You are on page 1of 2

SUPERPAVE LOT PAVING REPORT

CONTRACT NO. PROJECT FROM LOT NO. MST DESIGN NO. DESIGN DESIGN
PROJECT NO. DENSITY
(kg/m3) AIR VOIDS (%)

WEEK ENDING PROJECT TO MIX TYPE PIT NAME DESIGN DESIGN


CL NO. A CS ASPHALT
YY MM DD CONTENT (%) VMA (%)

PAVING CONTRACTOR QA CONSULTANT TARGET DESIGN


ASPHALT LIFT
MAT 6-78S/12 CONTENT (%) THICKNESS (mm)
GYRATORY FORMED SPECIMENS MIX LOT PAVEMENT AND COMPACTION DATA

CORE MOISTURE
DENSITY * VOLUMETRICS CORRECTE
**

THICKNESS
(% of Gmm) @ Ndesign Maximum D ASPHALT
DATE LAID

SEGMENT #
DENSITY

LOCATION

CORE
Specific CONTENT CORE
STATION DENSITY AIR VOIDS

+ OR -

LANE
@Ndesign

LIFT
AIR DENSITY
Cini Cdes Cmax V.M.A. V.F.A. Gravity % of Gmm
VOIDS
(T.M. _____)
(dd-mmm-yyyy) (kg/m )
3
(%) (%) (%) Gmm (%) (00+000) (mm) (kg/m3) (%) (%) (%)

1
LOT 2
AGGREGATE
PROPORTIONS 3
COARSE
AGG. % 4
MF %
5
BLEND
SAND %

RAP %

LOT MEAN

ADDITIVE MAT * Use Lot Mean Corrected Asphalt Content to calculate Gyratory V.M.A. %. ** % Compaction = (Road Dry Density) / (Lot Mean Maximum Specific Gravity / 10)
RA Reclaim R Right
CF Coarse Fines L Left
BS Blend C GRADATION LOT TONNAGE
Sand Centerline
SOURCE

A.C. CORRECTION FACTOR (%)


SAMPLE

C 2nd Coarse RS Right Shoulder SIEVE ANALYSIS - % PASSING (µm)


OR Other_________ LS Left TEST
MQA (QA or QC ACCEPTANCE LOT)
Shoulder NO.
TEST METHOD LANE COMMENTS
25,000 20,000 16,000 12,500 10,000 5,000 2,500 1,250 630 315 160 80
FE Filterless Extraction N Northbound
NU Nuclear S Southbound
RE Reflux W Westbound 1
FC Filter E Eastbound
Centrifuge IG 2 LOT PAVING LIMITS (km)
Ignition OR 3 FROM TO LANE MAT
Other________
4
SAMPLE SOURCE CODE LIFT 5
CO Core B Bottom Lift

TECHNOLOGISTS :
BP Behind Paver T
Top Lift CONSULTANT :
CF Cold
Feed O Other Lift 1-5 PROJECT MANAGER :
OR
LOT MEAN
RECEIVED BY :
Other
JOB MIX FORMULA *** Contractor's Representative

TOLERANCES FOR THE LOT MEAN FROM JOB MIX FORMULA ±5 ±5 ±5 ±5 ±5 ±5 ±3 ±2 ±2 - ± 1.5 DATE REC'D TIME
MAXIMUM RANGE BETWEEN INDIVIDUAL TEST RESULTS IN A LOT 10 10 10 10 10 10 6 5 4 - 3 *** Signature indicates receipt of data on the date and time indicated

Revised December 2013 Appendix B.10


SUPERPAVE LOT PAVING REPORT
CONTRACT NO. PROJECT FROM LOT NO. MST DESIGN NO. DESIGN DESIGN
PROJECT NO. DENSITY 2310 AIR VOIDS (%)
4.0
xxxxxx 1 (kg/m3)

WEEK ENDING PROJECT TO MIX TYPE PIT NAME DESIGN DESIGN


CL NO. A CS ASPHALT 6.0 15.0
YY MM DD 10-C-12.5 CONTENT (%) VMA (%)

PAVING CONTRACTOR QA CONSULTANT TARGET DESIGN


yy mm dd HW XX xx ASPHALT 6.0 LIFT 30
MAT 6-78S/12 CONTENT (%) THICKNESS (mm)
GYRATORY FORMED SPECIMENS MIX LOT PAVEMENT AND COMPACTION DATA

