Professional Documents
Culture Documents
TENDER DOCUMENT
Tender No: 9120192020-250 Closing Date/Time: 12/02/2020 13:30
ADRM acting for and on behalf of The President of India invites E-Tenders against Tender No 9120192020-250 Closing Date/Time
12/02/2020 13:30 Hrs. Bidders will be able to submit their original/revised bids upto closing date and time only. Manual offers are not
allowed against this tender, and any such manual offer received shall be ignored.
Contractors are allowed to make payments against this tender towards tender document cost and earnest money only through only
payment modes available on IREPS portal like net banking, debit card, credit card etc. Manual payments through Demand draft, Banker
cheque, Deposit receipts, FDR etc. are not allowed.
1. NIT HEADER
Kanpur-Tundla: Construction of RCC Boundary Wall to prevent CRO and trespassing under
Name of Work
Sr.DEN/IV/ALD and Sr.DEN/III/ALD.
Bidding type Normal Tender
Tender Type Open Bidding System Two Packet System
Tender Closing Date Time 12/02/2020 13:30 Date Time Of Uploading Tender 14/01/2020 17:25
Pre-Bid Required Yes Pre-Bid Query Date Time 24/01/2020 11:00
Advertised Value 471927822.70 Tendering Section SR DEN4
Bidding Style Single Rate for Tender Bidding Unit Above/Below/Par
Earnest Money (Rs.) 2509600.00 Validity of Offer ( Days) 60
Tender Doc. Cost (Rs.) 10000.00 Period of Completion 12 Months
Contract Type Works Contract Category Expenditure
Are Joint Venture (JV) firms
Bidding Start Date 29/01/2020 Yes
allowed to bid
Ranking Order For Bids Lowest to Highest Expenditure Type Capital (Works)
2. SCHEDULE
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Code Unit
Schedule 01-RRH-TDL: Construction of RCC boundary wall (All SOR items under
254178785.78
Sr.DEN/IV/ALD).
Please see Item Breakup for details. 199999044.60 27.09 254178785.78
01
Item Description:- Percentage above/below/at par on the Unified SOR 2010 for all chapters.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Code Unit
Schedule 02-CNB & CNB-RRH: Construction of RCC boundary wall (All SOR items under
130721170.53
DEN/III/ALD).
Please see Item Breakup for details. 102857164.63 27.09 130721170.53
01
Item Description:- Percentage above/below/at par on the Unified SOR 2010 for all chapters.
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Code Unit
Schedule 03-RRH-TDL: Construction of RCC boundary wall (All NS items under
59397697.24
Sr.DEN/IV/ALD).
NS1 13500.00 cum 3425.37 46242495.00 AT Par 46242495.00
Item Description:- Providing, hoisting and fixing in position upto floor two level M30/M35/M40 Grade precast
01 RCC work in panels & column with lifting hook arrangement including cost of centering, shuttering, finishing,
Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve
workability without impairing strength and durability, excluding cost of cement,steel reinforcement and leading of
precast material to site of work as per approved plan etc. & direction of Engineer incharge.
NS2 3000.00 cum 4234.61 12703830.00 AT Par 12703830.00
Item Description:- Providing, hoisting and fixing in position upto floor two level M30/M35/M40 Grade cast in situ
02 RCC work in panels & column with lifting hook arrangement including cost of centering, shuttering, finishing,
Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve
workability without impairing strength and durability, excluding cost of cement,steel reinforcement as per
approved plan etc. & direction of Engineer incharge.
Per Track
NS3 44.00 10258.46 451372.24 AT Par 451372.24
KM
Item Description:- Site survey for construction of boundary wall along the complete railway track by taking levels
03
at every 10 meters or shorter (If required), showing all important features such as existing railway track,existing
structure in the vicinity & preparation of GAD for boundary wall for each track km based on issued RDSO
drawings & as directed by Engineer Incharge along with submission of coloured print on paper with final coloured
print on good quality tracing paper & soft copy of GAD.The rates includes all expenses of man & materials
including toll tax & Govt taxes as applicable & nothing extra shall be paid.( If work has to be done on one side of
track,the payment will be made 60% of this item )
S.No. Item Item Qty Qty Unit Unit Rate Basic Value Escl.(%) Amount Bidding
Code Unit
Schedule 04-CNB & CNB-RRH: Construction of RCC boundary wall (All NS items under
27630169.15
DEN/III/ALD).
