You are on page 1of 21

Hindi CONTENTS

Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC coaches)

CHAPTER 7

TRAIN LIGHTING AND MAINTENANCE SCHEDULES OF


NON AC COACHES

701 INTRODUCTION
Depending upon the train lighting
The following systems of Train Lighting systems, the coaches are of following
are in use on Indian Railways BG types.
coaching stock:
In this chapter the train lighting system
1. End On Generation (EOG) of Non AC and AC SG coaches will
be discussed.
2. Self Generation (SG)
3. Mid On Generation (MOG)

BG COACHES

Self Generating Mid On Generation


End On Generation
(SG) Coaches (MOG) Coaches
(EOG) AC Coaches

Split type Roof Mounted AC Non- AC


Under Package Unit Coaches Coaches
slung (RMPU)

Split type RMPU with 25


Under Slung KVA inv erter

Chapter 7, Page 1 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

702 GENERAL DESCRIPTION OF during journey from minimum speed


MAJOR EQUIPMENT for full output (MFO) to maximum
speed. The alternator is used for:
702a BRUSH LESS ALTERNATORS
i. Charging the coach batteries.
Brushless alternators are axle driven,
with ‘V’ belt drive, mounted on the ii. To meet electrical load i.e. fans, lights,
bogies of the AC & TL coaches. These air conditioning, water-raising
alternators are of various ratings and apparatus (WRA) etc. in the coach.
make as per requirement for different
type of coaches. They are being 4.5 kW brush-less alternator
procured as per following RDSO’s are driven by 4 Nos. of C122 matched
specifications: - sets of ‘V’belt coupled between the
axle and the alternator pulley. The axle
Specification No. Ratings pulley is of 572.6 mm PCD (pitch
circle dia.) and alternator pulley is of
EL/TL/47 Rev 'C' 4.5 kW, 37.5A, 120 V
200 mm PCD. Belts are kept under
with amdt no.1,2,3 DC tension by a spring-loaded belt-
used on non AC tensioning device.
coaches.
EL/TL/54 Rev 'A' 18 kW, 138.5A, 130 V 18kW/ 22.75kW/ 25kW
DC alternators are fitted with 12 Nos. of
with amdt no.1,2,3 deep V-grooved pulleys of 200 mm
used on SG AC PCD with six grooves on each side of
coaches. the shaft, which is driven by V-belt in
(Split type underslung) conjunction with an axle pulley.
ELPS/SPEC/TL/01, Optimized 22.75
Dec. 1993 kW/25kW, 702b RECTIFIER-CUM-REGULATOR
UNIT (RRU)
with amdt no. 1 & 2 175A/ 193A, 130V
DC, used on AC The rectifier cum regulator unit has
coaches of SG type mainly following functions:

4.5 kW Brush less alternators are used i To rectify the 3 phase AC output of
on Non AC BG Coaches. It consists of the alternator through DC full
a three-phase hetropolar inductor type wave bridge rectifier.
Alternator and a static Rectifier-Cum- ii Regulating the voltage generated by
Regulator Unit (RRU).
the alternator at the set value.
Earlier AC coaches provided iii Regulating the output current.
with under slung split type AC units
were fitted with two nos. of 18 kW Recently electronic rectifier cum
brush less alternators. After the regulator (ERRU) confirming to
development of roof mounted AC units RDSO specification
(RMPU) and 25 KVA inverters, 22.75 No.RDSO/PE/SPEC/D/AC/0013
kW (Optimized) brush less alternator (Rev.0), developed, which has
was developed within the same frame been fitted on a very few coaches
size of 18 kW alternator. Subsequently on trial.
25 KW alternator with new design was
developed for 2 tier and 3 tier AC 702c BATTERIES
sleeper coaches with RMPU and 25
kVA inverters and for AC 1s t class one The following types of batteries are
25 kW alternator with 25 kVA inverter provided on under -frame of AC & non
provided. AC Self Generating type and End On
Generation type coaches.
The brushless Alternator with
the help of static rectifier cum regulator i. 6V/120 Ah flooded type (Mono
unit is capable of developing voltage at block cells) on Non AC BG SG
the set value to meet the coach load coaches.
Chapter 7, Page 2 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

ii. 2V/120 Ah , VRLA cells on Non battery box is painted with anti-
AC BG SG (Self Generating) corrosive paint.
coaches.
iii. 2V,1100 Ah 56 cells VRLA 110 V While mounting the battery
SG AC coaches fitted with RMPUs box in underframe of the coaches,
and 25 kVA Inverter special care is taken to provide
locking nuts and split pins to avoid
iv. 2 V, 800 Ah flooded type cells on any accidental falling of batteries
under -slung mounted split type AC while running.
equipment .
v. 90/120 Ah, 24V on EOG (End- Recently both the Production
On-Generation) type AC coaches Units have been instructed to provide
(Emergency batteries for lighting ) battery boxes as per RDSO drg. No.
RDSO/SK/K/0037, which is suitable
The 2V,120 Ah TL batteries are for both makes of VRLA batteries i.e.
used in conjunction with brushless M/S Exide and M/S Amar Raja. The
alternator with suitable Rectifier-cum battery box is having improved safety
Regulator of 4.5 kW capacity for train factor coup led with flexibility to
lighting system of TL BG SG type accommodate both makes of VRLA
coaches. The 2V, 56 cells 800 Ah / 2V, batteries.
56 cells 1100 Ah VRLA batteries are
used in conjunction with brushless 702e BCT (Battery Charging Terminals)
alternator with Rectifier -cum Regulator
unit of 18/22.75/25 kW capacity for AC BCT is provided at the both
coaches. 1100 Ah batteries are used on sides of the coaches for external
AC coaches equipped with the Roof charging of the batteries at stations of
Mounted Package type AC plants. 1100 maintenance lines .
Ah capacity battary are of the valve
regulated lead acid (VRLA) type which 702f RJB (Rotary Junction Box)
has its inherent advantages like :
Rotary Junction Box is
provided inside the coach. It is used to
• Topping up with water is not
arrange and control the power supply to
required.
various circuit of the coach (e.g. light,
• Periodical checking of specific fan) with the help of rotary switches
gravity is not required. and HRC fuses.
• Regular maintenance to avoid
sulphation of terminals and 702g EFT (Emergency Feed Terminals)
connections not required.
It is provided at the both ends
of the coach to feed the additional
The VRLA batteries are also known as
supply to the adjacent coach in case of
Sealed Maintenance Free (SMF)
emergency. Supply from the healthy
batteries.
coach may be extended to him/dark
coach by connecting supply to the
702d BATTERY BOX
positive and negative terminals of the
EFT.
ICF type design battery box
for AC coaches is a fabricated
702h TL Lamps
framework made of mild steel
confirming to drg. No. WGFAC-7-1-
25 and 40 Watt lamps are
026. Whereas RCF design is of closed
provided in the non AC coaches. The
type confirming to drg. No. CC71448
power supply is at 110 Volt DC. 25
(PP side) & CC71451 (NPP side), It is
Watt lamps are used in corridor, light
suspended on coach in the under
lamp, wash-basin, toilet. 40 W lamps
frame and is provided with front
are used for lights in the coach.
opening doors for paying attention to
batteries. FRP trays are provided to
prevent corrosion. The interior of the

