You are on page 1of 1

FLORIDA DEPARTMENT OF TRANSPORTATION

STORM DRAIN TABULATION FORM


Financial Project Identification: County: Network: Prepared: Date:
Description: Organization: State Road: Checked: Date:
STRUCTURE NO.

PIPE NOTES
DRAINAGE
HYDRAULIC GRADIENT SLOPE (%) AND

TIME OF FLOW IN SECTION (min)


SIZE

TIME OF CONCENTRATION (min)


LOCATION AREA (Acres)
(in.) REMARKS

VELOCITY

FULL FLOW CAPACITY (cfs) *


OF

ACTUAL
UPPER END C= ** CROWN ZONE:

NUMBER OF BARRELS *
HYD. GRAD.

(fps)
HGL CLEARANCE (ft.) *
INLET ELEVATION (ft.)
C= ** FLOWLINE RISE
TYPE OF STRUCTURE

FREQUENCY (Yrs):

MINOR LOSSES (ft.) *


BASE FLOW (cfs) *

TOTAL FLOW (cfs)


ALIGNMENT NAME UPPER C= ** MANNING'S "n":

INTENSITY (in/hr)
PHYSICAL

ELEVATION (ft.)

ELEVATION (ft.)
TAILWATER EL (ft):
DISTANCE (ft.)

LOWER END
TOTAL (C*A)
LENGTH (ft.)

UPPER END
SUB-TOTAL
INCREMENT

PHYSICAL
VELOCITY
STATION LOWER TOTAL SPAN MIN. PHYS.

FALL
(C*A)

(fps)
SIDE

(ft.)
* Denotes optional information.
** A composite runoff coefficient may be shown in lieu of individual C-values, provided the composite C calculations are included in the drainage documentation.

You might also like