Professional Documents
Culture Documents
TO PANIAYALA A1 A2 TO BARODAMEO
"A"
RCC T- BEAM
FX FR
FD.L.
LONGITUDINAL ELEVATION
A1 A2
EARTH FACE
US
REFER SEPARATE
DRAWING FOR DETAIL
DS
1
HALF TOP HALF BOTTOM
PLAN
G.L.
DETAIL - "A"
FD.L.
SECTION AT 1-1
TO PANIAYALA TO BARODAMEO
Proposed Bridge
Chainage 43+689
Type Minor Bridge (RCC T-Beam)
Span/Len./
width(m) 1x25.0/2x14.5
43+600
43+700
43+800
DETAIL - "C"
KEY PLAN
F.R.L F.R.L
D/S U/S
C INVERT LEVEL
296.645
U/S
2 TO PANIYALA TO BARODAMEO
F.R.L= 302.050 B
A
INVERT LEVEL
296.645
DETAIL - A
SECTION 1-1
EARTH FACE
REFER SEPARATE
DRAWING FOR DETAIL
1 1
TO PANIYALA TO BARODAMEO
Proposed Bridge
DETAIL - C Chainage 45+210
DETAIL OF RETAINING WALL
Type Minor Bridge (RCC Box)
Span/Len./
width(m) 1x8.0/2x14.5
45+100
45+200
45+300
TYPICAL CROSS SECTION OF
CURTAIN WALL TYPE-I (D/S)
F.R.L F.R.L
D/S U/S
C INVERT LEVEL
292.826
DETAIL - B
SECTION 2-2
TO PANIYALA TO BARODAMEO
U/S
2
F.R.L= 297.937 B
A
INVERT LEVEL
292.826
SECTION 1-1
DETAIL - C
EP EP
INVERT LEVEL 292.826
EARTH FACE
D/S
2
PLAN REFER SEPARATE
DRAWING FOR DETAIL
47+400
47+300
TYPICAL CROSS SECTION OF
CURTAIN WALL TYPE-I (D/S) DETAIL - A DETAIL OF RETAINING WALL
KEY PLAN
CLIENT:- CONSULTANT:- PROJECT:- SCALE :- DWG TITLE:- DRAWING No : SHEET 1 OF 1
"A" "B"
F.R.L.
FX FR
G.L.
FD.L.
FD.L.
FD.L.
LONGITUDINAL ELEVATION
FORMATION LEVEL
GROUND LEVEL
CHAINAGE (m)
A1 P1 P2 P3 A2
"C"
PLAN
G.L. G.L.
R.C.C. GIRDER DETAIL R.C.C. GIRDER DETAIL
END SUPPORT SECTION MID SECTION
FD.L.
SECTION AT 1-1
EARTH FACE
F.R.L. F.R.L.
REFER SEPARATE
DRAWING FOR DETAIL
FD.L. FD.L.
SECTION AT 2-2
·
·
·
DETAIL - "A"
DETAIL - "B"
TO PANIAYALA TO BARODAMEO
Proposed Bridge
NOTATION
Chainage 49+091
F.R.L. :-
Type Major Bridge (RCC T-Beam)
G.L. :-
Span/Len./
width(m) 4x25.0/2x14.5 FD.L. :-
DETAIL - "C"
49+100
49+200
49+000
KEY PLAN
"A" "B"
F.R.L.
RB2 RB4 RB4 RB2
FX FR
G.L.
FD.L.
FD.L.
LONGITUDINAL ELEVATION
FORMATION LEVEL
GROUND LEVEL
CHAINAGE (m)
A1 P1 P2 A2
1 2
RB1 RB3
RB2
RB4
RB2
RB2
RB2
RB4
DIRECTION
RB1 RB3
TRAFFIC
RB1 RB3
RB2
RB4
"C"
RB2
RB2
RB2
RB4
RB1 RB3
1 2
HALF TOP HALF BOTTOM
PLAN
G.L.
R.C.C. GIRDER DETAIL R.C.C. GIRDER DETAIL
END SUPPORT SECTION MID SECTION
FD.L.
SECTION AT 1-1
EARTH FACE
F.R.L. F.R.L.
REFER SEPARATE
DRAWING FOR DETAIL
RB2 RB2
RB2 RB2
G.L. G.L.
FD.L. FD.L.
