You are on page 1of 60

MONET ROAD CONSTRUCTION WORK

PLC)

COMPANY PROFILE
&
GENERAL INFORMATION FOR
Construction OF SLAB CULVERT
AROUND ROBE BARAKO RESIDENCE
LOT-1

1
TABLE OF CONTENTS

SECTION 1 GENERAL INFORMATION AND EXPERIENCE


 LEGAL QUALIFICATION
SECTION 2 WORK METHODOLOGY AND SCHEDULE
SECTION 3 MAN POWER (KEY PERSONNEL)
SECTION 4 TECHNICAL EVALUATION
1. Qabinsa Herrega fi Oditii
2. Bulchiinsa fi Hoggansa Walda’aa fi Keessu
3. Qusannaa
4. Fayyadam ummaa Dubarti fi Dargago
5. Karoora Guutuu Hojii Dorgoma
6. Gahumsaa Tekinikaa
7. Muuxannoo Rawwii Darbee fi Gahumsa
8. Walttii Hidhamiinsa Gabaa
9. Leenjii Hubannoo Gaggabaaboo fi TEI

2
SECTION 1

GENERAL INFORMATION
AND
EXPERIENCE

3
MONET ROAD CONSTRUCTION WORK PLCCompanyis a general construction without
water works company established in 2021GC (2014EC) in Oromia regional state adola woyu
city. The main goal of the company is to participate in the construction sector of the city and also
to achieve the government’s policy on the infrastructure sector.

A great design on paper is nothing if it is not implemented correctly on the ground. Getting it
right for the first time requires knowledge, foresight and experience. MONET ROAD
CONSTRUCTION WORK WITH (PLC) technical team possesses these attributes and is
dedicated to actualizing great design ideas in to the ground.

MONET ROAD CONSTRUCTION (PLC) Company has a vision of becoming the best
construction company from the current other existing companies by constructing quality services
to the public by getting fair profit for our team personnel’s. The company is planning to create
integrity, quality work and social need satisfaction for the society.

The company is registered under Oromia micro and small enterprises development agency by
pertaining the necessary legal requirements with a license number ADOLA WOYU/UIIDP/W-
012/2014 It is also registered to and in accordance with a VAT certificate number 17828211047
and tax payer identification number 0075537146 issued on 6-NOV-2021 by Oromia national
regional government revenue bureau.

4
COMPANY STRATEGY

 PURPOSE

To be a leader in the construction industry by providing enhanced services, relationship and


profitability.

 OUR VISION

“To become not only competent but also the best in the field of construction and related fields in
regional and national level” is the main vision of the firm. Thus we strive to achieve quality,
consistency, and technological advancement in every step of out movement. The foundation of
our success is our desire to listen. We don’t self an “off the shelf” product, we assemble a
dedicated team to construct for each individual projects. To

 Develop solid construction strategy and execution plans for deploying on initiatives
 Utilize the latest construction technology to improve the potential of the firm
 Implement innovative and measurable constructions
 Build long-term partnerships with our clients
 MISSION STATEMENT

To build long term relationships with our customers and clients and provide
exceptional customers services by pursuing business through innovation and
advanced technology.

To be honest in all our activities, dealing and to consciously introspect our work and
action on day to day basis.

 CORE VALUES
 To enhance the quality of constructions.
 To enhance customer value.
 To serve with best value for money and high return on project.

5
1. Legal qualifications
1.1 Nationality Ethiopians

1.2 Conflict of interest None

1.3 Registration of FPPA suppliers list None

1.4 Debarred by decision of FPPA Not debarred

1.5 Valid trade license Attached

1.6 Vat registration Attached

1.7 Valid tax clearance None

1.8 Renewed registration certificate Attached

1.9 Government owned entity None

6
A. Bid Submission Sheet
Place and Date: Adola Woyu, Oromia, November, 2021, 10:00

Procurement reference number: Adola /UIIDP/W-012/2014

Procurement method: LCB

To: Adola woyu CITY ADMINISTRATION

Adola Woyu

ETHIOPIA

SUBMITTED BY: MONET ROAD CONSTRUCTION (PLC)

Attention to: expansion of infrastructure and design approval process owner office.

Complete legal name and address of


Nationality
the seat of the bidder

leader ETHIOPIA
Dararaa liben shasho
N

Gudata dekama Bali ETHIOPIA


genet Roba Dukale N

ETHIOPIA
Feyisa Gudisa Gonfa
N

members ETHIOPIA
Kenbon Alamu Ayyele
N

ETHIOPIA
Keneni Asfewu Fikadu
N

ETHIOPIA
sukare utura zeleke
N

In response to your bidding documents for the above procurement number [ADOLA/UIIDP/W-
012/2014)we, the undersigned, hereby declare that

7
(a) We have examined and accept in full the content of the bidding documents for the
procurement number: Adola /UIIDP/W-012/2014
(b) we hereby accept its provisions in their entirety, without reservation of restriction.
(c) We hereby declare that all the information and statements made in this Bid are true and
accept that any misinterpretation contain in it may lead to our disqualification.
(d) We, the undersigned, offer to execute in conformity with the bidding documents dated
[nov-6-2021) the following works Adola Woyu [construction cobble stone road from
seba shop to general market with Ditch & retaining wall lot-5]
(e) The total price of our Bid, excluding any discounts offered in item (e) below is [only
technical qualification]
(f) The discounts offered and the methodology for their application are [only technical
qualification]
Unconditional discounts: if our bid is accepted, the following discounts shall apply [only
technical qualification]
Methodology of application of the discounts: the discounts shall be applied using the
following method [only technical qualification]
Conditional discounts: if our bid(s) are accepted, the following discounts shall apply
[only technical qualification]
Methodology of application of the discounts: the discounts shall be applied using the
following method [only technical qualification]
(g) Our bid shall be valid for a period of 90 days from the date fixed for the bid submission
deadline in accordance with the bidding documents, and it shall remain binding up on us
and may be accepted at any time before expiry of the period.
(h) The prices in this bid have been arrived independently, without, for the purpose of
restricting competition, any consultation, communication, or agreement with any other
bidder or competitor relating to:
i. Those prices
ii. The intention to submit a bid; or
iii. The methods or factors used to calculate the prices offered
(i) The prices in this bid have MONET ROAD CONSTRUCTION (PLC)] directly or
indirectly, to any other bidder or competet or before bid opening.

8
(j) We,including any contractors for any part of the contract, resulting from this procurement
process, are eligible to participate in public procurement in accordance with ITB clause
4.1 and have not been debarred by a decision of the public procurement and property
administration agency from participating in public procurements for breach of our
obligation under previous contract
(k) We are not insolvent, in receivership, bankrupt or being wound up, not have had our
business activities suspended and not be the subject of legal proceedings for any of the
foregoing;
(l) We have fulfilled our obligations to pay taxes according to Ethiopian tax laws
(m)We have read and understood the provisions on fraud and corruption in GCC clause 5
and confirm and assure to the public body that we will not engage ourselves into this evil
practices during the procurement process and the execution of any resulting contract
(n) We have not committed to act of embezzlement, fraud or connivance with other bidders
(o) We have not given or have been offered to give inducement or bribe to an official or
procurement staff of the ADOLA woyu finance and Eco. Development to influence the
result of the bid into our favour.
(p) We are not participating, as bidders, in more than one bid in this bidding process, other
than alternative bids in accordance with the bidding document.
(q) We don’t have any conflict of interest and have not participated in the preparation of the
original schedule of requirements for the public body.
(r) If our bid is accepted, we commit to submit a performance security in accordance with
the GCC clause 58 of the bidding document, in the amount of [ estimated liquid
asset]for the due performance of the contract.
(s) We, including any subcontractors or suppliers for any part of the contract, have
nationalities from eligible countries [Non joint venture consortium or association, and
the nationality of each sub-bidder]
(t) We will inform the Gelan city immediately if there is any change in the above
circumstances at any stage during the implementation of the contract. We also fully
recognize and accept that any inaccurate or incomplete information deliberately provided
in this bid may result in our exclusion from this and other contracts funded by the
government of the federal democratic republic of Ethiopia.

9
(u) We understand that this bid, together with your written acceptance there of included in
your notification of award, shall not be constitute a binding contract between us, until a
formal contract is prepared and executed.
(v) We understand that you reserve the right to reject any or all bids that you may receive

Name: MONET ROAD CONSTRUCTION "(PLC)

In the capacity of: darara liben

Signed: _____________

Duly authorized to sign the bid for and on behalf MONET ROAD CONSTRUCTION PLC

Dated on day of [nov-6-2021]

Attachments

1. Valid trade license indicating the stream of business in which the [] is engaged
2. Vat registration certificate issued by the tax authority[attached]
3. A valid tax clearance certificate issued by the tax authority [None]
4. Business organization registration certificate or trade license issued by the country of
establishment [attached]
5. Relevant professional practice certificates[attached]
6. Bid security; and
7. Power of attorney requires. [attached]

B. Bidder Certificate of Compliance


Place and Date: (ADOLA WOYU Oromia, nov-6-2021 ,4:00)

Procurement reference number: Adola/UIIDP/W-012/2014

To: [ADOLA WOYU CITY ADMINISTRATION]

Attn: [CITY ADMINISTRATION]

[ADOlA WOYU]

10
[OROMIA]

11
1. General information about the bidder

Bidders legal MONET ROAD CONSTRUCTION (PLC)


In case of joint venture, Not acceptable(N/A)
legal name of each
party:
Place of registration: ADOLA WOYU
Legal address in +251991082546 City ,ADOLA WOYU ,Oromia,ETHIOPIA
country of registration
Name: dararaa liben
Authorized Position: Managing director
representative Address: ADOLA WOYU,Ethiopia
information Telephone: +251991082546
Email address:
 In case of JV, letter of intent to form JV including a draft
agreement, or agreement governing formation of JV, in
accordance with ITB Sub-Clause 4.1
Attached copies of  Form Data on Joint Ventures
original documents of:  In case of government owned entity from the Public Body’s
country, documents establishing legal and financial
autonomy and compliance with the principles of commercial
law, in accordance with ITB Sub-Clause 4.4.

We have attached an official written statement by a power of attorney (or notary statement, etc.)
proving that the above person, who signed the bid on behalf of the company/joint
venture/consortium, is duly authorized to do so.

12
POWER OF ATTORNEY

To: ADOLA WOYU city Administration

Subject: Power of Attorney

Dear Sir,

It is recalled that you are invited CONSTRCTION OF SLAB CULVERT AROUND


ROBE BARAKO RESIDENCE LOT-1

We are pleased to participate in this tender and hereby would like to express our readiness and
strong commitment to undertake and execute the project.

The company’s general manager, to sign and be bound to any commitment and contractual
agreement that may be forwarded to.

We hereby confirm that the bid security and bid validity specified in the instructions of the
bidders.

Yours truly,

Dararaa liben

General Manager

13
LEGAL QUALIFICATION

14
SECTION- 2

CONSTRUCTION
METHODOLOGYAND
SCHEDULE

15
WORK METHODOLOGY
Construction is the mobilization and utilization of capital of the project and assign
specialized personnel, supply and apply approved material and good conditioned and efficient
equipments to assemble material and equipments on specific site in accordance with drawings,
specifications and contract documents prepared to serve the propose of the client.

All construction projects have an element of risk. The risk encompasses the element of
Time, Money and Quality. As an over view, the degree of risk is directly associated with the
money spent and the time devoted too and the quality of the management of the project. To
fulfill the interest of the client MONET ROAD CONSTRUCTION (PLC) give great
consideration for the next three terms of construction Time, Cost and Quality.

1. TIME MANAGEMENT

All the construction works consisted in the construction process are performed in a specific time
schedule, which is following under the sequence of each works, in order to decrease conditions
which, affect the overall time of the construction. Inaddition, works also can be executed parallel
without affecting adjoining performance.

 Sequence: - the vitality of classification of a specific job in the order of its natural
precedence is most important. Especially the significance of identifying and breaking into
smaller parts is high in maintenance works, because it has to be done in such a way that,
without affecting those parts not subjected for maintenance.

16
liQ
p
E
M
I
m
o
c
a
(
T
S
O
C
k
u
w
jb
e
h
s
+
tr
n
Y
L
A
U
f
d
)
g Chart 1: Sequence
 Works in parallel: - after setting sequential order of the whole of the work then will be
categorized by selecting parts of it, which could be executed parallel with other works.
This also helps in effecting efficient time management and clear ground of supervision.
1.1. Labor, Material and Equipment
a) Labor: - We have sufficient skilled laborers and will employ a lot of un-skilled labors
if awarded. Having the expected quantity of labor is not always the only reason for an
effective and efficient accomplishment.

17
p
O
H
d
A
s
b
L
F
iE
S
g
jm
lP
r
n
o
c
ty
e
f
a Chart 2: Site Organization
b) Material: - The supply of material will be handled by bringing into the site the
required material a head of the start of specific job for which the material is needed.
For this we have arranged suppliers. This will be done after the sample gets approval
by the respective body.
c) Equipment: - We have made ready every necessary tools and machineries to rent for
the execution if awarded.
1.2. Project planning, management and Evaluation

Project plan consists of scope of the work, breakdown project into activities, developing
network plans, schedule of work and charting site layout.

18
m
T
I
D
O
C
E
g
r
C
a
P
t
a
l
A
-
n
o
i
t
u
c
e
x
p
R
h
M
m
F
y
v
j
b
S
f
d
u
s
r
n
Project plan clearly defines project scope of work. It breaks down project objectives into clear,
identifiable, quantifiable, attainable and verifiable goals which are assigned to individuals and
responsibilities center for accomplishment.

19
2. COST

Construction equipment’s required for the execution of a certain construction project are
either owned or rented fromequipment leasing companies.

In the process of construction cost estimation, the contractor will normally assume the
intended construction activities will be performed using his own equipment’s or rented
equipment’s from others, if equipment’s are required for the execution of these activities. When
we say cost of the project, comprises two elements, Direct and indirect costs.

2.1. Direct Cost:

This consists cost of material, labor and equipment to execute specific work item.

We assess the availability of local material and their prices, transportation cost to move
materials.

Labor cost is considered indexed hourly rate of specific labor.

Consider different types of leaves and allowances, benefits, travel subsides and cost of overtime
related to targeted output.

