OFFSHORE ENGINEERING NOZZLE EVALUATION SHEET
CONTRACT NO: C17058
DOC. NO : xxxxxxxx
PROJECT: FPSO Carioca MV30

CLIENT:

Equipment No. XXX Connected Line No. : XXXX

Nozzle No. XXX Rating 150 Material XXXXX

NOZZLE CENTERLINE Y VESSEL CENTERLINE Z

Stress System No. 221 Node No.: 120 Size 36

Piping Loads on the Equipment Nozzle ( Forces in N and Moments in N-m)

FX FY FZ MX MY MZ

MAXIMUM CALCULATED LOAD 3300 2500 3300 400 500 600

ALLOWABLE LOAD AS PER TABLE-1 37800 50400 50400 117900 136100 90700

ALLOWABLE LOAD AS PER ADDENDUM TO TABLE-1

1. Allowable Nozzle Load as per Doc. No. : 0003-MI20-00S1-0100, 0478-MI20-00S1-0100


REFERENCE DOC. No.

B XX.XX.XX XXX JAS APF


REV DATE PREARED BY CHECKED BY APPROVED BY
PAGE NO.:
NOZZLE EVALUATION SHEET
CONTRACT NO: C17058

DOC. NO : xxxxxxxx
PROJECT: FPSO Carioca MV30

CLIENT:

Equipment No. xxx Connected Line No. : xxxx

Nozzle No. xxx Rating 150 Material xxxxx

NOZZLE CENTERLINE Y VESSEL CENTERLINE Y

Stress System No. 232 Node No.: 123 Size 36

Piping Loads on the Equipment Nozzle ( Forces in N and Moments in N-m)

FY FR=√(FX2+FZ2) MY FR=√(MX2+MZ2)

MAXIMUM CALCULATED LOAD 3100 4140 450 640

ALLOWABLE LOAD 50400 63000 136100 148751

ALLOWABLE LOAD AS PER ADDENDUM TO TABLE-1

1. Allowable Nozzle Load as per Doc. No. : 0003-MI20-00S1-0100, 0478-MI20-00S1-0100


REFERENCE DOC. No.

B XX.XX.XX XXX JAS APF

REV DATE PREARED BY CHECKED BY APPROVED BY