The Application for NOC for Ground Water Mr. Vivek Gahlot /
Safety / Mechanical
Extraction may be reviewed Further Mr. Sunil Srivastva
considering the Actual Water consumption.
Total Water Requirement is 401m3/Day. But
Actual Consumption is more than that.
The Inspection sheet for Full Body harness safety Mr. Sunil Srivastva
may be prepared being provided by Amplus
(solar Panel Activity).
Environmental Data Board need to be
safety Mr. Sunil Srivastva
displayed at outside the gate also
Done
Eye Shower water pressure insufficient and safety Mr. Sunil Srivastva
wrong way of connection
Mr. Sunil
Heat Stress Study need to be conducted in Hot Hot end Srivastva /Mr. Goutam
End Area Dhar
Action Plan Report
Due to absence of effective system to verify fitness and usage All pollution control devices will be checked for
of Air pollution control devices time to time their interlinkage with process output and proper
monitoring report will be maintained
25th Jan-2020
Consent for Emission testing got revised in month of May- Emission testing was conducted in month of Dec-
19.and initially this consent was for an year validity which was 19, now a plan will be made on quarter basis and
requiring testing on annual basis, now the revised consent is for testing will be ensured as per plan.
three year validity whose requirement is to ensure testing on
quarter basis and due to lack of knowledge for the requirement Mar-20
this remained pending
Mock Drill plan made is very generic, it is not specifically Mock Drill plan will be revised specifically for
defined for all Potential emergency identified in On Site coverage of all potential emergency situation 30th Jan-2020
Emergency response plan identified
Ensure adherence to Emission testing plan EHS Officer March 2020. Closed
Closed