We also consider equipments cost by analyzing hourly rental cost and considering the output of
the equipment to get the total cost of equipment assigned for the specific work item.

Therefore, our Direct cost will be the sum of Material, Labor and equipment cost.

2.2. Indirect Cost:

It consists of overhead cost and profit

 As every project construction has its own profit margin, we have a profit margin set to
this specific project and overhead cost.
 Our overall cost will be the sum of direct and indirect costs.
3. QUALITY AND SAFETY

Quality control and safety represent increasingly important concerns for project managers.
Defects or failures in constructed facilities can result in very large costs. Even with minor

20
defects, re-construction may be required and facility operations impaired. Increased costs and
delays are the result.

Organizing for quality and safety

The safety culture of an organization is the product of individual and group values, attitudes,
perceptions, competencies and patterns of behavior that determine the commitment to, and the
style and proficiency of, an organization’s health and safety management

A variety of different organizations are possible for quality and safety control during
construction. One common model is to have a group responsible for quality assurance and
another group primarily responsible for safety within an organization. In large organizations,
departments dedicated to quality assurance and to safety might assign specific individuals to
assume responsibility for these functions on particular projects. For smaller projects, the project
manager or an assistant might assume these and other responsibilities. In either case, insuring
safe and quality construction is a concern of the project manager in overall charge of the project
in addition to the concerns of personnel, cost, time and other management issues.

 Steps used in risk assessment of safety issues:

Step 1: Look for the hazards

Step 2: Decide who might be harmed and how

Step 3: Evaluate the risks and decide on action

Step 4: Record the findings

Step 5: Review the findings

Planning for safety

 developing a safety & health policy

 periodic evaluation of policy

 setting goals for safety

21
 creating budget for safety related expenditure

Therefore, our construction firm needs to consider these factors in order to ensure effective and
very good quality work.

Method of construction

The main objective of the contractor is to deliver appropriate construction materials in


accordance with the specification. This is to be done by maintain good workmanship and
satisfactory rendering of finishes within the specified period of construction.

To accomplish this, the following construction procedures are established to be the general
guidelines in the implementation of the project.

Construction procedures

Field survey and geotechnical investigation

Before construction can commence, a site survey will be performed to stake out the existing
structures, exact property lot boundary and grid lines of the project site, existing roads, electrical
cables, water lines with its service connections and access entryways from public roads, etc.

Once the surveys are complete and if there is a discrepancy result between the original plan and
actual site conditions, all disputes and re-design (if recommendable) will be resolved by the
consultant simultaneously with the massive excavation works by other contractor at cost by the
owner. Upon resolution of all disputes, the Excavator will continue and follow the desired trench
excavation according to the elevation’s set forth by the Owner/Architect required on proposed
Foundation plan.

Technical procedures
A. SURVEYING

Fix station points, PI, at 100-200m intervals from reference of the centerline of the Drainage.
Where there is a horizontal or vertical curve the interval of the PIs will be less than 100m.

B. DESIGN REVIEW

Design review and confirmation of the documents including drawings and specifications.

22
C. EXCAVATION AND EARTH WORK

Clearing and grubbing

Remove trees, tree roots, bushes, big stones, grass and other obstacles with 4 m width of the
drainage to allow adequate working space for movement of materials and workers. these
removed materials will be deposited to the directed place by Forman.

Top soil /Bulk/ excavation

Excavate the top soil 15-20cm top soil to remove the soil with grass and organic layer of the soil
which is weak, compressible and not required for construction then deposited to the directed
place by the Forman.

Trench /Pit/ Excavation

Excavate the layer of the soil next to the top 15-20 cm, until the specified depth is attained.

Backfilling using sub-base material

Supply, spread and compact 15-20cm, or more of sub-base granular material or gravel sub –base
as directed by the Forman, to fill the outer side of the Masson drainage.

Cart away

Cart away surplus excavated materials, which is not needed for backfilling.

Hand tools and Equipment’s for Earthwork

The hand tools used in activities under earthwork category, but not limited to, are pickaxe, hoe,
shovel,wheelbarrow,mattock,crowbar,axe,hand rammer, animal drawn carts, tractor-trailer
combinations, etc.

D. CONCRETE WORKS
1. Mixing: All structural concrete shall be mixed and delivered to site by transit mixers.
Each batch delivered at jobsite shall be accompanied by a time slip issued at the
batching plant, bearing the time of departure. Discharge of concrete shall be
completed within an hour after the introduction of water to the mix.

23
2. Testing: samples for different sizes of rebar shall be taken for every delivery. This
shall be submitted for testing to verify their conformity to specifications. Subsequent
random testing shall be conducted throughout the construction period.
E. FORMWORKS
Application: Varied types of forms will be utilized to different structures whichever fit
the requirement. These are metal panels and metal decking forms. For culvert wood and
metal forms will be used.
F. MASONRY WORKS
1. Laying: Concrete masonry units shall be laid following the progress of trench
excavation. Adjust each unit to its final position while mortar is still soft. If any unit
is disturbed after mortar has stiffened relay and replace in new mortar.
2. Testing: Samples shall be taken per delivery. These will be tested for compression to
verify their conformity to specifications. No unit shall be allowed for installation until
satisfactory test results are presented.

24
SUMMARY

The site supervisors (all members) have responsibility for the control of works in order to ensure
that the project is executed in accordance with the plan and specifications.in general terms the
items of work to be checked are the following:

A) Surveying
B) Design review
C) Setting out
D) Earthwork
E) Excavations
F) Backfilling
G) Cart away
H) Masonry
I) Concrete work
J) Drifts
K) completion and execution of site work
L) repair and maintenance

25
SECTION 3

MAN POWER (KEY


PERSONNEL)

26
Qualification and experience of key personnel

Bidder: MONET ROAD CONSTRUCTION (PLC)

Place of Registration: ADOLA WOYU


Business place: ADOLA WOYU
Year of establishment -: 2021GC (2014 EC)
Bid signatory power: General Manager
Contact No.: +251991082546
TEAM AND STAFF
1. Dararaa liben
 Nationality: - Ethiopian
 Position: - Project Manager
 Field of studying: - B.SC in wildlife and eco tourism management
 Year of graduation: - 16 sep 2021 Gc
 Lives in: ADOLA WOYU
 Contact no.: - +251991082546
2. Genet Robe
 Nationality: - Ethiopian
 Position: - Site manager
 Field of studying: - Management
 Year of graduation: - 26 Apr 2020 Gc
 Lives in: ADOL
 Contact no.:+251960962648
3. kenbon Alemu
 Nationality: - Ethiopian
 Position: - .Site engineer
 Field of studying: - B.SC in Civil Engineering

27
 Year of graduation: - 13 AG 2021Gc
 Lives in: ADOLA WOYU
 Contact no. +251921139287
4. keneni Asfew
 Nationality: - Ethiopian
 Position: - Oudeter and material supervision
 Field of studying: - .Survey engineering

 Year of graduation: - 28 AG 2019 GC


 Lives in: ADOLA WOYU
 Contact no. +25194035

5. SUKARE UTURA
 Nationality: - Ethiopian
 Position: -Purchaser and data collecter
 Field of studying: - Road constraction Level IV
 Year of graduation: - 5 Apr 2019 Gc
 Lives in: ADOLA WOYU
 Contact no.: - +251966776381

6.FEYISA GUDISA
* nationality;ETHIOPIAN
* position;site forman
* field study ;geo engineering
*year of gradution;18 July 2019 Gc

*lives in :ADOLA WOYU


*contact no:+251991082546

28
7.GUDATA DEKAMA
nationality:ETHIOPIAN
postion:accountant
field study: Accounting and Finance(BA)

year of gradution:06 sep 2020 Gc

TEAM MEMBERS SIGNATUR

1. Feyisa Gudisa ………………………


2. Darara liben …………………………
3. Gudata Dekama ……………………
4. Kenbon Alamu ………………….
5. Genet Roba ……………………..
6. Sukare Utura
7. keneni asfewu…………………..

