You are on page 1of 2

Nr.

:
DATA SHEET I-FD-3010.68-1251-456-KPS-220
CLIENT: SHEET:
UN - RIO - E&P / ATP - RO 01 of 02
JOB:
Roncador Field Development
AREA:
FPSO UNIT – P-54
TITLE:
LUBE OIL COOLER DATA SHEET
TAG NR.P-UB-125101 A/B/C/D - 01/02
SUPPLIER DOC. Nr.:
E4-152.546-026
J S L CONTRACT Nr:

FILE Nr.:
899.2.005.04-5
I-FD-3010.68-1251-456-KPS-220_B.xls
REQUISITION Nr.:
Aker Kvaerner Process Systems I-RM-3010.68-1251-311-JUR-001
PURCHASE ORDER Nr.:
-
PACKAGE ID: PACKAGE DESCRIPTION.:
MEC-018 INJECTION WATER PUMPING UNIT
EQUIPMENT TAG(S):
UB-125101 A/B/C/D

REVISION INDEX
REV. DESCRIPTION AND / OR REVISED SHEETS
0 ISSUED FOR CONTRACTOR COMMENTS
A ISSUED FOR CONTRACTOR COMMENTS
B ISSUED FOR CONTRACTOR COMMENTS
C CERTIFIED

FOR INFORMATION FOR REVIEW DFD DFI

THE REVIEW OF THIS DOCUMENT DOES NOT RELEASE THE


SUPPLIER OF RESPONSIBILITY FOR THE DESIGN,
FABRICATION AND PERFORMANCE OF THE SUPPLIER
EQUIPMENT OR ANY CONTRACTUAL OR OTHER OBLIGATIONS

NO COMMENTS. Send certified drawings.


A Proceed with fabrication
WITH COMMENTS. Revise and re-submit for
B comments. Proceed with fabrication
WITH COMMENTS. Send certified drawings.
C Proceed with fabrication.
REJECTED. Reissue for comments. Stop
D fabrication

E CERTIFIED DOCUMENT. Accepted

F FOR INFORMATION

Name: Felipe Signature:


Date:21/12/05
REV. 0 REV. A REV. B REV. C REV. D REV. E REV. F REV. G
DATE 17,Mai 05 23, Sep 05 11, Nov 05 24, Jan 06
DESIGN KPS KPS KPS KPS
EXECUTION IDS IDS IDS IDS
CHECK RC RC RC RC
APPROVAL RC RC RC RC
THE INFORMATION CONTAINED IN THIS DOCUMENT IS PETROBRAS PROPERTY AND MAY NOT BE USED FOR PURPOSES OTHER THAN THOSE SPECIFICALLY INDICATED HEREIN

THIS FORM IS PART OF STANDARD PETROBRAS N-381 REVISION F ENGLISH ANNEX A SHEET 01/08
Nº REV:
DATA SHEET I-FD-3010.68-121-456-KPS-220 C
SHEET:
FPSO UNIT - P-54 02 of 02
TITLE:

P-UB-125101 A/B/C/D-01 and P-UB-125101 A/B/C/D-02

You might also like