LEGEND

A B
WALL MOUNTED FAN COIL UNIT

EQUIPMENT DESIGNATION LOT7-A


FIREWALL 3 1
1 2
AIR COOLED CONDENSING UNIT DN TO
GRD FLR.
UP TO

FIREWALL
3RD FLR.
ACCU
LANDING

FCU FAN COIL UNIT DN TO


MEZZ.

2 2

L
NOT TO SCALE

AL
NTS

EW
2

LOT7-C
FIR
REFRIGERANT PIPES

GENERAL NOTES:

50
3 3

64
A. DESIGN DOCUMENTS

D-4
TOI

PS
1. THE DESIGN DOCUMENTS CONSIST OF COMPLETE SET OF DRAWINGS,
SPECIFICATION, NOTES AS WELL AS ALL RELATED DOCUMENTS 4

3,
REFERRED TO WITHIN THIS DRAWING AND NOTES.

K
UP
4 4

OC

L
2. THE GENERAL NOTES AND GENERAL CONDITIONS DEFINED THE RULES

AL
EW
DN TO

BL
GRD FLR.
AND CONDITION GOVERNING THE WORK.

FIR
3. THE SPECIFICATION WHERE INCLUDED AS PART OF THE DESIGN

T6
DOCUMENTS, PROVIDED MORE DETAILED BOTH GENERAL AND SPECIFIC

LO
INFORMATION REGARDING THE TYPES AND QUALITIES OF MATERIALS
AND EQUIPMENT TO BE USED IN THE EXECUTION OF THE WORK. NOTE: GEN. CONTRACTOR MUST
PROVIDE DRAIN PIPE FOR ACU

4. THE DRAWING SHOW BOTH GRAPHICALLYAND BY NOTATION THE


1
PHYSICAL CHARACTERISTIC AND REQUIREMENTS OF THE WORK,
INCLUDING, DESCRIPTIONS OF MATERIAL, COLORS, SYSTEM OF THE A B THIRD FLOOR LINE
FIRE EXIT LADDER

WORKS. 270

70
5. IN ALL CASES WHERE THE DESIGN DRAWING MAY DISAGREE WITH 70 70
125

THEMSELVES, THE CONTRACTOR IS TO PRICE THE MOST EXPENSIVE


790

COMBINATION OF QUALITY AND QUANTITY, WITH CLARIFICATION


REQUESTED FROM THE DESIGNER/OWNER AFTER THE CONTRACT HAS
BEEN APPROVED. SECOND FLOOR LINE

6. L.M. PARAGSA DESIGN AND CONSULTANCY SERVICES SHALL BE THE


PRIMARY SOURCE OF INFORMATION REGARDING THESE DESIGN A B
DRAWING AND SPECIFICATION.
B. MECHANICAL NOTES:
LOT7-A
1. ALL MECHANICAL WORKS SHALL BE DONE IN ACCORDANCE WITH THE 3 1
FIREWALL
LATEST REQUIREMENTS OF THE PHILIPPINES NATIONAL BUILDING 1 2
CODE, PSME CODE, PSVARE ASHRAE, SMACNA, FIRE CODE OF THE

FIREWALL
UP TO
RD
PHILIPPINES AND OTHER REGULATION OF THE LOCAL MUNICIPALITY.
2. THE TOTAL SCOPE OF WORKS SHALL INCLUDE ALL WORKS DESCRIBED DN TO
2ND
IN THE PLANS LISTED IN THE TECHNICAL SPECIFICATIONS FOR 2 1
2
MECHANICAL WORKS.

LOT7-C
3. THE WORKS SHALL BE EXECUTED IN CLOSED COORDINATION WITH ALL
OTHER TRADES.
4. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS, EQUIPMENT
CATALOG, SAMPLES OF ALL THE MATERIAL TO BE USED BEFORE

50
EXECUTION OF THE WORKS.

64
3 3

-4
5. THE CONTRACTOR OR SUPPLIER SHALL INSTALL ALL MATERIAL AND

SD
EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S

,P
RECOMMENDATION. TOI
4

K3
6. ALL PIPE AND DUCT PENETRATION SHALL BE CAULKED WITH FIRE
SEALANT.

OC
4 E) 4

L
7. ALL EQUIPMENT REST ON SLAB AND CEILING SHALL BE PROVIDED WITH

AL
BL
B
ID

EW
W
0.00

FIR
DN
VIBRATION ISOLATOR TO PREVENT VIBRATION AND NOISE IT
EX

T6
FIR
E ( 1
TRANSMISION.
4 6450
-

LO
8. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CONCRETE PAD
2, PSD
AND SUPPORT OF ALL MECHANICAL EQUIPMENT. O T
D L
9. THE CONTRACTOR SHALL ARRANGED THE PIPING, DUCTING AND
R OA
EQUIPMENT TO HAVE EASY ACCESS FOR REMOVING, CLEANING AND
1
SEVICING WITHOUT DISMANTLING THE SYSTEM.
10. ALL POWER WIRING UP TO SPLICE BOX SHALL BE THE ELECTRICAL A B
CONTRACTOR FROM SPLICE BOX TO THE EQUIPMENT BY MECHANICAL
CONTRACTOR.
11. PROVIDE AND INSTALL CONTROLS AND CONTROL WIRINGS FOR ALL
AIRCONDITIONING EQUIPMENT.
12. PROVIDE THERMOSTAT TO ALL INDOOR UNITS.
13. PROVIDE SEPARATE CONDENSER DRAIN RISER.

( WITH MEZZANINE & ROOFDECK )

ADDRESS: METROPOLIS SUBD., PIT-OS, CEBU CITY