Professional Documents
Culture Documents
: Revision :
1 1-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 17.65 KN
LL = 7.85 KN/m
Lr = 9.00 KN
Lr = 4.00 KN/m
DEAD LOAD:
Mu = Wu L2 L = 4.00 Meters
;
8
Mu = 50.09 KN-m
Rn = Mu Ø = 0.90
;
Ø b d2 b = 250.00 mm
d = 360.00 mm
Rn = 1.7177 Mpa
Job No. : Sheet No. : Revision :
1 2-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
ρ = 0.0066
ρmin = 1.4 / fy
ρmin = 0.0051
ρь = 0.0373
300 mm
250
ρmax = 0.75 ρь
ρmax = 0.0279
3 - 16 mm Ø RSB Top Bars
since ► ρmin < ρ < ρmax
500 mm
Reinforcement:
T= C
As fy = 0.85 fc' ab
a= As fy = 228,079.63 = 51.90 mm
0.85 fc' b 4,394.50
Mu = Ø As fy (d - a/2)
= 68.57 x 106 N-mm
Mu = 68.57 KN-m > 50.09 KN-m (SAFE) ♦■♦ DESIGN OK!
Job No. : Sheet No. : Revision :
1 3-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Wu = 25.04 KN
L = 4.00 m
d = 360.00 mm
Vu = 50.09 - 9.02
Vu = 41.07 KN = 41072.09 Newton
Vc = 1
fc' xbd
6
Vc = 68212.9 Newton
Ø Vc = 57981.0 Newton
Ø Vc
= 28990.48 Newton = 28.99 KN
2
Vu > Ø Vc
2
41.07 > 28.99 ( It needs web reinforcement)
Vs = Vu
- Vc
Ø
Vs = -19892.79 Newton
S = Av fy d
Vs
Av = 2 Õ d2
= 157.08 mm 2
4
S = -781.7346 mm
Use Max. S = d = 180.00 mm
2
Note: Use Stirrups Spacing : 3@0.05, 3@0.10, 3@0.15,
and rest @ Every 0.20 m On Center for much Safer Design
TRIBUTARY AREA
Revision :
APPROVED BY :
1 1-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 1.67 KN
LL = 1.96 KN/m
Lr = 0.85 KN
Lr = 1.00 KN/m
DEAD LOAD:
Mu = Wu L2 L = 1.00 Meters
;
8
Mu = 1.13 KN-m
Rn = Mu Ø = 0.90
;
Ø b d2 b = 200.00 mm
d = 260.00 mm
Rn = 0.0925 Mpa
Job No. : Sheet No. : Revision :
1 2-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
ρ = 0.0003
ρmin = 1.4 / fy
ρmin = 0.0051
ρь = 0.0373
250 mm
300
200
ρmax = 0.75 ρь
ρmax = 0.0279
3 - 12 mm Ø RSB Top Bars
since ► ρmin > ρ < ρmax
400 mm
Reinforcement:
T= C
As fy = 0.85 fc' ab
a= As fy = 93,305.30 = 26.54 mm
0.85 fc' b 3,515.60
Mu = Ø As fy (d - a/2)
= 20.72 x 106 N-mm
Mu = 20.72 KN-m > 1.13 KN-m (SAFE) ♦■♦ DESIGN OK!
Job No. : Sheet No. : Revision :
1 3-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Wu = 9.01 KN
L = 1.00 m
d = 260.00 mm
Vu = 4.50 - 2.34
Vu = 2.16 KN = 2161.26 Newton
Vc = 1
fc' xbd
6
Vc = 39411.9 Newton
Ø Vc = 33500.1 Newton
Ø Vc
= 16750.06 Newton = 16.75 KN
2
Vu > Ø Vc
2
2.16 > 16.75 ( It needs web reinforcement)
Vs = Vu
- Vc
Ø
Vs = -36869.24 Newton
S = Av fy d
Vs
Av = 2 Õ d2
= 157.08 mm 2
4
S = -304.6223 mm
Use Max. S = d = 130.00 mm
2
Note: Use Stirrups Spacing : 3@0.05, 3@0.10, 3@0.15,
and rest @ Every 0.20 m On Center for much Safer Design
TRIBUTARY AREA
Revision :
APPROVED BY :
1 1-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
Lr = 12.00 KN
Lr = 4.00 KN/m
DEAD LOAD:
Mu = Wu L2 L = 4.00 Meters
;
8
Mu = 24.66 KN-m
Rn = Mu Ø = 0.90
;
Ø b d2 b = 200.00 mm
d = 260.00 mm
Rn = 2.0270 Mpa
Job No. : Sheet No. : Revision :
1 2-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
ρ = 0.0079
ρmin = 1.4 / fy
ρmin = 0.0051
ρь = 0.0373
250 mm
300
200
ρmax = 0.75 ρь
ρmax = 0.0279
3 - 12 mm Ø RSB Top Bars
since ► ρmin < ρ < ρmax
400 mm
Reinforcement:
T= C
As fy = 0.85 fc' ab
a= As fy = 155,508.84 = 44.23 mm
0.85 fc' b 3,515.60
Mu = Ø As fy (d - a/2)
= 33.29 x 106 N-mm
Mu = 33.29 KN-m > 24.66 KN-m (SAFE) ♦■♦ DESIGN OK!