Chapter 7, Page 3 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

702i FTL (Fluorescent Tube Light) as per platform report. Proceed as


follows:-
It is a 2 feet long, 20 watt
fluorescent tube light provided in the n Check field fuse, replace if found
coach for the light. It works at 110 V blown, with approved makes i.e.,
DC supply. It gives better illumination S&S or English Electric make.
and is being provided in the coaches in
place of TL lamps. n Check the continuity of field and
phase winding with the help of test
702j Carriage Fans lamp/ multi-meter to ensure that
windings are not open circuited.
On non AC BG coaches 400
mm sweep carriage fans are used where n Check for loss of residual
system voltage is 110 DC. These fans magnetism with the help of
are fixed type and confirm to IS : 6680- voltmeter across the field
92 with latest annexure 'H' for deviation terminals. In case of loss of
to IS 6680-92. magnetism, give 12 V DC flashing
to the field terminals for few
703 TRIP SCHEDULE seconds to regain lost residual
(PRIMARY & SECONDARY magnetism.
MAINTENANCE)
n Check that the regulator feedback
703a ATTENTION ON MAINTENANCE loop is O.K.
LINES
n Check connections for tightness in
As soon as the rake is berthed alternator and rectifier regulator. If
in the maintenance lines and before this is all right, remove belt from
commencing the work, a caution board alternator.
shall be clamped to the rail on either
side of the rake by TXR or his n Use testing machine for testing
representative. Rail locks shall be used alternator in situation. Couple the
on either side of the rake for the safety portable motor drive with
of maintenance staff attending under Alternator.
gear equipment. TXR should ensure
clearance from electrical n Check the DC output voltage at the
Chargemen/staff incharge for the rectifier and regulator terminals.
maintenance of rack before removing Identify the defects if any and
the caution board and rail locks. rectify them. The battery should
be isolated while doing this test.
To avoid any malfunctioning
of the above system, print ed forms for n Provide new split pin for pulley
permit to work on pit lines issued by castle nut after completion of work.
the traffic department and after
completion of the work, completed / n Check up the condition of safety
men withdrawn form can be used. chain and availability of split pins
in safety chain bolts.
Check the plate-form
attention report and concentrate first on n Check up alternator suspension
attending the defects in these coaches bracket and tension gear for any
by adapting systematic trouble shooting damage and replace, if necessary.
procedures. Proceed as follows in
respect of other equipment. n Check up and tighten loose bolts in
terminals box covers.
703b ALTERNATOR
n Check availability of split pin for
First attend alternators in alternator castle nut.
coaches for generation, which have
arrived "cold" and coach dark condition n Check the belt tension after every
round trip of the coach.

Chapter 7, Page 4 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n For new V-belt fitted, the belt meter as per recommendations of


should be re-tightened after V belt manufacturers.
completing the first trip.
n Check that all the sets of belts
n Check the tension indicator pin at provided should be of same make
suspension point after every round & grade.
trip for flat belt drive alternator.
703e RECTIFIER CUM REGULATOR
n Never energize field from battery
in case of failure of field circuit n Clean regulator externally. Open
diode in regulator. Apart from non regulator terminal cover and check
regulation, this may cause for signs of overheating in all the
permanent damage to field terminals/bus bars/etc. Check up
windings. for loose connections and tighten
the same. If the terminal board is
n If there is no generation, ensure found affected due to heat, replace
that there is no breakage in the terminal board with new one.
cable termination.
n Check for any damage to the phase
and field wires /cables inter
703c AXLE PULLEY connecting regulator and alternator
and its anchoring arrangement.
n Examine the indicating white mark
n Check and secure properly the
on the pulley axle and ensure that
terminal cover and regulator cover.
the pulley has not slipped. If pulley
has slipped, take necessary n If the generator is normal, check
corrective action. the cable termination of the
regulator visually for any
n Tap the pulley with hammer and abnormality.
judge the tightness or crack by
n If the alternator arrived without
sound. If it gives clean metallic
generation, open the regulator and
sound the pulley is tight. Dull
sound indicates that it is loose. Bolt check for any abnormality and
ensure the fuses are intact.
should be tightened with torque
wrench to 30 kgm. n Check the cable for any
abnormality from the alternator to
n Check the lock nuts and split pins the regulator by using test lamp, if
for availability and tightness. found open/short attend the same.

703d BELTS n Ensure the residual magnetism is


available in the alternator.
n Check condition of belt for fraying n If needed change the regulator and
of edges, etc., ensure the generator by running the
alternator with a portable motor.
n Check the belts for overturn and
correct it, if necessary. NOTE : Components : Components of RRU
such as MA, ET, CT, OVR etc., and
n Check the number of belts which electronic components such as power
should be 4 nos. for 4.5 kW diode, field diodes, zener diodes,
alternator. auxiliary diaode etc., shall be
procured only from OEM.
n Tension should be felt by hand by
striking it slightly. Belt in correct Maintenance of alternator/RRU has
tension will respond `alive' and to be done in line with SMIs issued
`spring-back'. If required by RDSO as well as Manufacturer's
retensioning, the same shall be recommendations.
retensioned to the recommended
values as applicable. This can also
be checked using a suitable tension

Chapter 7, Page 5 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

703f BATTERIES/BATTERY BOX n Coaches with discharged batteries


which shows less than 100 V on
i. Conventional Lead Acid load should be put on charge at
Batteries double the normal rate of charge
and the charging reduced to half
n To know the condition of cells the rate of charge as soon as the
during `Trip Examination' some gassing starts and continued till
cells in a battery are treated as the specific gravity rises to the
`pilot' cells. On arrival of train in fully charged value which should
the maintenance line, disconnect be between 1210 and 1220. Use
all inter vehicle connections. the battery charging terminals
Record the specific gravity of provided in coaches for charging
`pilot' cells in each battery. purpose. Check up correct polarity
Different cells should be identified and connect the charging cables.
as pilot cells every month. The idea Use a clip on D.C. ammeter of 0-
of identifying different cells as 25 A range to check up the battery
pilot cells every month is to ensure charging current. Note down the
that true condition of the battery is rate of charging and the number of
reflected. hours of charge.

