Professional Documents
Culture Documents
PIPE NOTES
DRAINAGE
HYDRAULIC GRADIENT SLOPE (%) AND
VELOCITY
ACTUAL
UPPER END C= ** CROWN ZONE:
NUMBER OF BARRELS *
HYD. GRAD.
(fps)
HGL CLEARANCE (ft.) *
INLET ELEVATION (ft.)
C= ** FLOWLINE RISE
TYPE OF STRUCTURE
FREQUENCY (Yrs):
INTENSITY (in/hr)
PHYSICAL
ELEVATION (ft.)
ELEVATION (ft.)
TAILWATER EL (ft):
DISTANCE (ft.)
LOWER END
TOTAL (C*A)
LENGTH (ft.)
UPPER END
SUB-TOTAL
INCREMENT
PHYSICAL
VELOCITY
STATION LOWER TOTAL SPAN MIN. PHYS.
FALL
(C*A)
(fps)
SIDE
(ft.)
* Denotes optional information.
** A composite runoff coefficient may be shown in lieu of individual C-values, provided the composite C calculations are included in the drainage documentation.