VISKEN CONSTRUCTION & TRADING OPC.

# 110 kagawad rd. Batasan Hills Commonwealth Quezon City


Telephone #: 428-1258/ 280-8197
Cell #: 09151368837 / 09994787596/09396622793
Email: vistrad_contractor@yahoo.com

JULY 02- 2020 QUOTE NO: 00273

ENGR. JERIC BANAL


Project Manager

ME. SICAT CONSTRUCTION INC.


BRGY. SOUTH TRIANGLE QUEZON AVE., QUEZON CITY

PROJECT: PROPOSED LABOR INSTALLATION OF AUTOMATIC FIRE SPRINKLER SYSTEM


AND FIRE DETECTION ALARM SYSTEM (FDAS)
LOCATION: TEN STOREY UP FACULTY CENTER BLDG.
SUBJECT: QUOTATION OF FIRE PROTECTION

Sir,

We Are Pleased To Submit our Proposal And Price Quotation for Labor and Supervision of Automatic
Fire Protection Sprinkler System and Fire Detection Alarm system for Eight Storey UP Faculty Center
and Parking Bldg, Located at Roxas Avenue, cor. Roces St. Old Faculty Bulding, UP Diliman,
Commonwealth Avenue, Quezon City in the Amount of FIVE MILLION EIGHT HUNDRED
SEVENTY FOUR THOUSAND TWO HUNDRED EIGHTY PESOS ONLY. PHP. 5,874,280.00
(VAT INCLUSIVE)
SCOPE OF WORK :

A. Installation of Automatic Fire Sprinkler System

1. Installation of Riser Bi. Pipe 150mm. Schedule 40 Standard welded with Complete fittings from
Lower ground to Roof deck floor. Php. 265,298.00

2. Installation of Fire hose cabinet with Complete accessories, from Lower ground to Eight floor.
Php. 137,500.00

3. Installation of Fire pump and Jockey pump with Controller, Alarm check valve, Prv.
Php. 80,000.00
4. Installation of Feedmain line with Complete Gate vale and Accessories from Lower ground to
Eight floor. Php. 639,145.00
5. Installation of Floor Supervisory Control vale, Drain valve, Gate valve, Sight glass, Pressure
gauge, Check valve, Inspector test connection from Lower ground to Eight floor.
6. Php. 130,147.00

7. Installation of Branch line and Pipe supports, Hangers, Brackets, Fabrication of Structural Steel
way Braces from Lower ground to Eight floor. Php.2,484,800.00

8. Installation of Fire truck inlet Connection with Siamese twin.

9. Hydrautesting of Riser, Feedmain, Branch line, Dry stand pipe from Lower ground to Roof deck
Php. 130,860.00

10. Installation of Dry Stand Pipe, Fire Hose valve with Cap and Chain, Fire truck inlet connection
from Lower ground to Roof deck. Php. 276,180.00

B. Installation of Fire Detection Alarm System (FDAS)

11. Installation of Smoke Detector, Imc Pipe, Conduit, Fittings, and Pull Boxes from Lower ground
to Eight floor. Php. 573,580.00

12. Installation of Manual Call Point with Strobe Sounder from Lower ground to Eight floor.
Php. 112,000.00

13. Installation of Fire Protection Control Panel and annunciator, Addressable module from Lower
ground to Eight floor. Php. 375,800.00

14. Installation of Wires, Cable into Conduit and Wiring Devices from Lower ground to Eight floor.
Php. 588,970.00

15. Testing and Commissioning from Lower ground to Eight floor. Php. 80,000.00

I. To provide engineering and documentations, supply of tools and equipment, labor and
supervision for the installation of Fire Protection Sprinkler System and Fire detection alarm
system (FDAS) for M.E. SICAT INC.,and other associated services necessary for the
completion and testing of the proposed project in accordance with Technical Specifications
and the following codes and standards:

RA 9514 Fire Code of the Philippines


NFPA 13 Standard for Automatic Sprinkler System
NFPA 20 Standard for Fire Pumps

1. To conduct a full systems tests of each Fire Protection System.


2. Testing and Commissioning
3. To provide training and instruction to operating personnel on the proper operation of each
system involve.

II. OTHER CONDITIONS:


1. Shall provide for VISKEN CONSTRUCTION temporary site storage.
2. Utilities like power and water needed to operate VISKEN Trading tools and equipment, shall
be provided by M.E SICAT INC. on site.

III. COMPLETION
The Supply and Installation of Fire Protection Sprinkler System shall be completed within Three
Hundred (300) Calendar days, provided with a free and uninterrupted access to all working areas
involved for all VISKEN CONSTRUCTION & TRADING employees.

IV. TERMS OF PAYMENT


Five Percent (10%) Down payment for the mobilization of the project.
Ninety Five Percent (90%) Through progress Billing proportioned to the accomplishment report.

Hoping this quotation meets your favourable consideration and approval.


Thank you and God bless!

Very Truly Yours.

ENGR. ELVIS R. ALQUIZOLA


Owner/ General Manager