In case of conventional coaches n Check specific gravity of pilot cells


working on 110 V D.C. system and the total voltage of battery on
there are two crates with 9 mono load at the end of charge and
block batteries in each battery box. record.
Marking of these cells to indicate
pilot cells shall be done as follows. n Keep micro porous vent plug tight.
Ensure that washer is available in
Table 7.1 micro porous vent plugs.

1 2 3 4 5 6 7 8 9 n Check all the battery box members


10 11 12 13 14 15 16 17 18 for any cracks in the fabricated
battery box/cradle and take
Table 7.2 corrective action.

Month Pilot Cells n Check for proper fit ment of mono


1st Month 1, 12, 13 block in the battery box ensuring
2nd Month 2, 11, 14 wooden packing pieces.
3rd Month 3, 10, 15
4th Month 4, 9, 16 n The person in charge of battery
5th Month 5, 8, 17 maintenance should record all the
6th Month 6, 7, 18 readings mentioned above in his
diary and this information should
Repeat cycle further. be transferred to the register
maintained for various trains.
Check the floats of each cell
and check for correct electrolyte level n Check anti-theft rods and provision
as indicated in the float stem. Replace of nuts both inside and outside the
missing/defective floats. In case of battery box on either side. Provide
low level, replenish with distill water. If if found missing. Secure battery
any cell needs too much water for box cover finally after all works
replenishing, watch for crack in the are completed.
cells and also check the voltage on load n Ensure that the fitment of the
which should not be less than 1.80 V. battery box is in order with all the
In case of any defect, remove the cell bolts, nuts, lock nuts, split pins etc.
and replace by a spare one preferably are in order.
of the same make and lug date or a lug
date as close to the one already in the n Ensure the weldings are proper
coach. and the bottom plate of the box is
well secured.
Chapter 7, Page 6 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Ensure the cells are properly 703h FANS


cleaned.
Following scheme is prescribed for all
n Ensure the water level in all the
trains during primary or secondary
cells/mono block is upto the mark
maintenance at a depot:-
and top up the cells with distilled
water wherever required. n Switch on each fan individually.
n Ensure all micro porous vent plugs Check starting of fan when
and sealed floats guide are properly switched on. In upper class
closed. coaches, check fan for starting in
the lowest position of regulator and
n Check the sp. Gravity of the cells if
also for variation of speed in the
it is less than 1200, the battery other regulator positions. If the fan
shall be connected on charge.
does not start, short the switch
n Measure the load voltage of the terminals with a small piece of
cells/mono block if it less than 100 wire temporarily. If the fan starts
V, identify the low voltage cell and this will indicate that the
replace if needed. controlling tumbler
switch/regulator is defective.
n Check the terminations in the fuse Replace defective switch/regulator.
and the condition of the fuse.
n Check the termination of cable in n If the fan does not start when the
the under frame link box, for toggle switch terminals are
proper condition and attend if shorted, proceed as follows:
needed.
♦ Test for supply at the 2-way
ii. VRLA Batteries : connector terminals near the
fan with the tumbler switch
SMI no.RDSO/PE/TL/SMI/0001 - on. If there is no supply, the
98 (Rev.0) dt. 01.06.98 to be wiring is defective and has to
followed. be attended.

703g EARTH CHECKING ♦ Open dome cover in case of


swiveling fans and remove fan
Before checking the earth in
body fixing screws in case of
the coach, it should ensure that coach is
fixed fans.
not connected to the adjacent coach
through EFT (Emergency Feed
♦ Remove carbon brushes.
Terminal). After isolating the coach the
Check brushes for condemning
earth shall be tested by using a double
size, proper bedding, correct
test lamp as explained in the RDSO
spring tension and correct
code of practice of 110 V coaches. If
grade of brush.
any earth is noticed the required
corrective measures should be taken to
♦ Check for free movement of
remove the earth before inducting the
brush in the brush holder.
coach in the service. No coach shall be
Replace defective brushes/
allowed for service with +ve earth.
springs.
However incase of –ve earth this can be
allowed for maximum one trip that too
with properly marking as –ve earthed. ♦ If the commutator is dirty,
clean the surface with sand
Record all the attention given paper of 0/0 size.
in the under frame and roof, the
Specific Gravity, the condition of ♦ If the commutator surface is
generation, lamps, fans and fuses, grooved or the segments are
availability of belts etc. with coach and found pitted in one or more
other details. locations, replace the fan by an
overhauled fan. The defective
fan can thereafter be rectified
by replacing the defective
Chapter 7, Page 7 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

armature by a good one. If repeated large scale deficiencies of


spare armature is not available foreign Railway's coaches. The
send defective fan to shop for Depot/Railway entrusted with
attention. primary maintenance shall be
advised by message whenever the
♦ If the fan is noisy, check for deficiency is made good or when
loose blades/fan guards and large scale deficiencies are noted
tighten them. If the noise is on arrival.
due to bearings, replace the 703i LIGHTING
fan and send defective fan to
shop for replacing. n Switch on each lamp/tube light. If
the lamp/tube light does not glow,
n Check the fuse for fans and ensure check lamp/tube light and
that it is of correct size (35 SWG) replace, if fused. If the lamp is all
tinned copper. right, check control fuse and
replace, if found blown.
n Clean fan body and its guard.
n If the fuse is all right, check control
n In swiveling and bracket fans switch and replace, if necessary.
ensure that the fan dust cover is If the switch is all right, check up
promptly replaced after attention lamp holder for stuck up plunger
and also that the nylon cord or loose connection and rectify
provided to prevent loss of fan defect. If there is no defect in the
dust cover, is available in position . lamp holder, check up for supply at
the holder terminals and if the
n The MCB/fuse controlling the fan wiring is found defective, mark the
circuit shall be checked for correct coach "Sick" and arrange for
rating (16A for non AC SG attention in maintenance lines.
coaches and 6 A for SG AC
coaches and proper functioning and n Note down the coach number, total
replace if found defective. number of lights in each coach and
the number of defective/missing
n Note down the total number of fans lights on arrival.
in each coach and the number of
fans found defective. Defective n Provide switch covers and fuse
fans shall include fans, which covers promptly, if they are
required push start. The aim is to missing.
achieve cent percent working of
fans. The records mentioned above n If any dome cover is open or not
will help in working out the extent secured properly, rectify defect, if
of the problem in any particular any and secure.
service to take quick remedial
action. n Replace broken glass
domes/acrylic covers of tubelights.
n The fans shall be available as per
lay out for the coaches. In case it is n In case of berth lights in first class
necessary to remove any fan for and AC coaches, check up for free
attending to major defects and no movement of shutters. Replace, if
spare fan is available a ‘Deficiency found defective.
Label’ shall be affixed near the fan
point. In case no deficiency Label n Clean side lamp glasses and red
is available. Theft Memo shall be shield inside the lamp in SLRs.
issued to the security branch. Check up for free movement of
operating handle and drop same
n Deficiency of fans shall be lubricating oil, if necessary. Clean
promptly made good when noted tail lamp glass and the reflecting
by any depot irrespective of surface inside.
whether the train is primarily
maintained or not except in case of
Chapter 7, Page 8 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n In case of fluorescent light check n The chipping of insulation is a


