Professional Documents
Culture Documents
The operating people have been adequately trained for the operation and maintenance of this
equipment.
Here with acknowledge that the installation & commissioning of the unit has been carried out to
the level of satisfaction.
Name:
Designation:
Date: ______/_______/_____________