Professional Documents
Culture Documents
NG CANA
05
3.0
20400
POND
11
7.1
Pipe T ottom=3.508
EXIESTI
51
4.1
62
op=5.2
Pipe B
29
ine
5.0
Pipe L
67
tial
5.0
86 06
a Residen
K 7.9 6.7 3 194
5.2 5.
M
300/4
Semi Pucc
67
Area
57 7.3
8.7 92
7.7 98 .35 2
Ch .7.9
6.3 5 5.35
RL
.15 65
tial
16
a Residen
0.0
5.5
Semi Pucc
3 storey
Area
Building 3 storey
Building
61 15
43 18 7.0 7.0
9 7.1
55 89 08 645 971 5.74 93 23 7.5
3.1 4.3 4.7 4. 4. 6.9 8.8
EP 37 Faidabad/Ati Para
65
EP 7.0
7.9
Ch.0.00
RL.9.300
D
ROA B3 B2
TI NG
Guard Room IES Guard
EX
Room
Switch Gate
18
6.7
6.8
33
TE R
OA D Toilet 20300
CRE 01
CON
S TING 9.3
EXIE 2
2
DN
7.0
apur
Abdulh 1
in
55 EP
1 in 31
NI
R DRA
UP
1 in 233
POND
SWITCH GATE
COVE
PI
PE
A D
T RO
HAL
DN
ASP
LI
TING
EXIS
NE
Ch.150.00
RL.11.113
33 kv
EP
EP
Ch.20225
11 0
.6
.1 0.0
3
RL .10
RL 11.11
Temporary Sheds
1.
3
Ch
Sheds
Temporary
20200
Rev Description By Verified Date Scale Client Consultants Contractors Drawn By Checked By ENGINEERS Project Drawing Title
H
CONSTRUCTION OF 3rd & 4th DUAL GAUGE RAILWAY TRACK
PROPOSAL OF NEW LC H