holders, switches, electronic ballast dangerous practice this leaves
and wiring and rectify permanent scratch on the cable.
defect/replace component. The taped conductor will not be
quite satisfactory and so chipping
n Check MCBs/fuses for light should never be done. Testing
circuits in junction box for proper shall be done only at cable
operation and replace defective terminations.
MCBs. Watch for loose
connections between MCB and bus n Poor chipping of cable, poor
bars and rectify. Ensure that crimping of cable lugs and loose
MCBs/fuses are intact for connections in terminals will
protection of each circuits. result in excessive heating and
discoloration of lugs, tapes and
n Check tightness of terminal cables. Watch for this during
connections of HRC fuse for inspection and take prompt action
negative circuit in junction box and to locate and rectify the defects.
rectify defect, if any. Replace overheated tape and re-
tape the overheated portion of
n Use fuses/fuse wires of cable insulation at terminals using
recommended sizes in junction PVC tape after ensuring proper
box as a stop gap measure in place cable connection and cause of
of MCBs and HRC fuses. Ensure overheating.
that fuse wire provided in junction
box as a temporary measures n Replace blown fuses, incorrect size
enroute should be rep laced with fuses and discolored fuses by
MCBs & HRC fuses of the correct fuses of proper rating. Replace
sizes at the primary maintenance blown or incorrect size of HRC
depot. fuses by correct rating. Check all
fuses and ensure that they are
n Remember that fuses & MCBs are secured tightly to their terminals.
safety switch gears provided for Replace defective MCBs/fuses in
isolating the supply in case of junction box by MCBs/fuses of
faults. Never by-pass or use correct rating.
incorrect fuses as this may result in
serious failures . n Never replace a blown fuse by a
higher gauge fuse. Remember that
703j WIRING AND ACCESSORIES fuses are provided for protecting
circuits in case of faults. Try to
n Earthing of wiring in the coach find out the cause of fault.
shall be checked both on the
positive and negative wire n Loose and exposed/hanging wires
separately in each coach by the should be secured and properly
earth testing device. A coach with covered. In case wiring is found
negative earth fault in case of 110 mechanically damaged or tampered
V DC system, which could not be with or needs replacement , the
attended in time, can be given in coach should be marked
service in case of emergency. The electrically sick. If the work is of
coach shall be taken for attention a minor nature, this may be done in
by the primary maintenance maintenance lines.
station during the next trip.
n If the repairs are heavy the coach
n Cable insulation on coaches get may be booked to Shops for
damaged in various ways resulting attention. Coaches which are
in earthing. Damaged insulation suspected to have wiring defect
whenever noticed shall be either in the underframe or roof
promptly taped with PVC tape. shall be subjected to insulation test
with 500 V megger.

Chapter 7, Page 9 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

704 FORTNIGHTLY SCHEDULE n Check the "make of cells and the


lug date. Different "makes" of cells
704a BATTERY mono block if found mixed
together should be replaced by a
In addition to the instructions single "make " of cells. If it is not
contained under "Trip examination" the possible to do this during one
following works shall be carried out. Fortnightly Examination this
should be noted down and attempts
n Clean the interior of battery box. made to replace the same during
the next Fortnightly Examination.
n Clean the cell tops and deposit of
sulphate, if any, in inter cell and n Check whether cell/ mono block
end cell connections. packing is tight and provide
additional packing, if necessary.
n Remove sulphated inter cell Use only hard wood coated with
connections, clean the connecting acid resistant paint for cell
surface with a piece of cloth. Use packing. Never use untreated wood
fresh fasteners. Sulphated internal or plywood for packing of cells/
connections and fasteners should mono block. If any cell/ mono
be soaked in kerosene oil, cleaned block is found cracked, replace it
with warm water and kept ready promptly.
for use. Inter cell connections
should be provided with both small n Check for provision of anti-theft
and large strips and four fasteners rods and provision of nuts, both
each with one hexagonal nut, one inside and outside the battery box
spring washer to IS:3063 and two on either side. Replace deficient
steel punched washers to IS:2016. rod and nuts.

n Remove end cell connectors, clean n Apply petroleum jelly on inter cell
the connecting surface both in cell connection and end cell
and connector thoroughly and connections. Do not use grease.
provide back. Check for proper
crimping of terminal. In case n Check battery fuses and replace
strands of connecting cable are overheated/incorrect size fuses by
found cut at the crimping end, cut correct size.
wire at the crimping end and re-
crimp with a new inter cell n Check battery box fixing nuts for
connector. End cell connector tightness.
confirming to IS:6848 should only
be provided. Tinned copper n VRLA Batteries : SMI.No.
crimping sockets with a single RDSO/PE/TL/SMI/0001-98 IRev
hole, if any, provided as a stop 0) dtd. 01.06.98 to be followed.
gap measure should be replaced by
standard end cell connector. 705 MONTHLY SCHEDULE
Provide end cell connectors with
both the fasteners each with one In addition to the works mentioned in
spring washer to IS: 3063 and one Trip & Fortnightly Examination, carry
punched steel washer to IS:2016. out the following:

n Tap sealed float guides and check


for free movement. Look for
elongated holes in sealed float
guides and replace such guides.
Replace deficient floats promptly.

n Check whether vent plugs are of


the anti-splash type and replace if
required.

