A 1. Scope: Pt. Multi Fabrindo Gemilang Procedure Manual Document No
A 1. Scope: Pt. Multi Fabrindo Gemilang Procedure Manual Document No
1. SCOPE
2. REFERENCE
2.1 ASME Section IX 2019 Edition
2.2 Fabrication procedure
3 TOOLS
3.1 Water pass.
3.2 Tape
3.3 Rose Head Burner
3.4 Tempered Stick
3.5 IR Gun (If Available)
4 PROCEDURE
4.1 Carbon Steel
4.1.1 Check dimensional of nozzle, how far and orientation of nozzle out of
tolerance.
4.1.2 Burn using Rose head burner at the other side of tilted nozzle orientation.
4.1.3 Fitter must control the temperature using tempered stick or IR Gun.
4.1.4 After Burn for a while, re-check the dimensional.
4.1.5 Repeat step 3.2 and 3.4 until the Nozzle orientation fit the tolerance