29
SECTION 4

TECHNICAL EVALUATIO
1. Qabiinsa herregaa fi oditi

1.1. Qabiinsa sanada galii fi baasi herregaa

Waldaan keenya Sanada galii fi baasii herregaa seera qabeessa ta’e maxxansiisuun abbaa
tayitaa galiwwan godina Gujiitiin mirkanaa’ee chapefameen fayyadamuuf qophessuu kenya
ni ibsina

1.2. Bu’aan ooditi gaari, kisaara, badii

Waldaan adeemsa sochii herregaa dhabbataa gabasa herregaa hojetame ni qaba

1.3. Arganno maxxantummaa fi Aadmalee bilisa

 Waldaan maxantummaa irraa bilisa ta’uun hojii isaa dandeetti fi ga’umsa qofa irratti
xiyyefate hojata.

 Hojii hojatu seera ijaarsaa, dizaayinii kenname eguun qulqullinan hojata.

 Hojii hojjatu irratti aadaa fi dudhaalee ummata naannoo eeguu kabajuun hojjata.

 Dhimmoota aadaan ala ta,an (admalee) cimse irrati qabsa’a.

 Wantoota searan ala ta,an (malaanmaltumma) yoo qunname kutannoon ni saaxilessa.

 Gibira bu,aa galii iftiminaan baasee ni kafala.

1.4. Yerotti gibira bu,aa, gibira minda kkf kaffalu

30
 Waldaan harawa waan ta,eef hanga ammaa baasii gibiraa hin kafalle.

 Gara fulduraa garuu hojii hojatee bu,aa argatuu irraa basii fi galii seeraan galmeessa
idaa gibiraa (income tax) iftooman herrege oditii ni gosisaa, yeroon ni
kafala.akkasumas gabasaa vati ji,a ji,an ni gabasna.

1.5. kiraa suuqii fi dirqama biroo kaffaluu isaani

 Kiraa mana waajjiraa kan ji.a saddet kafalamee jira.

 Dirqama taxi motummaa yeroon herreegnee galchuuf karoora faayinaansii irratti ifatti
ka’ame jira.

1.6. kaffaltii sirrii ta,e gaaffachuu fi maxxantummaa

 Maxxantummaa irraa bilisa ta’uun, kafaltii seeran eyyamamu gaafachu.

 Hojii jalqabuuf kafalti duraa % 20 gaafachu.

 Seeraa ijaarsaa projektii irratti hundaa,un sadarkaa hojii hojatame ogeesaa hordofii
projektiitin mirkanaa,e dhiyessun kafaltii barbaadamu gaafachuu.

31
32
2. Bulchiinsa fi hooggansa waldaa fi keessoo waldaale
2.1. Miseensi gahe ifa qabu hojjatu

Waldaan koree hojii raawwachiiftuu miseensa nama jaha hammate yoo qabaatu gurmaa’inni
koreetis akka armaan gaditti ibsame ta’aa.

lak Maqaa Miseensoottaa saala Sadarkaa barnota Gahee hojii

1 Dararaa liben Dhi Digrii Dura ta’aa

2 Gudata dekama Dhi Digrii mallaqaa qabaa

3 kenboni alemu Dhi Digrii Too’annaa fi hordoofi qabenyaa

4 genet roba Dhi Digrii I/g damee herrega fi qabeenyaa

5 sukare Utura fi qananii Du level &digrii Koree miseensa


asfewu
6 feyisa Gudisa Dhi digrii Koree bitta fi gurgurtaa

Akka barbaachisummaa isaatti koreen hojii raawwachiiftuu ykn yaa’iin waliigalaa koree adda
addaa hundeessuu ni dand’a.

2.2. Walii galuu fi dimokraasii

 Mirga miseensotaa eeguu

 Walii galteen hojjachuu

 Miseensotaa kabajuun hojjechuu

 Yeroo kamuu dambii ittiin bulmaata waldichaa irratti hundaa’uun hojechuu

 Hojii irratti iftoominaan hojjechuu

 Olaantummaa dambii ittiin bulaataa kabajuu

 Angoo fi gahee hojii kennameef qofa raawwachuu

33
 Murtee gahee hojii koreetiin ol ta’ee walgahii miseensa waliigalaatiin murteessuu

2.3. Wal-tajjii idilee hojii ofii rayyaan madaaluu

 Waltajjii idilee fi ariifachiisaa koree hoji-raawwachiiftuu ykn yoo barbaachise yaa’ii


waliigalaa waamun murtessuu

 Korreen Sochiiwwan gama misoomaatiin waldaan godhu abbummaan ni hordofa.

 Karoora misoomaa kan waldichaa ni qopheessa.

 Sochiiwwaan misoomaa miseensota fayyadamaa taasisu danda’an ni qopheessa ni


hojjata.

2.4. Waliigalun hojjachuu fi demokraasummaa

 Iftoomina

 Wal irraa barachuu

 Tajaajila si’ataa kennuu

 Qulqullinaaf dursa kennuu

 Itti gaagfatamummaa

 Amanamummaa

 Tajaajiiltummaa, hunda ija wal –qixaan ilaaluu.

 Haqa- qabeessummaa

 Fayyadamummaa Ummataatif hojjechuu

2.5. Dambii ittin bulmaatan wal-hooganurrattii


2.5.1. Koree hojii raawwachiftuu

Waldaan koree hojii raawwachiftuu miseensa nama jaha hammate yoo qabaatu gurmaa’inni
koreetis akka armaan gaditti ibsame ta’aa.

34
a) Dura ta’aa,
b) Itti gafatamaa damee herrega fi qabeenyaa
c) mallaqaa qabaa
d) Too’annaa fi hordoofi qabenyaa
e) miseensa koree
f) Bitta fi gurgurta

Akka barbaachisummaa isaatti koreen hojii raawwachiiftuu ykn yaa’iin waliigalaa koree
adda addaa hundeessuu ni dand’a.

2.5.2. Aangoo fi Itti Gaafatamummaa


a) Dura taa’aa waldichaa

 Walgahiiwwan koree hojii raawwachiiftuu fi yaa’ii waliigalaa ni hooggana.

 Hojii irraa olmaa murtiiwwan yaa’ii waliigalaa, koree hojii raawwachiiftuu fi koree
too’annaa ni hordofaa.

 waldichaa bakka bu’ee qaama biroo wajjiin waliigaltee ni raawwata.

 Sochii waliigalaa akkasumas sochii herregaa fi qabeenya waldichaa ol’aantummaan


ni toowata.