Chapter 7, Page 10 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

705a ALTERNATORS, RECTIFIER AND case pilot cells show no


REGULATORS appreciable improvement, check
specific gravity of adjacent cells. If
i) Check for tightness of terminal the specific gravity does not
connections of alternators and improve in spite of charging,
rectifier regulators. replace the battery by another set
and send the defective battery to
ii) Thoroughly clean externally the Depot/Shop for treatment at the
alternator and regulator. earliest. Cells should be handled
with due care while unloading and
iii) Open inspection cover of regulator. in transit to avoid breakage.
Blow dust with a portable blower. Adequate facilities should be
Secure covers tightly after created in Depot for treatment of
inspection. cells which do not pick up charge.
Sulphation will be the main cause
iv) Check locking of current setting of for this and Sulphated cells
regulator, if disturbed it should be should be treated for their recovery
reset/locked as prescribed. as specified.

v) Check the alternator pulley for n On completion of charging, record


proper fixture and the availability the specific gravity of individual
of castle nut and split pin. cells. If there is any wide variation
in the specific gravity/ voltage of
705b AXLE PULLEY cells, disconnect and replace those
cells showing low specific
n Watch for shifting of axle pulley gravity/voltage by spare ones. In
by observing the white band on case there are more than 1/3 of
either side of pulley. Reset the total cells with low specific
correct position of pulley, if found gravit y, the entire set should be
shifted and tighten the loose nuts replaced. Cells showing reverse
with torque wrench with voltage, zero volts should be
recommended torque.. withdrawn and replaced by charged
cells immediately.
n Check tightness of nuts and also
availability of chuck nuts and split n Record individual voltage of cells
pins in all fixing bolts. and the total voltage on full load
of the coach.
705c BATTERIES
n Change the marking of the pilot
i. Conventional Lead Acid Batteries cell as given in table 7.2.

n Record specific gravity of ii. VRLA Batteries


individual cells/mono block.
"Switch on" full load of the coach SMI no. IRCAMTECH/PE /TL/ SMI/
and record individual voltage of 0001-98- (Rev.0) dtd. 01.06.98 &
cells and total voltage. "Switch RDSO/PE/TL/SMI/ 0002-98 (Rev.0) dt.
off" load. If the specific gravity is 09.12.98
less than that painted on the
battery box, charge the cells as 705d JUNCTION BOX
specified under "Trip
Examination" after topping up with n Open front door. Check all
DM water, if required. connections in MCB-cum-fuse
panel for tightness any for heating
n Use battery charging terminals sign, fuses etc. Check availability
provided on coaches for charging of terminal lugs for all cables in
purposes. Charging should be junction box and replace if
continued till the specific gravity necessary by terminal lugs of
rises to the value of mentioned in correct size.
battery box, on "Pilot" cells. In

Chapter 7, Page 11 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Check Rotary Switch / MCBs n Studs used for fixing the fan to
provided for lights, fans circuits for coach body, shall be checked and
correct condition and Rotary tightened, wherever necessary.
Switch and EFTs for proper Availability of all the three fixing
operation. Replace/ repair studs should be ensured.
defective MCBs. If MCBs are not
n All the switches controlling the
readily available provide
fans shall be checked for its
rewirable fuses of appropriate
smooth operation and correct
ratings, purely as a stop gap
working and replaced, where
measure. Check up negative fuse
necessary.
and replace if necessary by
different ratings of HRC fuse for n Fan regulators in Upper class
AC and non AC coaches. If rotary coaches shall be checked for
switches are provided instead of smooth operation from one
MCBs, Check for proper operation. position to the other. In case the
Check up HRC fuses provided with regulators are not regulating the
rotary switches for correct rating fan speed, the resistance box shall
and replace, if necessary. be checked and replaced, where
n Close front door and secure necessary.
properly by the locking key. If
n Fan blades shall be replaced if
found defective, the same may be
attended/replaced. found bent, or if there is no proper
air discharge.
705e WIRING AND ACCESSORIES
In addition to the items listed under trip 705g CARRIAGE LIGHTING
inspection, the following items shall
In addition to the items listed out under
be inspected:
"Trip Examination" proceed as follows.
Superstructure wiring and underframe
wiring shall be tested separately for n Open each fitting with the dome
which the main negative fuse in shall be key and remove the dust of the
opened and controlling MCBs for all fitting both from inside and
circuits kept off. All other fuses shall outside. Ensure free operation of
remain in circuit. Insulation resistance locking mechanism and er place
shall be measured with all fittings and defective fitting. Clean glass
equipment connected both on domes first with wet cloth and then
underframe and superstructure. The with a clean dry cloth.
underframe wiring shall be tested with
battery fuse open. The IR value n Replace rusted fittings and fittings
should be minimum 2 Mega-Ohm in with damaged surface.
fair weather condition and min. 1
Mega-Ohm under adverse weather n Check up wattage of lamps and
condition. Availability of inspection replace with that of correct
cover of DFBs should ensured. wattage.
705f FANS
n Check up whether toggle switches
In addition to the items listed under " are marked to indicate lighting
trip examination ", the following control "L", night light control
works shall be carried out : `NL', side lamps in guards
compartment as `SL', tail lamps as
n The fan body, guards and blade `TL-Rear', `TL-Front', luggage
shall be thoroughly cleaned with room as `LRL'. If not, stencil
cloth. legends with fluorescent paint.
n All fans shall be opened and
n Check up all lighting circuit fuses
condition of commutator, brushes
in each coach for correct sizes and
and brush gear shall be thoroughly
replace if necessary. Stencil the
checked. Action should be taken
size of fuses near the locations, if
where necessary as given under
not already done.
"Trip Attention".
Chapter 7, Page 12 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Terminate charging when 3


n Mark inspection covers of successive readings are constant.
Distribution fuse boards as `DFB' Record specific gravity and no
if not done already. load voltage of each cell 10
minutes after terminating charge.
n Thoroughly clean metal guards fo r Specific gravity should be between
roof light fittings in luggage rooms 1.210 and 1.220 for cells upto 120
and paint, if necessary. Ah capacity. The voltage should
not be less than 2.1 V.
705h TUMBLER / TOGGLE SWITCHES
n If there is a wide variation in the
Check each toggle switch of lights specific gravity and voltage
and fans for proper fixing and readings, such cells should be
operation. Replace defective toggle replaced and sent to shops for
switches. Toggle switches should treatment.
be provided in the locations
intended for them and provided n Check the cell voltage on full load.
with covers with their knobs Cells showing reverse and low
exposed for operation by voltage are to be replaced with
passengers. hwalthy cells of the same
make/type.
705i DISTRIBUTION FUSE BOARDS
AND FUSE CUT OUTS ii. VRLA Batteries :

Check distribution fuse boards and SMI no.RDSO/PE/TL/SMI-0001-


fuse cut outs of light and fan circuits, 98 (Rev.0) dt.01.06.98 &
for tightness of connections and RDSO/PE/TL/SMI/0002-98
provisions of correct size of fuses in (Rev.0) dt. 09.12.98 to be
the fuse terminals. Replace missing followed.
distribution fuse board covers.
707 HALF YEARLY SCHEDULE
705j EMERGENCY FEED TERMINALS
(EFTs) Measure insulation values as follows:

n Check up supply and marking of 707a SUPER STRUCTURE


polarity of EFTs.
Short all the outgoing positive
n Replace missing EFTs and those terminals from MCB cum fuse panel.
without wiring nuts.
Measure and record the following
706 QUARTERLY SCHEDULES insulation values:

706a BATTERIES n Between the bunched outgoing


terminals and earth.
In addition to the instructions
contained under "Monthly n Between the bunched outgoing
Examination" following activities positive terminal and main
should be done: negative outgoing terminal.

