SPECIFICATION S23A
MAY 2003.
TABLE OF CONTENTS
PART 1: GENERAL
1. SCOPE .............................................................................................S23A-1
2. STANDARDS .................................................................................S23A-1
3. SERVICE CONDITIONS...............................................................S23A-3
4. SYSTEM CONDITIONS................................................................S23A-4
6. SPARE PARTS................................................................................S23A-7
8. Submittals.........................................................................................S23A-9
PART 2: TECHNICAL
9. GENERAL .....................................................................................S23A-12
13. BUSHINGS....................................................................................S23A-14
PART 3: INSTALLATION
TABLES
Specification S23A - Load Break Switches
PART 1: GENERAL
1. SCOPE
2. STANDARDS
The equipment shall comply with the latest editions of, and amendments
to, the international standards listed below. Where any provision of this
specification differs from those of the standards listed below, the
provisions of this specification shall apply:
o BSI 729: Specification for hot dip galvanized coatings on iron and
steel articles.
S23A-1
Specification S23A - Load Break Switches
S23A-2
Specification S23A - Load Break Switches
3. SERVICE CONDITIONS
Environmentally, the region where the work will take place is a coastal
area, subject to an overall medium relative humidity, which can give rise
to condensation. Onshore winds are frequently salt laden. On occasions,
the combination of salt and condensation may create pollution conditions
for outdoor insulators.
Indoor material and equipment shall be designed and protected for use in
buildings, which occasionally may be wet and damp.
S23A-3
Specification S23A - Load Break Switches
4. SYSTEM CONDITIONS
o frequency 50Hz
o insulation levels:
1.2/50µs impulse
(positive and negative polarity):33kV 170kV
11kV 75kV
power frequency
(one minute withstand, wet): 33kV 70kV
11kV 28kV
LV 3kV
S23A-4
Specification S23A - Load Break Switches
5.1 Inspection
The TANESCO representatives shall have free entry at all times, while
work on the contract is being performed, to all parts of the
manufacturer's works which concern the processing of the equipment
ordered. The manufacturer shall afford the TANESCO representatives,
without charge, all reasonable facilities to satisfy themselves that the
equipment being furnished is in accordance with this specification.
5.2 Testing
The equipment shall successfully pass all the type tests and routine tests
referred to in part 2 and those listed in the most recent edition of the
standards given in clause 2 of this specification.
S23A-5
Specification S23A - Load Break Switches
The test certificates must show the actual values obtained from the tests,
in the units used in this specification, and not merely confirm that the
requirements have been met.
TANESCO shall have the equipment inspected after reception and the
TANESCO representatives shall have the right to select the samples if
desired. The supplier shall co-operate with this inspection and shall
provide the TANESCO representatives, free of charge, all the facilities,
which the latter may require.
In the case of components for which specific type tests or routine tests
are not called for in part 2 or in the quoted standards in clause 2 of this
specification, the manufacturer shall include a list of all tests he or she
proposes to carry out.
S23A-6
Specification S23A - Load Break Switches
6. SPARE PARTS
The bid shall include, a comprehensive list of all consumable and non-
consumable spare parts and accessories, if any necessary for five years
of normal operation as specified by the manufacturer.
The bidder shall give an assurance that spare parts will continue to be
available through the life of the equipment.
The spare parts shall be clearly identified and related to the specific
equipment item. Spare parts shall be delivered suitably packed and
treated for long periods in storage. Each pack shall be clearly and
indelibly marked with its contents, including a designation number
corresponding to the spare parts list in the operation and maintenance
instructions.
All spare parts shall be stored in the TANESCO central store at kurasini.
7.1 Packing
S23A-7
Specification S23A - Load Break Switches
All accessories shall be carefully packed so that they are fully protected
during transport and handling operations and in storage.
Each packing case shall be indelibly marked, in two adjacent sides and
on the top, with the following:
7.2 Shipping
All transport accessories, such as riding lugs, jacking pads, blanking off
plates, etc. shall become the property of TANESCO.
S23A-8
Specification S23A - Load Break Switches
All accessories shall be carefully packed so that they are fully protected
during transport and handling operations and while in storage.
8. SUBMITTALS
S23A-9
Specification S23A - Load Break Switches
o safety data sheets for all substances used with the equipment;
S23A-10
Specification S23A - Load Break Switches
S23A-11
Specification S23A - Load Break Switches
PART 2: TECHNICAL
9. GENERAL
S23A-12
Specification S23A - Load Break Switches
The insulation level of the 33kV Load Break Switches shall be:
o 50Hz, one minute, withstand voltage level (wet and dry): 70kV.
The insulation level of the 11kV Load Break Switches shall be:
o 50Hz, one minute, withstand voltage level (wet and dry): 28kV.
The current ratings of the 33kV Load Break Switches shall be:
The current ratings of the 11kV Load Break Switches shall be:
S23A-13
Specification S23A - Load Break Switches
13. BUSHINGS
The bushings shall be of the solid glazed porcelain insulator type and
shall be bird proof. They shall meet the electrical and mechanical
characteristics required in IEC 383. Insulators shall be appropriate for
the switch's rated voltage of 33kV or 11kV, as the case may be. The
bushings shall be protected from mechanical damages while lifting up
the unit by providing holding grips around the bushings.
The bushing insulators for the 33kV load break switches shall
withstand for one minute, dry and wet 50Hz test voltages of not less
than:
The bushing insulators for the 11kV load break switches shall
withstand for one minute, dry and wet 50Hz test voltages of not less
than:
The bidder shall also give the following information in the technical data
schedule:
The maximum radio influence voltage for both 33kV and 11kV load
break switches shall be 250µV, measured in accordance with IEC 437.