 Walgahii idilee fi ariifachiisaa koree hojiraawwachiiftuu ykn yoo barbaachise yaa’ii


waliigalaa ni waama ni gaggessa.

 Karoora waldaa niqophesa, yoo miseesan mirkanaa’ee ni raawachiisa

b) Itti Gaafatamaa dame Herregaa fi qabeenyaa

 Galmee herregaa waldichaa ji’a ji’an ni qopheessa.

 sochii herregaa fi qabeenya waldichaa abbummaan ni hordofa.

 Galii fi bahii qabeenyaa hojiif barbaadamuu, ni galmeessa, ni too’ata.

 Hojii dabalataa dura taa’aa waldichaa kennamuuf ni hojjata.

35
c) Mallaqaa qabaa

 Mallaqa waldichaa seeraan ni qaba.

 Galii waldichaa ni sassaaba.

 Kaffaltii adda addaa seera baasii herregaa gutee qophaa’ee ni raawwaata.

 Hojii dabalataa dura taa’aa waldichaa kennamuuf ni hojjata.

d) Too’annaa fi hordoofi qabeenyaa

 Walgahii koree too’annaa dura taa’ummaan ni hooggana.

 Sochii hojii waliigala waldichaa ni toowata, Iddoo rakkoo qabutti sirreeffamni akka
taasifamu ni godha .

 Sochii herregaa fi qabeenya waldichaa oodiitii ni godha ni gosisa.

 Hojii dabalataa dura taa’aa waldichaatin kennamuuf ni hojjata.

e) Miseensa Koree

 Walgahii koree hojii rawachiftuu irratti ni hirmaata.

 Ragaawwanii fi sanada too’annoo adda addaa ni qopheessa.

 Qaboo yaa’ii koree fi waliigalaa ni qaba.

f) Bitta fi gurgurtaa

 Haala gabayaa fi odefannoo addaa ta.e ni sassaba.

 Sochii gabayaa naanno fi alaas ni mirkannessa.

2.5.3. Yeroo hojii Waldaa

 Yeroon hojii waldaa torbeeti guyyota jaha (Hojjaduraa irraa hanga sanbataa) ta’aa.

 Guyyatti sa’aatii 8 hojjatama.

36
 Yeroo sensaa, ganama 2:30 – 6:30, waaree booda 7:30 – 11:30

2.5.4. Mirga fi Dirqama Miseensotaa

Mirga Miseensotaa

 Miseensi kamiyyuu adeemsa hojimaata ofii Waldaa irratti yaada kennuu, gaaffii
dhiyeessuu fi gaaffii dhiyeesseef deebii sirrii ta’e argachuu mirga qaba.
 Namni Miseensa Waldaa ta’e kamiyyuu, hooggansa fi koreewwan adda addaa Waldaa
qabu keessatti filatamuus ta’ee filachuuf mirga guutuu qaba.
 Namni Miseensa ta’e kamiyyuu miseensichaa seeraan galmee waldaa miseensotaa irratti
galmaaye kamiyyuu mirga guutuu nama miseensa ta’ee galmaaye waliin qaba.
 Miseensi miseensa waliin rakkoo qabu kamiiyyuu miseensa waldaa walii ta’uun furmata
itti kennuu qaba.
 Miseensi dirqama isaa bahe kamiyyuu faayidaa miseensonni akkaataa seera ittiin
bulmaata Waldaa kanaan argachuu qaban loogii tokko malee argachuuf mirga ni qabu.
 Miseensi kamiyyuu qabeenya waldaa horatu kamiyyuu akkaataa danbii waldaa ergifatee
itti fayyaadamuu ykn bu’aa waldaa sochii misoomaa keessatti argatu qoodachuuf mirga
fayyaadamuu ni qaba.
 Miseensi kamiiyyuu haala walii gala sochii fi hojimaata waldichaa sochii mallaqaa fi
qabeenya dabalatee yeroo barbaadetti gaafatee hubachuuf mirga ni qaba.
 Miseensi kamiyyuu fedhii isaatiin yeroo kamuu miseensummaa isaa addaan kutuu mirga
ni qaba. Haata’u malee kaffaltii bifa adabbiitiin kaffalaa ture yeroo miseensummaa isaa
gadi lakkise hin deebi’uuf.

Dirqama Miseensotaa

 Miseensi dambii ittiin bulmaataa kana amanee miseensa ta’e, dambicha kabajuu dirqama
qaba.
 Namni miseensa haarawa ta’ee seenu galmeef qarshii 300.00(dhibba sadi) kafaluu qaba.
Kaffaltiin galmee yeroo tokkoon ykn yeroo sadi hin caalleen hiramee kafaluu kan qabu
yoo ta’u miseensi tokko gargaarsa argachuu kan danda’u miseensummatti dhufee ji’a sadi
booda ta’a.
 Miseensi haarawa seene fi kan duraan jiru ji’aan buusii idilee qarshii 50.00(shantama).

37
Miseensi kamiyyuu murtii yaa’ii miseensotaa waliigalaaa irratti sagalee caalmaa argatee
murtaaye kabajuuf dirqama qaba. Sagalee caalmaa jechuun miseensota walgahii irratti argaman
harki walakkaa ol (%50+) yoo deeggaree yoo deegaree murtayee jechuu dha.

Qusannaa
2.6. Qusannaa dursaa qabaachuu
Qusannaa dursaa waldaan qabu qarshii 15,000 (Kuma kudha shan) hojii admeesistu ni qaba.
2.7. Qusannaa bu’aa %15 qabaachuu
Qusannaa waldaa qabu qarshii 15,000 (Kuma kudha shan ) kana irraa qusannaa bu’aa %15
qarshii 2250 (kuma lama fi dhibba lamaa fi shantama) baatii baatiin bu’aa maqa waldichatiin
WALQO irraa ni qabaa.
2.8. Qusannaa kaaffaltii of-irraa hirrisuun taasisan.
Halli qusannaa kaffaalti of-irraa hirrisuun taasisun maqa waldichan Miseensi tokko tokko
buusii woliti buusun kan kafalu ta’aa. Haa ta’uu malee yeroo amma kan kaffalti mootumma
waan ofii irraa waan hin qabnef misensoni waldicha offegannodhaf busii walitti busudhaf
qophii irraa jira.
2.9. Akka waldaattii WALQOti qusatu
Miseensi hunduu buusii waliiti buusudhaan walqottii lakkofsa herregaa miseensi waliin
banneen qarshii 15,000 (Kuma kudha shan) qusannee qabna. Yeroo bu’aan argame, %30
walitti buusudhan lakkofsa herregaa WALQO irraatti galfachudhaf walii gallee jirra.
2.10. Qusannaa dhunfa miseensonni
qaban
lak Maqaa Miseensoottaa saala Sadarkaa barnota Qusannaa
1 Fayisaa Guddisaa Dhi Digrii Ni qaba

2 dararaa libeni Dhi Digrii Ni qaba

3 Gudata dhekamaa Dhi Digrii Ni qabu

4 kenboni alemu Dhi Digrii Ni qaba

5 Genet Roba Du Digrii Ni qabdi

6 sukare Utura du Level-IV Ni qabdi


7 Qanani asfewu Dhi digrii ni qaba

38
2.11. Liqii yeroon deebisu
Waldaan hanga amma liqii hin fudhanne. Gara fulduraa yoo fudhate yeroon debisuuf walii
galee jira.