i. Conventional Lead Acid n Between the main negative


Batteries outgoing terminals and earth.

n `Switch off’ load. Charge the cells 707b UNDERFRAME


at 50% of normal rate of charge,
i.e., at 1/10th of the rated capacity Short the incoming terminals PM and
of cells. Record hourly cell L+ in MCB cum fuse panel. Measure
voltage and specific gravity and record the following insulation
reading of every cell. values:

Chapter 7, Page 13 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Between the bunched terminals PM n Check voltage drop between


& L+ and earth. battery and the farthest light or fan
point with full coach load “on”.
n Between the bunched terminals PM
The voltage drop should not
& L+ and main negative
exceed 3.0 V.
incoming terminal.
n Between the main incoming n Provide deficient switch and fuse
negative terminal and earth. covers promptly.
Note: Insulation resistance under fair n Coach wiring should be terminated
weather conditions shall be minimum 2
in two way connectors which
mega ohm. However under adverse
shall be of tough non-ignitable
(highly humid/wet) weather conditions, moulding materials of rigid PVC
the minimum insulation resistance upto
from which connection to the
1 M.ohm will be acceptable.
fitting shall be provided by
In case the insulation resistance is flexible single core cables for the
found less than the values mentioned following :
above, individual sub-circuits at
junction box for super structure wiring • Fans
and different feeders for underframe • Reading light fittings
wiring shall be meggered separately. • Side light fittings
The sub-circuit having an insulation • Tail light fittings
value lower than that prescribed above • Step light fittings.
shall be taken up for rewiring. If the
nature of repairs is heavy, the coach n Provide missing connectors.
shall be booked to shops for attention.
Do not resort to patchwork in wiring n All cable ends shall be properly
with temporary joints. socketed. Provide crimping type
sockets wherever this is not in
Proceed further as follows: existence. Use sockets of
appropriate size. Corrosion
n Strands of alluminium wire cannot inhibiting conducting grease shall
serve as tinned copper fuses to be applied to the conductor as well
protect circuits. Never resort to as inside the socket before
this habit. crimping. Soldered joints should
ordinarily be avoided, where this is
n Use crimped socket of appropriate absolutely necessary, only
size in all cable ends to avoid approved grade of solder and flux
loose connections and shall be used.
consequent overheating.
n Electrical connections provided
n Use corrosion inhibiting with bolts and nuts shall be
conducting grease while crimping checked and provided with a set
cables or while connecting wires of mild steel plain washer and
to prevent oxidation. spring washers, protected against
corrosion by Zinc or Cadmium
n Stencil the correct size of fuses plating and passivation. Use
near the locations, if not already correct tools for tightening cable
done. connections.

n Check all fuses and MCBs for n Surface of aluminum sockets and
correct rating and MCBs for proper bus bars, whenever removed for
functioning. Replace if necessary. attention shall be cleaned to
remove the oxide film from the
n Provide spare fuse wires of correct jointing surface before making a
rating for use in branch circuits on bolted joint and shall be coated
the bobbins located on distribution with corrosion inhibiting
fuse boards. conducting grease to prevent re-
formation of oxide film.
Chapter 7, Page 14 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

• Field terminals and stator


n V-Belt : The existing V-Belts shall terminals
be replaced with the new V-belt. 4
nos. having same make/grade. The (Note : Minimum insulation resistance
old V-belts removed from service should not be less than 1 Mega ohms
to be destroyed. for 4.5 kW under worst weather
conditions and 20 mega ohm for
708 POH SCHEDULE 18/22.75 kW respectively)

708a BRUSHLESS iii. OVERHAULING


ALTERNATOR
n The machine received for
The procedure to be followed shall be overhauling should be externally
as per guide lines given below. cleaned with wire brush and wiped
before dismantling.
i. VISUAL INSPECTION
n Clean and re-grease the bearing
Carry out visual inspection of the after removing the bearing from
machine and record the following:- the bearing housing. Only Servo
Gem (RR-3) grease shall be used.
n Serial number and name plate
particulars of the machine. n Clean the mating surface of the end
shield.
n Check that rotor rotates freely.
n Check the suspension bushes. n While removing and placing the
rotor, care should be taken that the
n Check insulation resistance rotor does not rub over the field
n Check continuity of the field coils.
and stator
n If any grease has crept into the
n Check alternator tension rod stator surface, clean it before
n Check the bearing noise with assembling.
shockpulse meter
n If stator and rotor parts are found
rusty, clean. Apply the insulating
ii. ELECTRICAL CHECKS
varnish (air drying) of
recommended grade. Impregnation
Carry out the following electrical
of the varnish shall be done in an
checks and record the following: -
air circulated oven.
n Open the cover of the terminal box
n Change the alternator suspension
and check whether the internal
nylon bushes 100% and change the
termination and terminal board are
suspension pin on condition basis.
intact.
n Tighten all the connections on the n Apply the insulating varnish (air
terminal board. drying) of recommended grade.
n Using a multimeter, check Impregnation of the varnish shall
continuity between be done in an air circulated oven.
• Field terminal F+&F-
• Stator terminals U&V, V to W n After complete fitment and
and W to U greasing, the bearing noise shall be
recorded using shock pulse meter.
n Check the insulation resistance by
500 V megger between
n Only bearing of SKF/FAG shall be
provided as per recommendation of
• Stator terminals and frame of
RDSO.
machine
• Field terminals and frame

Chapter 7, Page 15 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

iv. TESTING OF ALTERNATORS speed from 600 rpm to 2400


rpm. Setting shall be done at
INSULATION RESISTANCE TEST 1500 rpm and half load 19A
before starting the test.
Check the insulation resistance
• Alternator The voltage should
not exceed ± 5 % of the set
Place of Check Required Value for voltage at a speed from 600
Conventional Coaches rpm to 2400 rpm. The set
voltage can be 120 V, 122 V,
Between stator. Above 1 M Ω 124 V at 19 Amp. 1500 rpm.
winding and earth Check the MFO (minimum
speed for full output) i.e. 37.5
Amp. for 4.5 kW alternator, it
Between field Above 1 M Ω
should not be more than 600
winding and earth.
rpm.
Between field Above 1 M Ω
vii. TEMPERATURE RISE TEST
winding and stator.
For 4.5 kW Alternator
• Regulator
Run the alternator at 600 rpm
Place of Check Required Value and apply the load. The alternator
Conventional Coaches should be capable of giving 37.5
Amps at 120 Volts. Run the
Short all terminal alternator at 2500 rpm with full
(live parts) together Above 1 M Ω load for five hours with a fan
and check the insulation cooling the body. Check the
resistance between the temperature at different part of the
live parts and earth. alternator and should be as
follows:-
Note: The insulation resistance of all
the above should be measured a) Power diode - Should not exceed
by 500 V megger. 100 0C at ambient
of 500 C.
v. NO LOAD TEST
b) Alternator terminal - Should
Connect the alternator not exceed 100 0 C
and regulator with a at ambient of 500 C.
resistance/battery load. Run
the Alternator at base load (1 c) Bearing temperature - Should not
A) at various speed from 357 exceed 85 0 C at
rpm to 2500 rpm. ambient of 50 0 C.

