What is an ETSO authorization?
ED-124/DO-297
Task 1: Module
acceptance
Task 2: Application
acceptance
…
April 2016 IMA ETSO-2C153 - Avionics Workshop 6
ETSO-2C153 – EASA intent
ED-124/DO-297 Task1 –
Module acceptance
Covering ALL components of a
module
Hardware + Core Software
Tools
Applicability
Module/Platform offering a
SHARING function
Process requirements
Performance requirements
Staying generic… but detailed
enough
April 2016 IMA ETSO-2C153 - Avionics Workshop 7
IMA Sharing functions = Classes
Class PR • Processing
Class IF • Interface
DO-160
ED-14
Functional
Characterization
2.3 PR • Processing
2.6 IF • Interface
4. Environmental
Qualification
Compliance to
Common requirements
Clear boundary
Clear covered/not
covered aspects
Transfer of ‘safety’
aspects for further
safety analysis
User Guide concept
Installation Manual
April 2016 IMA ETSO-2C153 - Avionics Workshop 12
Environmental qualification
Analyse
4-year Consult Public Analysis of
Rule Task RAG/ ToR issue Draft NPA comments Decision
and RIA Consult with CRD
making initiation TAG/ GC Rule (RIA) and final
develop ETSO
Programme SSCC (3 months) review
Draft RIA
Publication is imminent !
CS-ETSO
RMT.0622
RMT.0621
AMC 20-170
Subpart A
Incremental certification
of IMA (from platform &
RMT.0456 modules up to aircraft)
ETSO-2C153 IMA
Platform & Modules