39
3. Fayyadamummaa Dubarti, Dargaggoo fi Ebbifamtootaa

3.1. Miseensonn %29 fi caaluu dubarti ta’u

waldan keenyaa miseensotta 7(torba) kan qabu yoo ta’u, dhira 5fi dubara 2

Maqaa isaani: -

Lak Maqaa Miseensoottaa salla umrii Ebbifamtoota Sadarkaa barnota


1 Fayisaa Guddisaa Dhi 26 University Digrii
2 darara libeni Dhi 26 Univeristy Digirii
3 gudata dhekama Dhi 28 University Digrii
4 sukare utura Du 25 BLTO Level-IV
5 kenibon alemu Dhi 24 Univeirsty Digirii
6 geneti roba Du 22 University Digirii
7 Qanani asfewu Dhi 26 university DIgiri

Miseensonnii %20 dubarti fi miseensi hundinuu dargaggoo ta’uu

40
41
42
waldan keenyaa miseensotta 6 (ee dha.
Maqoota isaan:-
Lak Maqaa saala umri Ebbifamtoot Sadarkaa Lak Maqaa
Miseensoottaa i a barnoota Miseensootta
1 Fayisaa Guddisaa Dhi 23 University Digrii 1
2 dararaa liben Dhi 26 University Digrii 2
3 Gudata dhekama Dhi 25 University Digrii

sukare utura Du 25 BLTO Level IV 4


Qananii asfew Dhi 26 university digrii 7

6 Genet Roba Du 23 University Digrii 6

7 kenbon alemu Dhi 24 university digrii 5

Miseensonnii %80 oli Dargaggoo ta’u.


Akkuma arman duraa umrii isaani ibsamu yalameti hundinuu
dargaggootaa.

Lak Maqaa Miseensoottaa salla umrii Ebbifamtoota Sadarkaa barnota


1 Fayisaa Guddisaa Dhi 26 University Digrii
2 dararaa liben Dhi 26 University Digri

3 Gudataa dhekamaa Dhi 25 university Digrii


4 kenibon alemu Dhi 28 University Digrii
5 sukare utura Dub 25 BLTO Level IV

43
6 Geneti Roba Dub 24 University Digiri
7 Qanani asfewu Dhi 23 University Digrii

Miseensonni Ebbifamtota BLTO COC qabachu

Miseensoni IMX BLTO irra Eebbifan 100% raga COC ni qaban


Lak Maqaa Miseensoottaa salla umrii Ebbifamtoota Sadarkaa barnota coc
1 Fayisaa Guddisaa Dhi 26 University Digrii
2 Dararaa liben Dhi 26 University Digrii
3 Gudataa dhekamaa Dhi 28 University Digrii
4 sukare uturaa Dub 25 BLTO Level IV Ni qaba
5 kenboni alemu Dhi 24 University degiri
6 Genet Roba Du 23 University Digrii
university digrii
Qananii asfewu Dhi 25

44
Karoora hojii qopheeffachuu(planning to execute the
assimegnment)
Maqaa Interpraayizii (Waldaa):-W/Dhunfaa MOONEET IJAARSA daandii fi
riqichaa(plc)

Teessoo Isaan:-Magaalaa ADOOLAA WOYYUU,GANDAA LAGA DUUFAA

Yeroon itti karoorfame Bara karooraa 2014 hanga 2015

Interpraayizichi (waldaa) iddoo hojii (office)

Ni qaba Hin qabu

Maqaa Misensootaa Waldaa (Intarpraayizii)

Fayisaa Guddisaa
Dararaa liben
Gudata dhekamaa
kenbon alemu
sukare utura
Genet Roba
Qananii asfewu

45
2 Karoora Meshaa waldaan kireefatu karoorfate
Lakk Gosa meeshaalee tajaajila Safartuu Baayina Gatii tokkoo Gatii Hundaa Ibsa
. ijarsaaf itti fayadamnu

1 Vaybiretara Yeroo 3 600birr/day 1800


2 Miksaraa Yeroo 4 1000birr/day 4000

Dimishaasha 5800

2.1 Meeshaalee (Waldaa) Interpraayiziin qabu

Lakk. Gosa meeshaa Safartuu Baayina Gatii Gatii Ibsa

tokkoo Hundaa

1 Akkaffaa lakk 10 95 950

2 Dommaa lakk 8 80 640

3 Metiraa metr 300 1 50 450

4 Paneelii Lakk 20 650 1,300

5 Iskodiraa Lakk 2 280 560

6 Tubbii Lakk 2 260 520

7 Madoshaa Anatsii Lakk 2 200 400

8 Madoshaa abbaa 5 killo Lakk 1 600 600

9 Madoshaa abbaa 3killo Lakk 1 450 450

46
10 Mankaa Ginbeenyaa Lakk 4 40 160

11 Vaybiretara yeroo 1 50 50

Dimishaasha 6,080

Waldaa (Interpraayiziichi) meeshaa ijarsaa bituuf


karoorfate.
Lakk. Gosa meeshaa fi Bara bitaa Safartuu Baayina Gatii tokkoo Gatii Hundaa Ibsa
8 Akaffa Lakk 15 95 1,425
9 Domma Lakk 15 80 1,200
10 Gasso Lakk 10 60 600
11 Metiraa Metr 700 1 50 1,050
13 Tubbii Lakk 3 280 840
15 Magaazii Lakk 5 150 750
16 Madoshaa Anatsii Lakk 3 200 600
17 Madoshaa abbaa 5killo Lakk 1 600 600
18 Madoshaa abbaa 3killo Lakk 2 450 900
19 Mankaa Ginbeenyaa Lakk 6 40 240
21 Dirilli Lakk 1 4000 4000

Dimishaasha 12,205

Meeshaa waldaa hojjichaafBarbaachisu

47
(Direct material costs)
Lakk. Gosa meeshaa Gatii Hundaa Ibsa
1 Simnittoo(cement) 420 60 25,200
2 Sibilaa(Steel bar) 95m2 1200 114,000
3 Froomorkii mukaa 50m2 60 3000
5 Dhagaa ijarsaa 14,4 1400 20,160.
6 Ashawwaa 16m3 437.5 14,000
7 Xaaxarrii 16m3 625 10,000
8 Biyyoo dimmaa(for back filling) 13m3 13 169
10 Misimarra 50 65 3250

Dimshaasha 189,779

1,Karoora humna nama dhabidhaan Barbaachisaan


(waldaa kessa)
Lakk Maqaa Miseensetaa Dandeettii fi Gahee Kaffaltii
. Muuxannoo hojiif
Hojii Baasii Kallattii ta’e
Barbaachisu
Kan ji’aa Kan Waggaa
1 Fayisaa Guddisaa Geology (BSC) Site forman 3500 42,000
2 Qananii asfewu Survey Injineera surveyer 3500 42,000
(BSC)
3 kenboni alemu Injineera,civil Site Engineer 4,000 48,000
Injineera (BSC)
4 sukare utura Road constraction Purchaser 3500 42,000
(level IV)
5 Genet Roba Management Site manager 3,500 42,000
(BSC)
6 Gudata dhekamaa Economics (BSC) Accountant 3,500 42,000