S23A-14
Specification S23A - Load Break Switches
15. CLEARANCES
The bidder shall give the following information in the technical data
schedule for both, 33kV and 11kV load break switches:
The interrupting medium shall be air although the load break switch is
totally enclosed. This shall be achieved by use of arc chute also known
as elephant ears to quench the arc; similar to the load break switches
current in use on TANESCO distribution network
Lifting hooks shall also be provided at the top of the switch. These shall
be provided on all Load Break Switches and be so disposed as to allow
the entire switch to be lifted without damage, particularly to bushings
S23A-15
Specification S23A - Load Break Switches
The fixed contact at which the circuit is broken should have a split head
contact, shaped to take the switch's blade parallel to the direction of
motion. The contact area of current carrying components shall be
made of silver plated, high conductivity copper.
Each unit shall be provided with the necessary linkage rope to allow the
load break switch to be operated from ground level after the ropes are
connected to the operating handle mounted on the switch. Indications for
operation state, that is ON or OFF shall be provided. Markings of
ON/OFF indications shall be of painted illumines or reflecting colours
and they shall be readable from the ground level. Colours of preference
are GREEN for OFF and RED for ON positions.
The lead wires from the bushings on the load break switch units for
connecting to the line conductors shall be insulated annealed copper
conductors 125mm2 of minimum length 2 meters. Also each end of
the lead wires shall be ferrule ready for connecting to the line
conductor.
S23A-16
Specification S23A - Load Break Switches
All iron and steel parts shall be protected against corrosion by hot dip
galvanising to the standards of BS 729 or equivalent in so far as they
meet the requirements that follow.
The supplier shall ensure that internal stresses in the material brought
about by such treatments as extensive cold working, bending, welding
etc., are relieved as necessary before submission for hot dipping as these
stresses could lead to embrittlement and/or intercrystalline cracking after
galvanising.
Crevices and pin holes shall be avoided in welds as they trap pickling
acid and lead to premature corrosion of the zinc coating.
Articles shall not be galvanised if their design and shapes are such that
the pickling solution cannot be removed with certainty or if adequate
venting or drainage is not possible to ensure a safe and effective
galvanising dip. If it is necessary to bore drainage or vent holes in
articles, the galvaniser or supplier may do so only after the consent of
TANESCO representative has been obtained.
The zinc of the hot dip galvanising bath shall contain not less than
98.5% by mass of zinc according to ISO 752. No zinc impurities or
additives which could have a deleterious effect on the durability of the
zinc coating shall be acceptable.
S23A-17
Specification S23A - Load Break Switches
The thickness of the galvanising coating shall comply with the minimum
average values given in Table 1 overleaf when tested in accordance with
the requirements of this specification.
The mass of the galvanising coating per square metre of the surface area
shall comply with the minimum values given in Table 1 overleaf when
tested in accordance with the requirements of this specification.
S23A-18
Specification S23A - Load Break Switches
23. GUARANTEE:
Should any design fault become apparent to TANESCO after the expire of
the above guarantee periods, the manufacturer in collaboration with his
local agent shall deliver components necessary to correct the faults, together
with any necessary instructions and specialist assistance, FREE OF
CHARGE.
S23A-19
Specification S23A - Load Break Switches
24. TESTS
Routine tests for load break switches shall be carried out in accordance
with IEC 129. In addition galvanising tests shall be carried out, as
detailed below.
The following type tests shall be carried out in conformity with IEC 60,
IEC 129, IEC 437 and and IEC 507:
o dielectric test;
Where load break or making current tests have been performed on the
model being offered, these test results shall also be supplied with the bid.
Performance shall be tested after the load break switch has been
subjected to 1,000 hours of salt spray corrosion, in conformity with
IEC 507. An equivalent field experience in coastal sites shall be
acceptable.
The bidder shall confirm that the current carrying contacts shall meet the
temperature rise requirements after approximately 20 years of coastal
exposure and that other metal parts shall retain their mechanical strength.
S23A-20
Specification S23A - Load Break Switches
o visual inspection;
o thickness of galvanising coat; and
o uniformity of galvanising coat.
In the event of disagreement or dispute over the results of the above tests
a coating mass test shall be carried out, as set out below. The result of
this test shall be definite and binding.
The instrument used shall have the necessary degree of accuracy, range
of probes and probe adapters to enable reliable readings to be obtained
consistently. Otherwise, the TANESCO representative shall nominate a
suitable instrument for the purpose of obtaining the measurements.
S23A-21
Specification S23A - Load Break Switches
This test, when required, shall normally be carried out on two samples.
The two samples chosen shall be the ones that have given the lowest
readings when tested by the magnetic measurement method.
For shaped items, details of the method of calculating the surface area
shall be agreed between the contractor and the project manager.
S23A-22
Specification S23A - Load Break Switches
25. SCHEDULES
Manufacturer
Country of origin
Type of Mounting
S23A-23
Specification S23A - Load Break Switches
flashover voltage kV
Insulator Colour
S23A-24
Specification S23A - Load Break Switches
Degree of Protection
NOTE: please, fill one schedule for EACH TYPE of Load Break Switch
S23A-25
Specification S23A - Load Break Switches
On this schedule the bidder shall provide a list of non compliances with
this specification, documenting the effects that such non compliance is
likely to have on the equipment's life and operating characteristics. Each
non compliance shall be referred to the relevant specification clause.
S23A-26
Specification S23A - Load Break Switches
On this schedule a list of the test certificates included with the bid shall
be provided. This list shall include type test certificates and sample
routine test reports. Each certificate listed shall be referred to the relevant
specification clause.
S23A-27
Specification S23A - Load Break Switches
PART 3: INSTALLATION
26. INSTALLATION
S23A-28