FM System Specifications
Work Order Management and Space Management
Table of Content
TABLE OF CONTENT 1
LEGEND 2
GENERAL REQUIREMENTS 2
ASSET MANAGEMENT 7
RESOURCE MANAGEMENT 8
FINANCIAL MANAGEMENT 9
FM SYSTEM MANAGEMENT 11
WEB ENABLED 11
INFRASTRUCTURE 12
1
Legend
Client mandatory requirement identified by X in the M column.
Supplier fills in the other column as appropriate in their bid response.
General Requirements
2
Item Specification M SF UD OA CR NA Specifications/Comments
11. Ability to automatically notify X
users of approaching
deadlines for PM, contracts,
agreements, etc.
3
12. Ability to assign multiple X
resources to a work order.
13. Ability assign external X
contractors and internal
resources concurrently to
work orders.
14. Ability to track work orders X
within work orders (parent-
child relationship) for project
type work.
15. Ability to view real-time work X
order status via a dashboard.
16. Link assets to work orders. X
17. Ability to add instructions and X
notes to work orders.
18. Ability to create a standard X
work order (question
prompts).
19. Ability to categorize work X
orders for reporting.
20. Ability to add labour and X
parts/materials costs.
21. Link associated X
documentation e.g. service
sheets, and image files.
22. Record all stages of work e.g. X
‘on hold, pending parts, etc.
23. Ability to track changes to X
work orders records.
24. Ability to extend work order X
target dates to accommodate
exceptional circumstances
and record the reason and
approval for each extension.
25. Ability to predefine priority, X
response and rectification
time against each type of
request.
26. Ability to record multiple X
affected areas against one
work order.
27. Ability to record availability X
status of each affected area
recorded in a work order.
28. Ability to auto-generate a X
transaction survey to be
emailed to select individual
clients or groups on an
ongoing basis or a schedule.
4
29. Automated notification of X
status changes, exceeded
timelines, escalation
requests.
30. Ability for requestors to X
escalate their requests if not
satisfied in a timely manner.
31. Ability to group work orders X
for a location
5
10. Ability to attach specific X
procedural documentation or
other document types.
11. Automated hazard warning. X
12. Ability to compare resource X
required against actual
resource available and
automatically generate
warnings.
13. Ability to schedule activities X
against a location rather than
an asset.
14. Ability to automatically notify X
third party contractors of
planned maintenance
activities.
15. Ability to create multiple X
Planned Maintenance
schedules for a single device/
16. Provide X
technicians/contractors with
ability to track Planned
Maintenance compliance and
completion
17. PM status replicates to X
parent/child equipment
associations
18. Ability to group work orders X
for a location
19. Ability to duplicate and edit X
PM schedules for similar/new
assets.
20. Ability to prompt user to X
create a PM schedule when
new equipment is added
21. Ability to flag specific Planned X
Maintenance as to their
purpose (i.e. compliance
related, manufacturers
recommended, etc.) for
reporting purposes.
6
Asset Management
7. Ability to get and track X Describe briefly how this is accomplished and
detailed information on work how this history is accessed within your
history and equipment application.
records (repairs,
replacements, movements,
cost, etc).
8. Ability to track legislative X Describe if this is done through the PM system or
compliance and report on whether your solution has another method to
outstanding items. accomplish this.
9. Ability to analyze a piece of X
equipment for its draw on
resources (i.e. how much
time in a year will a new
piece of equipment require)
10. Ability to flag expiring X
equipment warranties.
11. Ability to track vendor X
support status on a piece of
equipment.
12. Ability to display graphical X
tree depicting asset hierarchy
7
13. Ability to batch retire assets X
14. Mean time between failure X
reporting (MTBF)
Resource Management
8
Financial Management
9
12. Maintain a complete audit X
tracking of any changes
made to the work order data
and provide ability to report
on changes made.
13. Ability to monitor in real- X
time, work order progression
including visual and email
warnings if target response
and rectification are in
danger of not being met or
have not been met, via a
system of escalations.
14. Ability to customize real-time X
dashboard, via drag and
drop, to group together
visual summary of data and
various key performance
indicators in a single place.
15. Ability for group of users to X
be sent reminders and be
kept aware of progress of
selected work orders via
email.
16. Software employs data X
format validation and
prompts.
17. Ability to create search sets X
and saved queries.
18. Ability to drill down in data X
by click on any record
element.
19. High use of drop down lists X
to improve usability and
minimize data entry errors.
20. Name change on data field X
label propagates throughout
entire application
10
FM System Management
Web Enabled
11
7. Ability for clients to enter X
work orders from outside the
organization’s network.
8. Ability for requestors to X
check on the status of their
requests via web.
9. Ability to host an online X
dashboard which can be
made accessible to external
users or embedded on the
corporate site.
Infrastructure
12
9. Access to data can be X
achieved through a dedicated
app vs web enabled
application.
13