You are on page 1of 1

L

NG CANA
05
3.0
20400

POND
11
7.1

Pipe T ottom=3.508
EXIESTI
51
4.1

62
op=5.2
Pipe B
29

ine
5.0

Pipe L
67

tial
5.0
86 06

a Residen
K 7.9 6.7 3 194
5.2 5.
M
300/4

Semi Pucc
67

Area
57 7.3
8.7 92
7.7 98 .35 2

Ch .7.9
6.3 5 5.35

RL
.15 65

tial
16

a Residen
0.0
5.5

Semi Pucc
3 storey

Area
Building 3 storey
Building

61 15
43 18 7.0 7.0
9 7.1
55 89 08 645 971 5.74 93 23 7.5
3.1 4.3 4.7 4. 4. 6.9 8.8
EP 37 Faidabad/Ati Para
65
EP 7.0
7.9
Ch.0.00
RL.9.300

D
ROA B3 B2
TI NG
Guard Room IES Guard
EX
Room
Switch Gate

18
6.7

6.8
33
TE R
OA D Toilet 20300
CRE 01
CON
S TING 9.3
EXIE 2
2

DN
7.0
apur
Abdulh 1
in
55 EP

1 in 31

NI
R DRA
UP

1 in 233
POND

SWITCH GATE

COVE
PI
PE

A D
T RO
HAL

DN
ASP
LI

TING
EXIS
NE

Ch.150.00
RL.11.113
33 kv

EP
EP

Ch.20225
11 0

.6
.1 0.0
3
RL .10

RL 11.11

Temporary Sheds
1.

3
Ch
Sheds
Temporary

20200

Rev Description By Verified Date Scale Client Consultants Contractors Drawn By Checked By ENGINEERS Project Drawing Title

H
CONSTRUCTION OF 3rd & 4th DUAL GAUGE RAILWAY TRACK
PROPOSAL OF NEW LC H

BETWEEN DHAKA - TONGI SECTION AND DOUBLING OF DUAL AT Ch.20321.0(Court Bari)


GAUGE TRACK BETWEEN TONGI - JOYDEBPUR SECTION
Drg. No. -

Sheet No. : 01 OF 01 Rev.


00
Date : 03-12-2020
1 2 3 4 5 6 7 8 9 10 11 12

You might also like