This voltage should d) Stator and Field - Should not


not exceed ± 5% of set the exceed 900 C at
voltage. The cut in speed win ding load of
should also be checked. It 37.5 Amps.
should not be more than 357
rpm at 108 volts at zero load. 708b RECTIFIER REGULATOR UNIT

vi. LOAD TEST The procedure to be followed shall be


as per guidelines given below.
Connect the alternator
and regulator with n Check the terminals and inside
resistance/battery load. Run wires for heating signs and
the alternator at half load i.e. looseness. Blow out the dust.
19 Amp. and full load 37.5
Amp. respectively at various
Chapter 7, Page 16 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Replace the damaged n Record voltage and specific gravity


wiring/terminals. The wiring of the of each cell.
regulator shall be done
n Clean exterior of the cell/ mono
systematically,
block thoroughly. Wash top of the
battery with a 10% solution of soda
n Check the PCB circuit with PCB
and a wire brush. During such
testing kit or multimeter to identify
cleaning, it is necessary to ensure
defective components. Replace the
that the micro porous vent plugs
defective components.
are mounted on the cells so that the
water does not enter into the cells.
n Check field transformer for correct
voltage. Replace, if found n Battery boxes shall be
defective. cleaned/repaired and repainted with
anti corrosive epoxy based paint
708c V- BELTS/ TENSIONING GEAR after removing the bat tery. Check
the opening of welds and cracks
n The existing V belts shall be thoroughly specially on load
replaced with the new V belts 4 bearing members, vicinity of
Nos. having same grade/make. The mounting bolts etc. Detection of
old V belts removed from service minor hair line crack shall be done
to be destroyed. with ultrasonic testers.
n Top up cells wherever necessary
n Tensioning gear shall be removed
with distilled water. The level
and its spring shall be checked fo r
proper functioning. If required should be corrected as indicated on
the float.
moving parts of tensioning device
including spring shall be replaced. n If there is corrosion/sulphation on
the inter-cell- connectors etc., clean
708d ‘V’ GROOVED AXLE PULLEY them thoroughly and protect from
further corrosion by applying
The procedure to be followed shall petroleum jelly or Vaseline. Cell
be as per guidelines given below: connectors and fasteners should be
changed on condition basis.
n Check the axle pulley for slippage,
n Replace defective sealed float
tightness and physical damage to
guide and micro porous vent plugs,
grooves. Ensure availability of
if any.
locking nuts and split pins in
position. Check the alignment of n Clean micro porous vent plugs and
axle pulley with the alternator sealed float guides and ensure that
pulley and adjust. Change the vent holes are in order.
rubber packing.
n Record lug date to determine the
n Replace the pulley if any groove is life of the battery.
damaged/broken/worn-out . n Charge the battery fully till 3
constant half hourly readings of
n The pulley shall be replaced after voltage and specific gravity are
four years period or earlier on obtained. This will indicate that
condition basis. battery is fully charged.

708e BATTERY AND BATTERY BOX n Discharge the battery at 10 hrs


discharge rate. While discharging,
The procedure to be followed shall be record the voltage and specific
as per guidelines given below. gravity.
n Record the capacity of the battery
n Remove the cells from the battery during discharge. It should not be
boxes on arrival of the coach in less than 80% of the rated capacity.
workshop and bring them in the
battery shops for maintenance.

Chapter 7, Page 17 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n In case while discharging, any of ii. Cable termination joint


the cells fall below 1.8 volts,
disconnect the cell from the circuit n All cable joints shall be
for treatment with one or two checked for its loosness or
cycles of slow charge and heating signs. Loose joints and
discharge. cables having damaged
insulation shall be
n After two cycles of charge and replaced/repaired. All cable
discharge, recharge the cells fully. ends shall be properly
socketed with crimping type
n Battery box vertical/horizontal sockets.
member shall be checked for any n Surface of crimping sockets
minor/hair line cracks, its and bus-bars shall be cleaned
mounting arrangement ensuring to remove the oxide film from
proper securing through nut the jointing surface before
bolts/washers etc. making a bolted joint and shall
be coated with corrosion
n In case of VRLA Batteries, SMI resistant conducting grease of
no.RDSO/PE/TL/SMI/0001 -98 approved make to prevent
(Rev.0) dt. 01.06.98 and reformation of oxide film.
RDSO/PE/TL/SMI/0002-98
(Rev.0) dt. to be followed. n Fire retarding PVC grommets
to IS:1767 or grade 6 of
708f WIRING (After 2 years for new coaches IS:5831 shall be provided at
and 1 year for old coaches) all cable entry points in
metallic members.
The wiring shall be completely n The under -frame wiring if
inspected for damage by opening side running loose shall be
panels, end wall near EFT's and also provided in flexible steel
near fittings after stripping. The re- conduit.
wiring shall be done on condition basis
or planned on the basis of life of 20 n All inspection covers shall be
years for cables. opened to check the
distribution boards and
The cables used for re-wiring condition of wiring.
shall be as per IS:694-1990 (Third
Revision) The cables taken up for re- iii. General Precautions
wiring shall be done through PVC
conduits in super structure conforming n Do not peel insulation for
to IS:2509. Bushes/Grommets used testing. If wires are found
shall be of Hard PVC as per BS:1767 - with peeled insulation replace
1951 or to grade 6 of IS-5831 latest. them with fresh wires. If
Flexible conduits used, if any, under peeling is of short length
water tank shall be as per IS:6946. apply proper PVC adhesive
tape.
i. Coach insulation
n Do not use twisted joints of
Insulation resistance of the coach aluminum cables to avoid
shall be measured with 500 V oxidation and improper
megger. IR value should be contacts and over
minimum 2 Mega ohms but it heating/earth fault due to
should not be less than 1 Mega loose strands.
ohm under highly humid/wet
weather. n Remove earth fault by
isolation method instead of
hit and trials and short
cir cuiting of opposite polarity
of earth.

