Testing and Commissioning

The document provides a testing and commissioning certificate for a coffee machine installed at the Sheraton Manila Hotel. It details a pre-functional checklist with 19 items to check that the equipment was properly installed, connected to utilities, and functioning correctly. The checklist was completed and signed off by representatives of the installing contractor, owner, and witnessing third party to confirm the coffee machine was properly tested and commissioned.

Uploaded by

Raz Lucci
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Testing and Commissioning

The document provides a testing and commissioning certificate for a coffee machine installed at the Sheraton Manila Hotel. It details a pre-functional checklist with 19 items to check that the equipment was properly installed, connected to utilities, and functioning correctly. The checklist was completed and signed off by representatives of the installing contractor, owner, and witnessing third party to confirm the coffee machine was properly tested and commissioned.

Uploaded by

Raz Lucci
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

TESTING AND COMMISSIONING CERTIFICATE

KITCHEN EQUIPMENT SYSTEM


Site: 100 Andrews Ave, Pasay, 1309 Metro Manila Location : 2ND FLOOR
Project: Area Served : COLLAB COFFEE BAR
Item No : SC-SB-005
SHERATON MANILA HOTEL Description : COFFEE MACHINE
Brand : WMF

GENERAL KITCHEN EQUIPMENT PRE-FUNCTIONAL CHECKLIST


CONFORM
ITEM NO. DESCRIPTION COMMENTS
YES NO
Check if there is no apparent damage on the equipment being
1
installed.
Check the model and equipment designation based on plants and
2
equipment list.

3 Verify the equipment set level to guarantee the proper guarantee.

4 Check if the equipment fits suitably into thte allotted space.

Ensure if the field assembled components and equipment are


5
installed properly accordance with approved drawings.

6 All water ball valves are installed correctly.

7 Check the required code clearance for maintenance.

Confirm the installation in accordance with the manufacturer's


8
recommendations, equipment specifications and details.

9 All condensate drains are installed properly.

Power source checkout has been completed and energized by


10
electrical contractor.

11 Power wiring installed properly and all connections are tight.

12 Proper grounding installed for all components and equipment.

13 Power disconnections are in place and properly labeled.

14 Check the electrical switch properly.

15 Check if the gas safety valve works properly.

16 Check for leaks on refrigeration piping.

17 Flushing of refrigeration piping.

18 Check the temperature required on imported equipment.

19 Check if the equipment is working properly.

Legend: Yes/No N/A Not Applicable

Test carried out by:


FABTECH EXPORT INDUSTRIES, INC. SIGNATURE DATE

Test noted by:


EELHI SIGNATURE DATE

Test witnessed and


validated by: FORSSPAC SIGNATURE DATE

Remarks: