Name of Work

Construction of Grade at Kochadai Junction at km 5/10 of NH 49 Extn (New NH No.85)

(I) FLY OVER

Details of Concrete Quantity in Flyover Structure - Girder (20.0m Span - Curve)


Traingle
Sl No Description Description Parts Units Nos Length Width Depth Quantity
Portion
RCC Girder Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and

cement at site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting,

finishing and curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard

specifications (Super Structuer in RCC Girder) complete as per relevant MORT&H specifications 1000&2100.

Outer Girder 1
1 Girder Bottom Flange Cum 1 1 15.686 0.625 0.250 2.451
2 Girder Bottom Haunch Cum 2 0.5 14.686 0.150 0.150 0.330
3 Girder vertical End Haunch Cum 4 0.5 1.000 0.150 1.170 0.351
4 Girder Top Haunch Cum 2 0.5 15.686 0.300 0.150 0.706
5 Girder Web Cum 1 1 15.686 0.325 1.320 6.729
6 Girder End Rect Portion Cum 2 1 2.000 0.625 1.570 3.925
7 Girder Top Haunch Side end portion Cum 4 1 1.070 0.150 0.075 0.048

Nos of Girdrs 1 14.540 14.540


1 Cross Girder End Cross Girder Cum 1 1 12.763 0.6 1.904 14.584
2 Cross Girder Deduction Slope Cum -2 0.5 1 0.6 1.559 -0.936
3 Cross Girder Deduction Girder End Portion Cum -4 1 0.625 0.6 1.570 -2.355

Nos of End Cross Girdrs 2 11.293 22.586


1 Cross Girder Mid Cross Girder Cum 3 1 2.675 0.300 1.170 2.817

Nos of Mid Cross Girdrs 1 2.817 2.817

Inner Girder 1
1 Girder Bottom Flange Cum 1 1 15.899 0.625 0.250 2.484
2 Girder Bottom Haunch Cum 2 0.5 14.899 0.150 0.150 0.335
3 Girder vertical End Haunch Cum 4 0.5 1.000 0.150 1.170 0.351
4 Girder Top Haunch Cum 2 0.5 15.899 0.300 0.150 0.715
5 Girder Web Cum 1 1 15.899 0.325 1.320 6.821
6 Girder End Rect Portion Cum 2 1 2.000 0.625 1.570 3.925
7 Girder Top Haunch Side end portion Cum 4 1 1.070 0.150 0.075 0.048

Nos of Girdrs 1 14.679 14.679


Details of Concrete Quantity in Flyover Structure - Girder (20.0m Span - Curve)
Traingle
Sl No Description Description Parts Units Nos Length Width Depth Quantity
Portion
Inner Girder 2
1 Girder Bottom Flange Cum 1 1 16.112 0.625 0.250 2.517
2 Girder Bottom Haunch Cum 2 0.5 15.112 0.150 0.150 0.340
3 Girder vertical End Haunch Cum 4 0.5 1.000 0.150 1.170 0.351
4 Girder Top Haunch Cum 2 0.5 16.112 0.300 0.150 0.725
5 Girder Web Cum 1 1 16.112 0.325 1.320 6.912
6 Girder End Rect Portion Cum 2 1 2.000 0.625 1.570 3.925
7 Girder Top Haunch Side end portion Cum 4 1 1.070 0.150 0.075 0.048

Nos of Girdrs 1 14.818 14.818

Outer Girder 2
1 Girder Bottom Flange Cum 1 1 16.325 0.625 0.250 2.551
2 Girder Bottom Haunch Cum 2 0.5 15.325 0.150 0.150 0.345
3 Girder vertical End Haunch Cum 4 0.5 1.000 0.150 1.170 0.351
4 Girder Top Haunch Cum 2 0.5 16.325 0.300 0.150 0.735
5 Girder Web Cum 1 1 16.325 0.325 1.320 7.003
6 Girder End Rect Portion Cum 2 1 2.000 0.625 1.570 3.925
7 Girder Top Haunch Side end portion Cum 4 1 1.070 0.150 0.075 0.048

Nos of Girdrs 1 14.958 14.958

Total Quantity of Concrete in Girder with Diaphragm 84.398


Details of Concrete Quantity in Flyover Structure - Girder (20.0m Span - Curve)
Traingle
Sl No Description Description Parts Units Nos Length Width Depth Quantity
Portion
1 Deck Slab (P4 - P5)
RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 12.720 0.230 58.528

Total Quantity of Concrete in Deck Slab 58.528

2 Deck Slab (P5 - P6)


RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 13.200 0.230 60.736

Total Quantity of Concrete in Deck Slab 60.736

3 Deck Slab (P6 - P7)


RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 12.896 0.230 59.338

Total Quantity of Concrete in Deck Slab 59.338

4 Deck Slab (P17 - P18)


RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 12.284 0.230 56.522

Total Quantity of Concrete in Deck Slab 56.522

5 Deck Slab (P18 - P19)


RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 12.683 0.230 58.357

Total Quantity of Concrete in Deck Slab 58.357

6 Deck Slab (P20 - P21)


RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 12.881 0.230 59.269

Total Quantity of Concrete in Deck Slab 59.269

7 Deck Slab (P21 - P22)


RCC Concrete M35 (Design mix), using 20mm ISS HBG metal including cost and conveyance of all Materials to site and cement at
site including form work , using soft water, labour charges for mixing, transporting and placing in position, compacting, finishing and
curing, working at depths, hire charges for tools and plants and incidental charges, etc., complete, as per standard specifications (Super
Structuer in RCC Deck Slab) complete as per relevant MORT&H specifications 1000&2100.
Deck Slab Deck Slab Cum 1 1 20.005 12.679 0.230 58.339

Total Quantity of Concrete in Deck Slab 58.339