NS1 6130.00 cum 3425.37 20997518.10 AT Par 20997518.10
Item Description:- Providing, hoisting and fixing in position upto floor two level M30/M35/M40 Grade precast
01 RCC work in panels & column with lifting hook arrangement including cost of centering, shuttering, finishing,
Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve
workability without impairing strength and durability, excluding cost of cement,steel reinforcement and leading of
precast material to site of work as per approved plan etc. & direction of Engineer incharge.
NS2 1513.00 cum 4234.61 6406964.93 AT Par 6406964.93
Item Description:- Providing, hoisting and fixing in position upto floor two level M30/M35/M40 Grade cast in situ
02 RCC work in panels & column with lifting hook arrangement including cost of centering, shuttering, finishing,
Admixtures in recommended proportion (as per IS:9103) to accelerate, retard setting of concrete, improve
workability without impairing strength and durability, excluding cost of cement,steel reinforcement as per
approved plan etc. & direction of Engineer incharge.
Per Track
NS3 22.00 10258.46 225686.12 AT Par 225686.12
KM
Item Description:- Site survey for construction of boundary wall along the complete railway track by taking levels
at every 10 meters or shorter (If required), showing all important features such as existing railway track,existing
03 structure in the vicinity & preparation of GAD for boundary wall for each track km based on issued RDSO
drawings & as directed by Engineer Incharge along with submission of coloured print on paper with final coloured
print on good quality tracing paper & soft copy of GAD.The rates includes all expenses of man & materials
including toll tax & Govt taxes as applicable & nothing extra shall be paid.( If work has to be done on one side of
track,the payment will be made 60% of this item )
3. ITEM BREAKUP
Schedule Schedule 01-RRH-TDL: Construction of RCC boundary wall (All SOR items under Sr.DEN/IV/ALD).
Item- 01 Percentage above/below/at par on the Unified SOR 2010 for all chapters.
S No. Item Description of Item Unit Qty Rate Amount
No
Earth work in excavation as per approved drawings and
dumping at embankment site or spoil heap, within
railway land, including 50m lead and 1.5m lift, the lead to
be measured from the centre of gravity of excavation to
centre of gravity of spoil heap: the lift to be measured
from natural ground level and paid for in layers of 1.5m
each, including incidental work, as per specifications-in
1 011011 All kinds of soils cum 27000.00 85.54 2309580.00
2 021150 Leading miscellaneous materials such as iron work, MT 35000.00 116.76 4086600.00
rails, fittings & fastenings, pipes, wooden logs, stones
over pitching stone size, RCC/PCC beams / slabs etc
and all similar articles (each individual article or bundle
being not more than 3.5 metres long in the longest
direction) including all loading, unloading and stacking,
lead over 500m and upto 10 km. Note : Lead under this
item is payable when the same exceeds 500m.
3 021151 Additional lead for every subsequent km or part thereof, MT/Km 320060.00 5.33 1705919.80
over 10 km and upto 100 km over item no. 021150.
2 021150 Leading miscellaneous materials such as iron work, MT 18019.78 116.76 2103989.51
rails, fittings & fastenings, pipes, wooden logs, stones
over pitching stone size, RCC/PCC beams / slabs etc
and all similar articles (each individual article or bundle
being not more than 3.5 metres long in the longest
direction) including all loading, unloading and stacking,
lead over 500m and upto 10 km. Note : Lead under this
item is payable when the same exceeds 500m.
3 021151 Additional lead for every subsequent km or part thereof, MT/Km 162310.00 5.33 865112.30
over 10 km and upto 100 km over item no. 021150.
Providing and laying cement concrete, up to plinth in
retaining walls, walls (any thickness) including attached
plasters, columns, pillars, posts, struts, buttresses, string
or lacing courses, parapets, coping, bed blocks, anchor
blocks, plain window sills, fillets etc, excluding the cost of
cement and of shuttering, centering.