CORE MOISTURE
DENSITY * VOLUMETRICS CORRECTE
**

THICKNESS
(% of Gmm) @ Ndesign D ASPHALT
DATE LAID Maximum

SEGMENT #
DENSITY

LOCATION

CORE
CONTENT CORE
Specific STATION DENSITY AIR VOIDS

+ OR -

LANE
@Ndesign

LIFT
AIR Gravity DENSITY
Cini Cdes Cmax V.M.A. V.F.A. % of Gmm
VOIDS
(T.M. _____)
(dd-mmm-yyyy) (kg/m )
3
(%) (%) (%) Gmm (%) (00+000) (mm) (kg/m3) (%) (%) (%)

1-Jan-2013 2308 84.0 92.9 94.2 7.2 16.4 75.0 2.488 5.53 1 12+000 - 4.3 S B 45 2173 12.7 88.2 1.54

SAMPLE
LOT 2329 86.0 95.6 97.2 4.4 15.6 75.0 2.436 6.01 2 12+800 - 2.0 S B 50 2181 12.3 88.5 1.40
AGGREGATE
PROPORTIONS 2346 85.5 95.4 97.0 4.6 15.0 74.0 2.458 5.60 3 23+450 - 0.7 S B 52 2190 12.0 88.9 1.48
COARSE
AGG. % 54 2330 84.8 94.2 95.7 5.8 15.6 73.0 2.474 5.28 4 12+155 - 4.4 S B 48 2208 11.3 89.6 1.03
MF %
23 5.38 5 13+456 - 2.5 S B 47 2238 10.0 90.8 0.66
BLEND
SAND % 16
RAP %
7

2328 85.1 94.5 96.0 5.5 15.7 74.3 2.464 5.56 LOT MEAN 48 2198 11.7 89.2 1.22

ADDITIVE MAT * Use Lot Mean Corrected Asphalt Content to calculate Gyratory V.M.A. %. ** % Compaction = (Road Dry Density) / (Lot Mean Maximum Specific Gravity / 10)
RA Reclaim R Right
CF Coarse Fines L Left
BS Blend C GRADATION LOT TONNAGE 2000.00
Sand Centerline
-0.71
SOURCE

A.C. CORRECTION FACTOR (%)


SAMPLE

C 2nd Coarse RS Right Shoulder SIEVE ANALYSIS - % PASSING (µm)


TEST
OR Other_________ LS Left
NO.
MQA (QA or QC ACCEPTANCE LOT) QA
Shoulder
TEST METHOD LANE COMMENTS
25,000 20,000 16,000 12,500 10,000 5,000 2,500 1,250 630 315 160 80
FE Filterless Extraction N Northbound STD. SPECIFICATIONS FOR HWY CONSTRUCTION - EDITION 14, 2010
NU Nuclear S Southbound
RE Reflux W Westbound 1 CO 100 100 100 95 83 50 33 25 19 14 9.4 5.7
FC Filter E Eastbound
Centrifuge IG 2 CO 100 100 100 96 85 51 33 24 18 14 8.9 5.4 LOT PAVING LIMITS (km)
Ignition OR 3 CO 100 100 100 96 85 54 35 25 19 14 9.7 6.1 FROM TO LANE MAT
Other________
4 CO 100 100 100 96 84 51 33 24 18 14 9.0 5.6 10+000 11+000 E R
SAMPLE SOURCE CODE LIFT 5 CO 100 100 100 96 82 49 32 23 18 14 8.8 5.4
CO Core B Bottom Lift

TECHNOLOGISTS :
BP Behind Paver T
Top Lift CONSULTANT :
CF Cold
Feed O Other Lift 1-5 100 100 100 96 84 51 33 24 18 14 9.2 5.6 PROJECT MANAGER :
OR
LOT MEAN
RECEIVED BY :
Other
*** Contractor's Representative
JOB MIX FORMULA 100 100 100 96 82 49 30 20 15 10 6.2 3.9
TOLERANCES FOR THE LOT MEAN FROM JOB MIX FORMULA ±5 ±5 ±5 ±5 ±5 ±3 ±3 ±2 ±2 - ± 1.5 DATE REC'D TIME
MAXIMUM RANGE BETWEEN INDIVIDUAL TEST RESULTS IN A LOT 10 10 10 10 10 10 6 5 4 - 3 *** Signature indicates receipt of data on the date and time indicated

Revised December 2013 Appendix B.10

You might also like