Job No. : Sheet No. : Revision :
1 3-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Wu = 12.33 KN
L = 4.00 m
d = 260.00 mm
Vu = 24.66 - 3.21
Vu = 21.46 KN = 21457.68 Newton
Vc = 1
fc' xbd
6
Vc = 39411.9 Newton
Ø Vc = 33500.1 Newton
Ø Vc
= 16750.06 Newton = 16.75 KN
2
Vu > Ø Vc
2
21.46 > 16.75 ( It needs web reinforcement)
Vs = Vu
- Vc
Ø
Vs = -14167.57 Newton
S = Av fy d
Vs
Av = 2 Õ d2
= 157.08 mm 2
4
S = -792.7396 mm
Use Max. S = d = 130.00 mm
2
Note: Use Stirrups Spacing : 3@0.05, 3@0.10, 3@0.15,
and rest @ Every 0.20 m On Center for much Safer Design
TRIBUTARY AREA
Revision :
APPROVED BY :
1 1-2
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 57.60 KN
Lr = 12.00 KN
DEAD LOAD:
Ø Pn = Capacity of Column
Ø Pn = 0.70 * ( 0.80 Po )
= 0.70*(0.80 * (0.85 fc' (Ag - Ast ) + Ast fy)))
Ø Pn = 1216.24 KN
since ► Ø Pn > Pu
1216.24 KN > 264.62 KN ♦■♦ DESIGN OK!
1 2-2
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Tie Reinforcement
■ minimum size
► 10 mm Ø for bar diameter ≤ 32 mm Ø
► 12 mm Ø for larger bars and bundled bars
Spacing of Ties
► 16 db = 16(16) = 256 mm
► 48 ds = 48(10) = 480 mm
► least column dimension = 200 mm
250 mm
2 - 16 mm Ø Vertical Bars
2 - 16 mm Ø Vertical Bars
400 mm
2 - 16 mm Ø Vertical Bars
2 - 16 mm Ø Vertical Bars
TRIBUTARY AREA
Revision :
APPROVED BY :
MR. & MRS. ROBERT A. MONOY
PROJECT OWNER
ADDRESS: BO. BAHAY HARI, MARILAO, BULACAN
1608.50
Job No. : Sheet No. : Revision :
1 1-2
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 38.40 KN
Lr = 8.00 KN
DEAD LOAD:
Ø Pn = Capacity of Column
Ø Pn = 0.70 * ( 0.80 Po )
= 0.70*(0.80 * (0.85 fc' (Ag - Ast ) + Ast fy)))
Ø Pn = 836.10 KN
since ► Ø Pn > Pu
836.10 KN > 106.53 KN ♦■♦ DESIGN OK!
1 2-2
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Tie Reinforcement
■ minimum size
► 10 mm Ø for bar diameter ≤ 32 mm Ø
► 12 mm Ø for larger bars and bundled bars
Spacing of Ties
► 16 db = 16(12) = 192 mm
► 48 ds = 48(10) = 480 mm
► least column dimension = 250 mm
250 mm
6 - 12 mm Ø Vertical Bars
3000 mm
TRIBUTARY AREA
Revision :
APPROVED BY :
MR. & MRS. ROBERT A. MONOY
PROJECT OWNER
ADDRESS: BO. BAHAY HARI, MARILAO, BULACAN
Job No. : Sheet No. : Revision :
1 1-2
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 24.00 KN
Lr = 5.00 KN
DEAD LOAD:
Ø Pn = Capacity of Column
Ø Pn = 0.70 * ( 0.80 Po )
= 0.70*(0.80 * (0.85 fc' (Ag - Ast ) + Ast fy)))