4 031022 1:3:6 (1cement : 3 sand : 6 graded stone aggregate cum 960.00 2160.49 2074070.40
40mm nominal size)
Supply and using cement at worksite :
5 033061 OPC 43 grade Tonne 8273.00 5980.00 49472540.00
Providing and laying in position M 20 Grade concrete for
reinforced concrete structural elements but excluding
cost of centering, shuttering, reinforcement and
Admixtures in recommended proportion (as per IS:9103)
to accelerate, retard setting of concrete, improve
workability without impairing strength and durability as
per direction of Engineer in charge
6 041011 All work upto plinth level, including raft foundation of cum 4930.00 2100.13 10353640.90
washable aprons, HS tank, pile cap, footings of FOB,
and Platform shelter etc.
7 041012 All work in buildings above plinth level upto floor two cum 135.00 2309.58 311793.30
level.
Centering and shuttering including strutting, propping
etc. and removal of form for :
8 042011 Foundations, footings, bases of columns, raft foundation Sqm 12060.00 127.80 1541268.00
of washable aprons, Pile caps, Footings of FOB etc.
Supplying Reinforcement for R.C.C. work including
straightening, cutting, bending, placing in position and
binding all complete.
9 045014 High yield strength deformed bars Kg 503720.00 54.35 27377182.00
Structural steel work welded in built up sections, trusses
and framed work, girders, stagings, racks, etc including
cutting, bending, straightening, hoisting, fixing in
position, including applying a priming coat of approved
steel primer, complete - upto 6m height above GL
10 081031 In RSJ, tees, angles and channels Kg 73448.00 69.24 5085539.52
11 081032 In flats, plates , round or square bars Kg 2495.00 68.00 169660.00
12 242190 Providing and fixing concertina coil fencing with required Metre 8730.00 264.99 2313362.70
dia 600 mm having 50 nos. round per 6 m length upto
3m height of wall with existing angle iron 'Y' shaped
placed 2.4 m or 3.00 m apart and with 9 horizontal
R.B.T. stud tied with G.I. staples and G.I. clips to retain
horizontal including necessary bolts or G.I. barbed wire
tied to angle iron all complete as per direction of
Engineer-in-charge with reinforced barbed tape (R.B.T.)
/ Spring core (2.5mm thick) wire of high tensile strength
of 165 kg/ sq.mm. with tape (0.52 mm thick) and weight
43.478gm/ metre (cost of M.S. angle, C.C. blocks shall
be paid separately)
Total 102857164.63
4. ELIGIBILITY CONDITIONS
Submission of Affidavit
5. COMPLIANCE
Commercial-Compliance
Please submit your bank details i.e.Name of the Bank along with Bank Branch Allowed
1 No No
Code, Account Number, IFSC Code, and PAN Number. (Mandatory)
Please furnish list of plant and Machinery available on hand own and proposed Allowed
2 No No
to be inducted own and hired to be given separately for the subject work. (Mandatory)
Please furnish list of Works on hand indicating Description of Work, Contract Allowed
3 No No
Value, Approximate value of balance work yet to be done and Date of award. (Mandatory)
Please furnish list of Works completed in last three financial years giving
Description of Work, Organization for whom executed, approximate value of Allowed
4 No No
contract at time of award, Date of award and Date of Completion. Date of (Mandatory)
actual Start, Actual Completion and Final value of Contract shall also be given.
Please furnish list of personnel, organization available on hand and proposed Allowed
5 No No
to be engaged for the subject work. (Mandatory)
Please enter the percentage of local content in the material being offered.
Please enter 0 for fully imported items, and 100 for fully indigenous items. The Allowed
6 No Yes
definition and calculation of local content shall be in accordance with the Make (Optional)
in India policy as incorporated in the tender conditions.
General Instructions
Undertakings
This tender complies with Public Procurement Policy (Make in India) Order 2017, dated 15/06/2017, issued by
Department of Industrial Promotion and Policy, Ministry of Commerce, circulated vide Railway Board letter no.
2015/RS(G)/779/5 dated 03/08/2017 and 27/12/2017.
Designation : Sr.DEN4