : + 13.845
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+14.013 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.845
unit weight = 16 kN/m3 Backfill on top of Geomembrane level =
+13.513
Platform backfill = 1.5508 m; unit weight = 16 0.837000000000001 m; unit weight = 16 kN/m3
+13.008
kN/m3 Platform backfill = 1.5508 m; unit weight = 16
+11.9622
Original ground level kN/m3
+11.4572
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+675
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 11.711
Top Sub‐grade elevation : + 13.894
Soft soil thickness : 5.847 m
Actual settlement : 0.505 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 11.711
Platform elevation : + 13.353
Total fill elevation : + 14.399 (backfill for levelling + settlement compensation)
Estimated settlement : 0.505 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.546 m (after improvement)
1.046 m (total backfill on top of geomembrane)
Final soil elevation : + 13.894
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.8527 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.894
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.0463
+13.3527
Platform backfill = 1.6419 m; unit weight = 16 m; unit weight = 16 kN/m3
+12.8477
kN/m3 Platform backfill = 1.6419 m; unit weight = 16
+11.7108
Original ground level kN/m3
+11.2058
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+700
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 11.284
Top Sub‐grade elevation : + 13.965
Soft soil thickness : 5.949 m
Actual settlement : 0.505 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 11.284
Platform elevation : + 13.325
Total fill elevation : + 14.470 (backfill for levelling + settlement compensation)
Estimated settlement : 0.505 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.645 m (after improvement)
1.145 m (total backfill on top of geomembrane)
Final soil elevation : + 13.965
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.825 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +13.965
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.145 m;
+13.325
Platform backfill = 2.0412 m; unit weight = 16 unit weight = 16 kN/m3
+12.82
kN/m3 Platform backfill = 2.0412 m; unit weight = 16
+11.2838
Original ground level kN/m3
+10.7788
Original ground level
VACUUM PRELOADING CALCULATION SHEET (Load Ratio)
PT. Geotekindo Rev.3.0
PROJECT NAME : Pematang Panggang ‐ Kayuagung Section II Toll Road Project
LOCATION (STA) : 156+725
OWNER : PT. Hutama Karya
AREA / POINT ID : Zone 10 (156+300 ‐ 156+725)
DATE : 15 Febuary (After VCM)
STEP 1 : Calculate the total backfill.
Initial ground elevation : + 11.949
Top Sub‐grade elevation : + 14.040
Soft soil thickness : 6.106 m
Actual settlement : 0.505 m
STEP 2 : Convert the calculation above to "level" and "backfill thickness" style.
Level style : Initial ground elevation : + 11.949
Platform elevation : + 13.274
Total fill elevation : + 14.545 (backfill for levelling + settlement compensation)
Estimated settlement : 0.505 m
Backfill on top of Geomembrane : 0.500 m (during Improvement)
0.771 m (after improvement)
1.271 m (total backfill on top of geomembrane)
Final soil elevation : + 14.040
Sketch of backfill layer during improvement Sketch if backfill layer and pavement after improvement
Pavement = 0.26 m; unit weight = 22.5 kN/m3
+13.7743 Sub‐base = 0.5 m; unit weight = 19 kN/m3
Backfill on top of Geomembrane level = 0.5 m; +14.04
unit weight = 16 kN/m3 Backfill on top of Geomembrane level = 1.2707
+13.2743
Platform backfill = 1.325 m; unit weight = 16 m; unit weight = 16 kN/m3
+12.7693
kN/m3 Platform backfill = 1.325 m; unit weight = 16
+11.9493
Original ground level kN/m3
+11.4443
Original ground level
VACUUM PRELOADING SYSTEMMONITORING SHEET
PROJECT NAME : Jalan Tol Pematang Panggang Kayu Agung BACKFILL ON TOP OF MEMBRANE (M) VS TIME (DATE)
LOCATION : Kayu Agung, Sumatera Selatan
15/11/2017 05/12/2017 25/12/2017 14/01/2018 03/02/2018 23/02/2018 15/03/2018
PARTITION ID : ZONE 10 : STA 156+300 - STA 156+725 2.0
START VACUUM : 15/11/2017
TOTAL DAYS : 90 DAYS No.1
PREPARE BY : Chenlei (156+362)
1.0 No.2
DATE : 13/02/2018 (156+465)
No.3
(156+562)
INSTRUMENTATION DATA NOTES :
0.0
SETTLEMENT PLATE : 4 POINT
NO. 1 STA 156+362 - 457 mm Max settlement : TOTAL SETTLEMENT (MM) VS TIME (DATE)
NO. 2 STA 156+465 - 429 mm -505 mm 0
50
40
1.0
30
20
10
No.1 (156+362) No.2 (156+465) No.3 (156+562) No.4 (156+662)
2.0
0
3.0
60
40
20
4.0
Depth (m)
-20
5.0
-40
No.1@3m No.1@6m No.2@3m No.2@6m
-60
-50
7.0
-100
8.0 -150
Inclinometer 01
-200
PT. GEOTEKINDO
Ground Improvement Specialist
Surface Settlement in Zone 10 (STA 156+300 to STA 156+725)