Baasii Kallatti 21,500 258,000 


Dimshaashan

48
2,Karoora humna nama yeroodhaaf barbaachisaan

Lakk Maqaa Dandeettii fi Gahee Kaffaltii


. Muuxannoo hojiif
Hojii Baasii Kallattii ta’e
Barbaachisu
Kan ji’aa Kan Waggaa
1 Toleeraa sisay Kutaa 8ffaa Hojjata dhagaa 2400 120,000
2 Sixota Abarra Masonary and Site forman 2100 96,000
concerete work level
ii
3 Caaltuu Qalaamu Kutaa 10ffa Qopheesitu 1800 120,000
bishaani
4 Ayyalach Abarra Kuta 10ffaa Hojjatootaf haala 1800 120,000
qophesitu
5 Tigist Bayyana Level IV Akkawunti Bitta fi gurgurta 1800 90,000
irratti
6 Seefu Qalamuu Level III sueveying Surveyer 3000 90,000
7 Kokobye Wandimuu Kuta 12ffa Meeshalee 1800 96,000
qoophesituu
Gati dimshashaasha 14,700

Lakk Maqaa Dandeettii fi Gahee Kaffaltii


. Muuxannoo hojiif
Hojii Baasii Kallattii ta’e
Barbaachisu
Kan ji’aa Kan Waggaa
1 Firesalam Masfiin Barattu galgala Hojjatu guyya 1500 120,000
2 Getahun Alamayew Masonary and Hojaata guyya 2100 96,000
concerete work level
iv
3 Zawudu Lencho Kuta afur Hojji dhagaa 1500 120,000

49
4 Habtamu Wandimuu Kuta 10 ffa Hojji muka 750 120,000
5 Gosa Lamma Kutaa 12fa Hojji dhagaa 700 90,000
(masonary)
kafalti guyyaan
ala
6 Margaa Balayineh Level III sueveying Surveyer 1500 90,000
Wali gala 8,050

 Hubachisaa waldaan kafalti kan rawwatu yoo hojji kessa seene qofa.

karoora baasi kan piroojekticha

Maqaa Waldaa; Waldaa dhuunfaa moneti ijarsaa dandii fi riqichaa (plc)

Bara 2012
Dimshaasha baasii Baayina Qarshii
Baasi kira mana kan ji,a tokko 3,000
Baasii bitta meshaalee hojjichaf barbaachisaan(waldaan bitatuuf karoorfate) 179,705
Baasii Meeshaalee waldaan bitatee qabu 6,080
- Baasii waldaan meeshaa kireefatuuf karoorfate 5800
- Baasii karoora human namaa dhaabidhaan kafalamu 58,500

- Baasii karoora human namaa yeroodhaaf barbaachisan 14,700


- Galii gibiraa 11,000
- Baasii walii gala 278,285

-HUBACHIISA-Baasiin kamuu akkaataa galii waldichaa irratti kan hundaayu ta’a.

50
Galii waldaan tilmaaman irra argatuu dandaa,u.

Maqaa Waldaa –Waldaa dhunfaa monetii ijarsa sandi fi riqichaa(plc).

Bara 2012
Dimshaasha galii Baayina Qarshii
Galii waligaltee mana qophessa irra argamuu(gatii piroojaaktichaa) 340,266.4
Galii gurggurta muka fayyadamne irra argamu 6000
Galii dimshaasha 346,266.4

Bu,aan baasii fi gali irra argamu malu

 Galii Tilmamaan Argamu malu 346,266.4-278,285=67,981.4

Kuniis waldaan keenya piroojeektii irra bu,aan irra argatu malu

kunis parsaantiidhaan yoo ibsaamu67,981.4/346,266.4= 19.6% dha

Lak Maqaa Miseensotaa Saala umrii Ebbifamtoota .Yaada


1 Fayisaa Guddisaa Dhi 26 University .
2 Dararaa liben Dhi 26 UNIVERSITY
Gudata dhekamaa Du 28 University .
4 sukare uturaa Du 25 BLTO
kenboni alemu Dhi 24 University .
Genet Roba Du 23 university .

51
Qananii asfewu Dhi 25 university

3.2. Ga’uumsaa akka waldaattii MGO darbee


Lak Maqaa Miseensoottaa Saala umrii Ebbifamtoota COC
1 Fayisaa Guddisaa Dhi 26 University Ni qaba
Dararaa liben Dh 2 UNIVERSITY Ni
sukare utura Du 23 BLTO Ni
kenboni alemu Dhi 2 University Ni
5 Genet Roba Du 24 University
Gudataa dhekamaa Dhi 23 university Ni qaba
Qananii asfewu Dhi 25 University ni qaba

3.3. Ga’uumsaa akka waldaatti MGO darbee


Miseensoni waldaayicha hundinuu coc kan darban waan ta’ef, akka waldaaatti waldaan keenyaa
MGO darbee jiraa.

3.4. CV ogessa adda barbaadamu qaban


Lak Maqaa Miseensoottaa Saala
Feyisa Gudisa Dhi 26 University
2 Dararaa liben Dh 26 University
Sukare utura Du 23 Universit
kenboni alemu Dhi 25 BLTO
Genet Roba Du 24 UNIVERSITY
6 Gudata dhekamaa Dhi 23 University
Qananii asfewu Dhi 25

3.5. Beekkumsa projaktii fi qophaa’ummaa qaban


 Injinara ijaarsaatiin digrii fi Leevelii of keessaa qabaachuu.

52
 Miseensonni digirri korsii shaakalaa (internship) akkasuumaas ogummaa muuxannoo
ykn beekkumsa projaktii kan qabanis ni jiruu.
 Fedhii isaanitin waldaa ijaarsaa irrati gurmaa’uun qopha’ummaa waldichaa ibsa.

3.6. Toftaan yeroo qusatu fi qulqullinna Eeguuf


 Sagantaa karooraa qopha’ane seeran itti fayadamu.
 Human namaa hammati ga’umsan gutuu.
 Yeroo hojii kabajun hojachuu.
 Ogeessa gahumsa qabuu qaxaruu.
 To’annoo fi hordofii haala karorfameen rawachu.
 Ispesifikashiini fi dizayinii qopha’ee eeguun hojjachuu.
 Meshaalee ijaarsaa qulqilluu ta’anitti fayyadamu

3.7. Toftaan gatii qusatu fi bu’aa dabalatuuf qaban


 Yeroo hojii kabajun hajachuu.
 Ispesifikashiini fi dizayinii qopha’ee eguun yeroo waligaltee duraa fixuu yaluu.w
 Ogeessa gahumsa qabuu qaxaruu.

4.7.1 Muuxanno Raawwi Dabree fi Gahumsa Hanga ammaa qaban


Waldaan kun haala reformii haarawaatiin kan gurmaa’e waan ta’ef, muxxannoo waldaa asin
duraa hin qabu, garuu miseensonni waldaa kana kessatti hammataman ga’uumsa isaanii
waldaa duraa keessatti hojataa wan turaniif ogummaa muuxannoo ni gabani.

5. Walitti Hidhaminsa gabaa


Waldaan kun erga hundeefame asi dorgommii (calbassii) hojii ijaarsa isa duraa. Ha ta,uu malee
gaafa hojii sennef jedhame waldaa ABDI,HILINA fi hiriyoota gurgurtaa meesha ijaarsa wajiin
kan walitti hidhaminsa kan qabu fi akkasumas waldaan keenya kannen waldaa biro wajiin yaada
hidhaminsaa gabayaa akka qabus ibsu jaalana.

