Professional Documents
Culture Documents
500
500
500
4. THE BUILDING IS DESIGN TO WITHSTAND THE EARTHQUAKE EFFECT OF
C1 C1 C1 A A SEISMIC ZONE-III.
F1 F1 F1
PB1
PB1
PB1
RB1
RB1
RB1
RS-1 RS-1
500
500
C1 C1 C1
F1 F1 F1
RB1
RB1
RB1
RS-1 RS-1
PB1
PB1
PB1
500 500 500
500
500
500
C1 C1 C1
F1 F1 F1 RB1 RB1
PB1 PB1
COLUMN FOOTING LAYOUT PLINTH BEAM LAYOUT ROOF BEAM-SLAB LAYOUT
FOOTING SCHEDULE SCHEDULE OF ROOF SLAB
FOOTING DIMENSION FOOTING REINFORCEMENT Bottom Reinforcement Extra Reinforcement at Top (Support)
FOOTING
Thickness
BOTTOM SLAB No. Short Span Long Span Short Span Long Span
NUMBERS L B D d
ALONG B ALONG L
Dia Spacing Dia Spacing Dia Spacing Dia Spacing
F1 1200 1200 375 175 10 # @150 C/C 10 # @150 C/C
RS1 150 10 150 10 150 10 300 10 300
16 #
12 #
10# @150C/C 8# @150C/C
1.5 X L HARNI CAMP P-05 & P-06
300
150
STRUCTURAL
8-16# COMMANDER
WORKS ENGINEERS (AF)
AS PER ARCH CHILODA
COLUMN MARKED :- C1 (L)
Section A-A
02 01
NOTES : THIS DRAWING IS PREPARED BY M/S SSPACIA DESIGN AND NUMBER ALLOTTED BY CHIEF ENGINEER
AIRFORCE GANDHINAGAR