SECTION AT 2-2
·
·
·
DETAIL - "A"
DETAIL - "B"
TO PANIAYALA TO BARODAMEO
NOTATION
Proposed Bridge
Chainage 49+835 F.R.L. :-
G.L. :-
Type Major Bridge (RCC T-Beam) FD.L. :-
Span/Len./
width(m) 3x25.0/2x14.5
DETAIL - "C"
49+900
49+800
KEY PLAN
F.R.L F.R.L
SECTION 2-2
U/S
3 TO PANIYALA TO BARODAMEO
F.R.L= 286.865 C B
A
INVERT LEVEL
281.590
SECTION 1-1
EARTH FACE
REFER SEPARATE
DRAWING FOR DETAIL
1 1
DETAIL - C
DETAIL - A DETAIL - D
DETAIL OF RETAINING WALL
TO PANIYALA TO BARODAMEO
Proposed Bridge
Chainage 51+183
Type Minor Bridge (RCC Box)
Span/Len./
width(m) 2x8.0/2x14.5
51+200
51+300
51+100
TYPICAL CROSS SECTION OF TYPICAL CROSS SECTION OF
CURTAIN WALL TYPE-I (D/S) CURTAIN WALL TYPE-II (U/S)
KEY PLAN
CLIENT:- CONSULTANT:- PROJECT:- SCALE :- DWG TITLE:- DRAWING No : SHEET 1 OF 1
F.R.L
F.R.L:
B C D/S
U/S
INVERT LEVEL:
A INVERT LEVEL
D
U/S
4
DETAIL 'A'
1 4 1
EARTH FACE
REFER SEPARATE
DRAWING FOR DETAIL
TO PANIYALA TO BARODAMEO
SECTION 3-3 Proposed SVUP
Chainage 51+303
Type (RCC Box)
Span/Len./
width(m) 1x7.0/2x14.5/4.0
D/S
1
2
X 1
- DETAIL 'D'
(TRAFFIC DIRECTION)
DETAIL 'B' PLAN
Diverted Canal Diverted Canal
Diverted Road
51+400
51+300
Proposed Bridge
Chainage 51+303A
Type Minor Bridge (RCC BOX)
Span/Len./
TYPICAL CROSS SECTION OF width(m) 2x5.0/8.0
TYPICAL CROSS SECTION OF CURTAIN WALL TYPE-II (U/S)
DETAIL 'C' CURTAIN WALL TYPE-I (D/S)
KEY PLAN
CLIENT:- CONSULTANT:- PROJECT:- SCALE :- DWG TITLE:- DRAWING No : SHEET 1 OF 1
A B
PSC GIRDER PSC GIRDER PSC GIRDER PSC GIRDER PSC GIRDER
RB2 RB3 RB3 RB3 RB3
·
·
·
LONGITUDINAL ELEVATION
FORMATION LEVEL
GROUND LEVEL
CHAINAGE (m)
TO PANIYALA A1 P1 P2 P3 P4
1
2
RB1 RB1
RB2
RB1 RB1
RB3
RB1 RB1
RB1 RB1
RB3
RB3
RB3
RB2
RB3
RB3
RB1 RB1
RB3
RB3
RB1 RB1
RB1 RB1
RB1 RB1
RB1 RB1
RB2
RB1 RB1
RB3
RB1 RB1
RB1 RB1
RB3
RB3
RB3
RB2
RB3
RB3
1 RB1 RB1
RB3
RB3
RB1 RB1
2 RB1 RB1
RB1 RB1
EARTH FACE
DETAIL - C
PSC GIRDER PSC GIRDER PSC GIRDER PSC GIRDER PSC GIRDER
RB3 RB3 RB3 RB3 RB3 RB2
RB3
LONGITUDINAL ELEVATION
FORMATION LEVEL
GROUND LEVEL
CHAINAGE (m)
P4 P5 P6 P7 P8 A2
TO BARODAMEO
RB1 RB1
RB3
RB3
RB1 RB1
RB1 RB1
RB3
RB3
RB1 RB1
Proposed Bridge
Chainage 51+918
SECTION AT 1-1
Type Major Bridge (PSC I-Beam)
Span/Len./
width(m)
9x35.0/2x14.5
52+100
52+000
51+800
51+900
RB1 RB1
KEY PLAN
SECTION AT 2-2
"A" "B"
F.R.L. F.R.L.