53
4. Leenjii hubannoo gaggabaaboo fi TEI fudhachuu
4.1. Miseensi hundi leenjii hubannaa fudhachuu
Lak Maqaa Miseensoottaa saala umrii Ebbifamtoota Leenji hubanno
1 Fayisaa Guddisaa Dhi 26 University
Dararaa liben Dhi 26 Universi Fudhate
3 Gudata dhekamaa Dhi 28 University Fudhate
sukare utura Du 23 BLTO Fudhate
5 kenboni alemu Dhi 24 University Fudhate
6 Genet Roba Du 23 University Fudhatte
Qananii asfewu Dhi 25 university fudhatee

Leenjii gaggabaabo fudhachu


Lak Maqaa Miseensoottaa saala umrii Ebbifamtoota Leenjii kaayizanii
1. Fayisaa Guddisaa Dhi 26 University Fudhate
2 Dararaa liben Dhi 26 university fudhate
Gudata dhekamaa Dhi 28 University Fudhate
4 sukare utura Dhi 23 BLTO Fudhate
5 kenboni alemu Dhi 24 University Fudhate
6 Genet Roba Du 23 University Fudhatte
Qananii asfewu Dhi 25 university fudhate

La Maqaa saala umr Ebbifamtoot Leenji hubanno


k Miseensoottaa ii a
1 Fayisaa Guddisaa Dhi 26 University Fudhate
2 Dararaa liben Dhi 26 University Fudhate
3 Gudata dhekamaa Dhi 28 University Fudhate
4 sukare utura Dub 25 BLTO Fudhate
5 kenboni alemu Dhi 24 University Fudhate
6 Genet Roba Du 23 University Fudhatte

Dhi 25 university fudhate 7

54
Qanani asfewu

4.2. Leenjii qabannaa herregaa fudhaten hojjatuu


Sochii basii fi galii dhaabbaticha hala leenjii gaggababaa argannee itti fayyadamuun herrega
keenya galmessaa jirra. Nagahee basii fi galii seeraattii fayyadamaa jirra. . Akkasumas waraqaa
ragaale leenji hubanno herega kan fudhates jira.

4.3. Baazaarii fi Egzibishinii hirmaachuu


Agarsiifni Daldalaa fi Baazaarii bakka oomishtootni (producers) oomisha (product) ofii
isaaniitiin oomishan karaa bakka bu’ootni isaanii maamiltootatti beeksisuun maamila haaraa
itti horatanii fi oomishni fooyya’ee ykn haaraan qulqullina qabu fayyadamtoota gabaa bira
ittiin ga’uufi itti daawwatamudha. Hojiin kun sochii investmentii magaalota dabaluufi
cimsuu keessatti shoora guddaa taphata.

Keessumaa dhaabbileen IMX muuxannoo oomishtoota fi daldaloota buuleyyii irraa


muuxannoo gaarii (Best Practices) horachuun hojii Manifacheringii adda addaa keessatti
qooda fudhachuun qabeenyaa hedduu horatanii jiru.

4.4. Teechnolojii fi kaayizani fayyadamuu


 Meshaale elektroniksii kan akka kompitaraa sanada calbaasii qophessuf ni
fayadamnaa.
 Yeroo fi meshaale ijaarsaa qusannoon ittin fayadamu.
 Harcaatii fi fashala’uu meshaa hir’issun fayadamuu.
 Akkasumas miseensi waldaas lenjii kan fudhatee jira

Lak Maqaa Miseensoottaa saala umrii Ebbifamtoota Leenjii kaayizanii


1 Fayisaa Guddisaa Dhi 26 University Fudhate
2 Darara liben Dhi 26 University Fudhate
3 Gudata dhekama Dhi 25 University Fudhate
4 sukare utura Dub 25 BLTO Fudhate
5 kenbon alemu Dhi 24 University Fudhate
6 genet Roba Du 23 University Fudhatte
Dhi 25 university fudhate

55
Qananii asfewu

56
TECHNICAL
DOCUMENTS ORIGINAL

SUB.DATE: - NOV-11-2021

SUBJECT OF PROCUREMENT: - ADOLA WOYU

PROCUREMENT REFERENCE NO:ADOLA/UIIDP/W-012/2014

PROJECT NAME: - CONSTRUCTION OF SLAB CULVERT AROUND ROBE BARAKO


RESIDENCE LOT-1

PROJECT SITE: - AROUND ATO ROBE BARAKO RESIDENCE

CLITENT: -ADOLA WOYU CITY ADMINISTRATION

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

CONTRACTOR NAME: MONET ROAD CONSTRUCTION PLC

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

PHONE NUMBER: - +251991082546/+251926908044

WARNING: - Not to be opened before the time and date for bid opening.

57
TECHNICAL
DOCUMENTS COPY

SUB.DATE: - NOV-11-2021

SUBJECT OF PROCUREMENT: - ADOLA WOYU

PROCUREMENT REFERENCE NO:ADOLA/UIIDP/W-012/2014

PROJECT NAME: - CONSTRUCTION OF SLAB CULVERT AROUND ROBE BARAKO


RESIDENCE LOT-1

PROJECT SITE: - AROUND ATO ROBE BARAKO RESIDENCE

CLITENT: -ADOLA WOYU CITY ADMINISTRATION

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

CONTRACTOR NAME: MONET ROAD CONSTRUCTION PLC

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

PHONE NUMBER: - +251991082546/+251926908044

WARNING: - Not to be opened before the time and date for bid opening.

58
LEGAL
DOCUMENTS

SUB.DATE: - NOV-11-2021

SUBJECT OF PROCUREMENT: - ADOLA WOYU

PROCUREMENT REFERENCE NO:ADOLA/UIIDP/W-012/2014

PROJECT NAME: - CONSTRUCTION OF SLAB CULVERT AROUND ROBE BARAKO


RESIDENCE LOT-1

PROJECT SITE: - AROUND ATO ROBE BARAKO RESIDENCE

CLITENT: -ADOLA WOYU CITY ADMINISTRATION

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

CONTRACTOR NAME: MONET ROAD CONSTRUCTION PLC

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

PHONE NUMBER: - +251991082546/+251926908044

WARNING: - Not to be opened before the time and date for bid opening.

59
MOTHER
DOCUMENT

SUB.DATE: - NOV-11-2021

SUBJECT OF PROCUREMENT: - ADOLA WOYU

PROCUREMENT REFERENCE NO:ADOLA/UIIDP/W-012/2014

PROJECT NAME: - CONSTRUCTION OF SLAB CULVERT AROUND ROBE BARAKO


RESIDENCE LOT-1

PROJECT SITE: - AROUND ATO ROBE BARAKO RESIDENCE

CLITENT: -ADOLA WOYU CITY ADMINISTRATION

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

CONTRACTOR NAME: MONET ROAD CONSTRUCTION PLC

ADDRESS: - ADOLA WOYU,OROMIA, ETHIOPIA

PHONE NUMBER: - +251991082546/+251926908044

WARNING: - Not to be opened before the time and date for bid opening.

60

You might also like