A requisition slip was submitted by Ian Toledo, a site engineer for the UP Faculty Center project located in UP Diliman, Quezon City. The requisition is for 40 cubic meters of ready mix concrete with a 6000 PSI compressive strength to be achieved within 28 days. The concrete is needed by January 9, 2021 for pouring the parking area shearwall and columns.
A requisition slip was submitted by Ian Toledo, a site engineer for the UP Faculty Center project located in UP Diliman, Quezon City. The requisition is for 40 cubic meters of ready mix concrete with a 6000 PSI compressive strength to be achieved within 28 days. The concrete is needed by January 9, 2021 for pouring the parking area shearwall and columns.
A requisition slip was submitted by Ian Toledo, a site engineer for the UP Faculty Center project located in UP Diliman, Quezon City. The requisition is for 40 cubic meters of ready mix concrete with a 6000 PSI compressive strength to be achieved within 28 days. The concrete is needed by January 9, 2021 for pouring the parking area shearwall and columns.