RB2 RB4 RB4 RB4 RB2
FX FR
G.L.
FD.L.
FD.L.
FD.L.
LONGITUDINAL ELEVATION
FORMATION LEVEL
GROUND LEVEL
CHAINAGE (m)
A1 P1 P2 P3 A2
1 2
RB1 RB3
RB2
RB4
RB2
RB2
RB2
RB4
DIRECTION
RB1 RB3
TRAFFIC
RB1 RB3
RB2
RB4
"C"
RB2
RB2
RB2
RB4
RB1 RB3
PLAN
FD.L.
SECTION AT 1-1
EARTH FACE
REFER SEPARATE
DRAWING FOR DETAIL
F.R.L. F.R.L.
RB2 RB2
RB2 RB2
G.L. G.L.
FD.L. FD.L.
SECTION AT 2-2
·
·
·
DETAIL - "A"
DETAIL - "B"
TO PANIAYALA TO BARODAMEO
Proposed Bridge
Chainage 53+225 NOTATION
Type Major Bridge (RCC T-Beam) F.R.L. :-
Span/Len./
width(m) 4x20.0/2x14.5 G.L. :-
FD.L. :-
DETAIL - "C"
53+200
53+300
53+100
KEY PLAN
TO PANIYALA A1 P1 A2 TO BARODAMEO
A B
AT SUPPORT AT MID SPAN
CROSS SECTION OF PRECAST
PSC GIRDER
EARTH FACE
REFER SEPARATE
DRAWING FOR DETAIL
LONGITUDINAL ELEVATION
A1 P1 A2
1
2
1
2
DETAIL - C
TO PANIYALA TO BARODAMEO
SECTION AT 1-1
RB1 RB1
KEY PLAN
SECTION AT 2-2
TO PANIYALA
A B PSC I GIRDER
PSC I GIRDER PSC I GIRDER RB3
RB3
PSC I GIRDER
RB3
RB3
RB2
PSC I GIRDER RB3
A1 P1 P2 P3 P4 P5 P6
FINISHED ROAD
LEVEL
EXISTING
GROUND LEVEL
CHAINAGE(m)
C/C OF EXP. GAP
A1
TO PA P1
NIYAL P6
A
P2 P5
P3 P4
1
1
HALF
PLAN 2
AT TO
P
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
DY. CE/CON/DESIGN
AS SHOWN R0
JANUARY 2022
N.W.RLY. JAIPUR
XEN./CON./DESIGN DRAWN BY DESIGNED BY CHECKED BY
N.W.RLY. JAIPUR
C D
PSC I GIRDER RB3
PSC I GIRDER RB3 PSC I GIRDER RB3 PSC I GIRDER RCC T BEAM
RB3
FINISHED ROAD
LEVEL
EXISTING
GROUND LEVEL
CHAINAGE(m)
C/C OF EXP. GAP
P6
℄ OF EX. TRACK
RLY. BOUNDARY
P7
EP-65/21
TO PARISAL
℄ OF EX. TRACK
EP-65/22
P8 P9 P10 P11 P12
RETAINING WALL
53225
52694
4
3
EP-65/23
EP-65/24
55175
JUNCTION
TO ALWAR
RLY. BOUNDARY
3 4 EP-65/25
HALF PLAN AT TOP
NORTH WESTERN DRG. NO: CPC/P-152/RJ/CH.56+519/ROB-GAD/01 (SHEET 2 OF 7)
PLAN
℄ OF TRACK 1° (SCALE 1:400)
RAILWAY
PANIYALA - ALWAR- BARODAMEO
CLIENT:- National Highways Authority
of India
(Ministry of Road, Transport & Highways, Govt. of India)
(INTER CORRIDOR ROUTE) ROB IN BETWEEN
ALWAR JN. - PARISAL STATIONS IN JAIPUR DWG TITLE :- GENERAL ARRANGEMENT DRAWING
DIVISION NORTH WESTERN RAILWAY JAIPUR (SPAN 10x35.0M+1x25.0M+1X45.480M+1X25.0+10X35.0)
(AT RLY. KM. EP NO.- 65/21 - 65/25)
℄ OF ROAD CBE
N.W.RLY. JAIPUR
DY.CBE/DESIGN
PROJECT:-
PSC I GIRDER, RCC T BEAM & BOW STRING
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
DY. CE/CON/DESIGN
AS SHOWN R0
JANUARY 2022