Chapter 7, Page 18 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Use proper rating of fuses


both in branch circuits, rotary 708h FANS
panels and regulator boxes for
field and main fuse. n Dismantle the lower guard, upper
guard, blade and fan motor.
n Use HRC fuse to the extent
possible except for branch n Check the guard assembly,
which may be done with re- repair/replace if necessary.
wirable tinned copper fuse. In
the absence of HRC fuse use n Check the blade angle with a
correct size equivalent re- measuring gauge. Correct the
wirable fuse. Do not use same, if necessary.
under rated or over rated
rewirable fuse to avoid faulty n Check the insulation resistance of
tripping of defective circuits. the fan motor. The IR value should
not be less than 2 Mega ohms as
n Use connectors for lights & specified in IS: 6680-1992.
fans.
n Check the fan leads and change it
n Ensure extra length of cables if necessary.
near termination’s for future
maintenance and replacement, n Check the armature winding and
if found inadequate at the field coil, repair/replace, if
earliest opportunity. necessary.

n Check for earth fault on every n Check the commutator for


maintenance and rectify those grooving, pitting marks, ovality,
detected. blackness etc. Polish the
commutator if required.
n Do not tamper with regulator
potentiometer setting unless n Check the carbon brush and brush
tested in a proper alternator spring. Replace by correct grade of
drive having variable speeds. carbon brush as recommended by
RDSO. The fan spring should
708g SWITCHES, LIGHT FITTINGS, meet the requirements given in
ETC. IS:6680. Replace the same if
necessary.
i. Light fittings
n Apply air drying insulating varnish
The light fittings, reflectors, clear if IR value of the armature and
acrylic sheet cover, glass globe, field coils is low, give
holders, etc., shall be checked and impregnation treatment in an air
cleaned. Any defective part shall be circulated oven.
replaced. Ant i- theft arrangement
for fluorescent light fittings shall be n Clean the ball bearing, check for
checked as per ICF Drg. No. noise, replace if necessary or
ICF/SK-7-6-079. grease it with recommended grade
grease.
ii. Rotary Switch Cum Junction Box
Testing
Strip the housing from the coach
and clean thoroughly and remove i) Check the load current at
oxidation from terminal points and rated voltage. The wattage
check the function of rotary of the fan should not exceed
switches. Fit back the same and do the value specified in IS:
the connections using corrosion 6680.
inhibiting compound for better
conductivity and to avoid oxidation
of all contacts.

Chapter 7, Page 19 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

ii) Check the air delivery of


one or two fans from a batch n Do keep the terminal box
to ascertain the correctness tightly closed.
of the blade angle. The
value of the air delivery n Do open the terminal box
shall not be less than that once in a week and clean the
specified in IS:6680. accumulated dust, if any.

NOTE : n Do check tightness of the


connection regularly, at least
n SKF/FAG (imported) make once in a week.
bearings for alternator procured
directly from manufacturers as n Do use the cable grommets
specified in the RDSO or cable gland of correct size
specification shall be used. Use of for reducing the vibration of
other makes of bearing is not terminal connections. It is
permitted. preferable to anchor the
cables externally to avoid
n Shock pulse meter shall be shocks and vibrations on the
procured by Railways and terminals.
workshops to monitor condition of
the bearing regularly during ii. DON’TS
maintenance service and after
replacement of defective bearings. n Don’t use improper tools to
handle the alternator, it may
n Induction heater/oil bath shall be damage parts of the
alternator.
used for heating the bearing to the
required recommended
n Don’t re-grease the bearing
temperature.
frequently. Re-greasing
should be done after
n The pulley condition such as wear
thoroughly cleaning the
on V group, pulley key way, shaft
bearing with white spirit. It
way, groove angle etc. shall be
is preferable to re-grease the
monitored during POH. Proper
bearing only during POH.
gauges shall be used for checking
"V" groove of the pulley.
n Don’t over-grease the
bearing.
709 DO’S AND DON’TS FOR MAJOR
EQUIPMENT
n Don’t keep the belts in over
tension as this may reduce
709a ALTERNATOR
life of the belt.
i. DO’S 709b REGULATOR
n Do ensure the correct i. DO’S
polarity of field winding i.e.
positive connected to F +
n Do check the regulator
while measuring the terminal box once in a
continuity of the field month for loose connections
winding, otherwise the
and for cleaning the dust.
alternator will not self
excite. n Do short all seven terminals
of the terminal box before
n Do check the proper
measuring the insulation
compression force on the
resistance.
tensioning spring with
indicator plate by tightening
the special nut.

Chapter 7, Page 20 of 21
Hindi CONTENTS
Maintenance Manual for BG coaches of ICF design Train Lighting (Non - AC) coaches

n Do ensure that DC ‘+’ and upto the split pin for the 18
DC ‘-’ are connected to kW, 22.75 kW, 25 kW
battery positive and battery Alternators and 55 mm for
negative respectively. 4.5 kW alternators.
Wrong connection will
damage main diodes. n Maintain proper alignment
between axle pulley and
ii. DON’TS
alternator pulley.
n Don’t disturb the settings of
the regulator shunt and n Replace pulley with burn
potentiometer. out grooves i.e. 0.8 mm
depression on sides and
n In any circumstances the bottom of grooves with
burden resistance setting uniformly shining surface.
should not be disturbed.
n n Form grades of the belts
Don’t open the regulator
received from the
box unless there is a defect.
stores/suppliers after
n Don’t use a megger to test checking on belt
the components . Use measurement gadgets. The
multimeter. grading of belts should be
between 48 and 52 only of
n Don’t reverse the field matched sets.
terminals on regulator and
alternator. ii. DON’TS
n Never use a fuse wire for
field fuse. Always use HRC n Do not allow loose belts.
fuse of specified value.
n Do not disturb the nut and
709c `V’ BELTS check-nut on free end of
tension rod if proper gap is
i. DO’S available between
n Use belt of the same length supporting plate and fixing
for a set. nut i.e. 75 mm for AC coach
alternators and 55 mm for
n Belts should be stocked in TL alternator.
lots as per date of receipt
and use in the principle of n Do not use repaired pulleys.
first in first out basis. The
belts shall be stored in a n Do not use old and new
well ventilated room free mixed belts in sets.
from direct sunlight and
moisture. n Belt should not have any oil
or grease traces ,if persist
n Ensure correct belt tension clean it by soap and water.
i.e. 330 Kg for 18 kW, 22.75
kW and 25 kW alternators n The matched set should
and 105 kg for 4,5 kW have belts of one
alternators. The tolerance of manufacturer only. Do not
tension shall be ± 5 kg in use belt of same grade of
both cases. different manufacturer in a
set.
n Re-tension newly fitted belts
after first trip. 709d VRLA Batteries : Do's and Don'ts
from SMI no. RDSO/PE/TL/ SMI/
n Maintain a gap of approx. 0001 - 98 (Rev.0) dt. 01.06.98 to be
75 mm between supporting followed.
plate and fixing nut on the
free end of tension rod or

Chapter 7, Page 21 of 21

You might also like