Professional Documents
Culture Documents
at 2:00 p.m.
Administrative Matters
1)Covid cases
- RD Ursal informed that Ms. Dianne Amigo and Mr.
Jeffrey Amigo are positive confirmed Covid
patient.
ESTIMATED AMOUNT
PARTICULARS
2022 2023 2024
1. Construction of Day Care Center at COA Compound, COA Regional Office No. XI 1,200,000.00
Construction of Records Building for RAEMU (2-Storey) at COA Compound, COA Regional
2. 9,500,000.00
Office
3. Construction of Records Building for RAEMU (4-Storey) at Bago Oshiro 40,000,000.00
4. Construction of Parking Pavement and Road Concreting at COA Compound, COA Regional Office 1,280,000.00
5. Furniture, Fixtures and Equipment in the COA Regional Office No. XI 5,000,000.00 5,000,000.00 5,000,000.00
6. Office Partitions and Workstations in COA Regional Office XI 6,000,000.00
7. Supply and Installation of Walk-in Steel Vault in COA Regional Office No. XI 2,000,000.00
Replacement of Air-conditioning Units with more than Ten (10) years of usage in the COA Regional
8. 2,000,000.00
Office No. XI
9. Replacement of Generator Set - 500 KVA in COA Regional Office No. XI 2,700,000.00
10. Supply and Installation of Solar Power System in COA Regional Office No. XI 1,500,000.00
11. Installation of Fire Detection and Alarm System, Sprinkler System in COA Regional Office No. XI 2,500,000.00
12. Installation of Fire Detection and Alarm System, Sprinkler System - Annex Building 1,000,000.00
6)LGAM
8)Others
Prepared by:
LUZVIMIND C. PONCE
OIC-SC, ATFS