N.W.RLY. JAIPUR
XEN./CON./DESIGN DRAWN BY DESIGNED BY CHECKED BY
N.W.RLY. JAIPUR
FINISHED ROAD
LEVEL
EXISTING
GROUND LEVEL
CHAINAGE(m)
C/C OF EXP. GAP
℄ OF EX. TRACK
RLY. BOUNDARY
EP-65/21
TO PARISAL
℄ OF EX. TRACK
EP-65/22
4
EP-65/23
EP-65/24
55175
JUNCTION
TO ALWAR
RLY. BOUNDARY
PLAN
(SCALE 1:400)
℄ OF TRACK 1°
DRG. NO: CPC/P-152/RJ/CH.56+519/ROB-GAD/01
NORTH WESTERN (SHEET 3 OF 7)
CLIENT:- National Highways Authority
RAILWAY
of India
℄ OF ROAD PANIYALA - ALWAR- BARODAMEO
(INTER CORRIDOR ROUTE) ROB IN BETWEEN
ALWAR JN. - PARISAL STATIONS IN JAIPUR
DIVISION NORTH WESTERN RAILWAY JAIPUR
DWG TITLE :-
(Ministry of Road, Transport & Highways, Govt. of India)
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
DY. CE/CON/DESIGN
AS SHOWN R0
JANUARY 2022
N.W.RLY. JAIPUR
XEN./CON./DESIGN DRAWN BY DESIGNED BY CHECKED BY
N.W.RLY. JAIPUR
FINISHED ROAD
LEVEL
EXISTING
GROUND LEVEL
CHAINAGE(m)
C/C OF EXP. GAP
P18
P19
P20
P21
P22
A2
TO B
ARO
DAM
E O
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
DY. CE/CON/DESIGN
AS SHOWN R0
JANUARY 2022
N.W.RLY. JAIPUR
XEN./CON./DESIGN DRAWN BY DESIGNED BY CHECKED BY
N.W.RLY. JAIPUR
F.R.L F.R.L
RB3 RB2
RB3 RB2
RB1 RB1 RB1 RB1
RB2 RB2
RB2 RB2
RB1 RB1 RB1 RB1
SECTION AT 2-2
SECTION AT 1-1
EARTH FACE
REFER SEPARATE
DRAWING FOR DETAIL
END SUPPORT SECTION MID SECTION RAILWAY CLIENT:- National Highways Authority
of India
PANIYALA - ALWAR- BARODAMEO (Ministry of Road, Transport & Highways, Govt. of India)
(INTER CORRIDOR ROUTE) ROB IN BETWEEN
ALWAR JN. - PARISAL STATIONS IN JAIPUR DWG TITLE :- GENERAL ARRANGEMENT DRAWING
DIVISION NORTH WESTERN RAILWAY JAIPUR (SPAN 10x35.0M+1x25.0M+1X45.480M+1X25.0+10X35.0)
(AT RLY. KM. EP NO.- 65/21 - 65/25)
PSC I GIRDER, RCC T BEAM & BOW STRING
CBE
N.W.RLY. JAIPUR
PROJECT:-
PREPARATION OF DETAILED PROJECT REPORT (DPR) FOR DEVELOPMENT OF
DY.CBE/DESIGN ECONOMIC CORRIDORS, INTER-CORRIDORS, FEEDER ROUTES AND NATIONAL
N.W.RLY. JAIPUR CORRIDORS TO IMPROVE THE EFFICIENCY OF FREIGHT MOVEMENT IN INDIA
XEN/BRIDGE/DESIGN UNDER BHARATMALA PARIYOJANA (LOT-6/PACKAGE-4) FOR
N.W.RLY. JAIPUR PANIYALA - ALWAR- BARODAMEO (INTER CORRIDOR ROUTE) NH CH.56+519
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
DY. CE/CON/DESIGN
AS SHOWN R0
JANUARY 2022
N.W.RLY. JAIPUR
XEN./CON./DESIGN DRAWN BY DESIGNED BY CHECKED BY
DRAWING NO.
Chaitanya Projects Consultancy Pvt. Ltd.
C-5, 2ND FLOOR, R.K.TOWER, PLOT NO.- 21-22,
PROJECT DIRECTOR SECTOR- 4,VAISHALI, GHAZIABAD
NHAI PH.: 0120- 4120472, FAX: 0120-4110472
NOTE :-
DETAIL - C DETAIL - B
DETAIL - C DETAIL-D
(SCALE 1:100)
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
DY. CE/CON/DESIGN
AS SHOWN R0
JANUARY 2022
N.W.RLY. JAIPUR
XEN./CON./DESIGN DRAWN BY DESIGNED BY CHECKED BY
N.W.RLY. JAIPUR
NORTH
N IYA
LA
EP-65/21
EP-65/22
P1
TO PARISAL
P2
P3
53225
P4
52694
56+ P5 P14 P15 P16
P6 P12 P13
100 P7 P8 P9 P10 P11
10727
16759
15899
15033
11076
11909
EP-65/23
EP-65/24
16294
56+2
15434
RLY. BOUNDARY
RETAINING WALL
00
55175
56+300
56+600
56+500
56+400
EP-65/25
TO ALWAR
JUNCTION
EP-65/27
NORTH
P16 P17 P18
P19
P20
P21
P22
A2
56+700
TO B
56+800
A ROD
AME
O
56+90
RAILWAY
of India
PANIYALA - ALWAR- BARODAMEO (Ministry of Road, Transport & Highways, Govt. of India)
(INTER CORRIDOR ROUTE) ROB IN BETWEEN
5
ALWAR JN. - PARISAL STATIONS IN JAIPUR DWG TITLE :- GENERAL ARRANGEMENT DRAWING
DIVISION NORTH WESTERN RAILWAY JAIPUR (SPAN 10x35.0M+1x25.0M+1X45.480M+1X25.0+10X35.0)
(AT RLY. KM. EP NO.- 65/21 - 65/25)
7+
CE/CON.- II
N.W.RLY. JAIPUR SCALE: DATED . REVISION.
0
DY. CE/CON/DESIGN
AS SHOWN R0
KEY PLAN N.W.RLY. JAIPUR
DRAWN BY
JANUARY 2022
DESIGNED BY CHECKED BY
0
XEN./CON./DESIGN
N.W.RLY. JAIPUR
C.R.T.L.
LONGITUDINAL ELEVATION
A1 A2
RB1
RB2
RB2
DIRECTION
DETAIL - B
TRAFFIC
RB1
NOTATION
RB2
F.R.L. :-
RB1
G.L. :-
FD.L. :-
1 HALF TOP PLAN HALF BOTTOM PLAN
PLAN
TO PANIYALA TO BARODAMEO
Proposed Interchange
Chainage 60+374
600
Type
50
Interchange (PSC I-Beam)
0
Span/Len./
width(m) 1x40.0/2x18.0/5.5
0
600
100
0
0
0
10
500
60+200
60+300
60+400
60+500
KEY PLAN
LEVEL - 95480 m
TO PANIYALA
A B C D
PSC I GIRDER PSC I GIRDER RB3
PSC I GIRDER RB3
PSC I GIRDER RB3
RCC T BEAM
RB3
RB2
FINISHED ROAD
LEVEL
EXISTING
GROUND LEVEL
CHAINAGE(m)
C/C OF EXP. GAP
℄ OF EX. TR
7°
℄ OF EX. TR
RLY. B
RLY. BO
EP-1512/1
OF TRACK
℄ OF EX. TR
TO OOT
OUND
EP-1512/1
UNDARY
A1 P1 P2 P3 P4 P5 P6
ACK
ACK
ARY
AR
℄ OF ROAD
W
ACK
AR
3R
TO PANIYALA
28053
26516
4
1 2 3
77)
9803 (98
8500)
28288 (2
7829
9658
RLY. B
EP-1512/1
RLY. BO
1 2 3 4
TO GAZ
EP-1512/1
OUND
UNDARY
IKA
A
4AR
RY
HALF PLAN AT TOP HALF PLAN AT TOP
4R
PLAN
(SCALE 1:400) DRG. NO: CPC/P-152/RJ/CH.61+814/ROB-GAD/01 (SHEET 1 OF 5)
FINISHED ROAD
LEVEL
EXISTING
GROUND LEVEL
CHAINAGE(m)
C/C OF EXP. GAP