Ø Pn = 466.96 KN
since ► Ø Pn > Pu
466.96 KN > 73.35 KN ♦■♦ DESIGN OK!
1 2-2
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Tie Reinforcement
■ minimum size
► 10 mm Ø for bar diameter ≤ 32 mm Ø
► 12 mm Ø for larger bars and bundled bars
Spacing of Ties
► 16 db = 16(12) = 192 mm
► 48 ds = 48(10) = 480 mm
► least column dimension = 250 mm
150 mm
6 - 12 mm Ø Vertical Bars
250 mm
TRIBUTARY AREA
Revision :
APPROVED BY :
MR. & MRS. ROBERT A. MONOY
PROJECT OWNER
ADDRESS: BO. BAHAY HARI, MARILAO, BULACAN
Job No. : Sheet No. : Revision :
1 1-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 57.60 KN
DEAD LOAD:
Total Load
Required Area =
Allowable Soil Bearing Capacity
1 2-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Area = 2.25 m2
since ► Allowable Ultimate Soil Pressure > Net Ultimate Upward Soil Pressure
117.10 KPa > 114.94 Kpa ♦■♦ DESIGN OK!
0.275
1 fc'
Allowable Punching Shear, Vc =
3
►►► Use whichever is lesser
1+ 2 fc' 400.00
Vc = ; ßc = = 1.6
ßc 6 250.00
Vc = 1.71 MPa
Vc = 1 fc'
3
Vc = 1.52 MPa
Vu
Actual Punching Shear, Vn =
Ø bo d
Vn = Vu Ø = 0.85
;
Ø
Vn = 256.34 MPa
Job No. : Sheet No. : Revision :
1 3-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Vc = 397.91 KN
d = Vn
Vc bo
Reinforcement
As = ρbd ; b = 1500.00 mm
d = 275.00 mm
ρmin = 1.4 / fy
ρmin = 0.0051
As = 2100.00 mm2
FIN GD LINE
FILL FILL
VARIES
NAT GD LINE
1.50 MIN (VARIES)
STD 90°
HOOK
0.30M
75 CLEAR
.075
GRAVEL BED
2672.25 1350
6.75
402
Job No. : Sheet No. : Revision :
1 1-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
DESIGN DATA :
LOAD COMPUTATIONS :
LIVE LOAD:
LL = 38.40 KN
DEAD LOAD:
Total Load
Required Area =
Allowable Soil Bearing Capacity
1 2-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Area = 1.00 m2
since ► Allowable Ultimate Soil Pressure > Net Ultimate Upward Soil Pressure
128.26 KPa > 91.25 Kpa ♦■♦ DESIGN OK!
1 fc'
Allowable Punching Shear, Vc =
3
►►► Use whichever is lesser
1+ 2 fc' 300.00
Vc = ; ßc = = 1.2
ßc 6 250.00
Vc = 2.02 MPa
Vc = 1 fc'
3
Vc = 1.52 MPa
Vu
Actual Punching Shear, Vn =
Ø bo d
Vn = Vu Ø = 0.85
;
Ø
Vn = 80.58 MPa
Job No. : Sheet No. : Revision :
1 3-3
Engineer : Date :
Job Title : Two-Storey Apartment Type Building Checked : Date :
Location : Bo. Bahay Hari, Marilao, Bulacan Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Robert A. Monoy File : Dt/Tm :
Vc = 227.38 KN
d = Vn
Vc bo
Reinforcement
As = ρbd ; b = 1000.00 mm
d = 225.00 mm
ρmin = 1.4 / fy
ρmin = 0.0051
As = 1145.45 mm2
FIN GD LINE
FILL FILL
VARIES
NAT GD LINE
1.50 MIN (VARIES)
STD 90°
HOOK
0.30M
75 CLEAR
.075
GRAVEL BED
2672.25 1350
6.75
402
AP E X L IN E OF ROOF
2 .7 0
6 .1 0
TOP OF BE AM (MAS TER BEDROOM)
3 .0 0
1 1-4
F
12
. 4 00 . 8. 4 6 0
FFL (MAS TER BEDROOM)
1 .2 6 FIN . GR AD E L INE
FFL ( KITCHEN)
N ATUR A L G RADE LINE Engineer : Date :
Job Title : A Proposed Split Level 4-Bedroom Residence Checked : Date :
Location : Brgy. Dizol, San Jose City, Nueva Ecija Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Bert Sevilla File : Dt/Tm :
6.00
F
3.00 3.00
DESIGN DATA :
8
C1F1 B-1 C1F1 B-1 C1F1
TWO-WAY TWO-WAY
3.00
SLAB SLAB
B-1
-1
-1
-1
B
B
S-2 S-2
C3 F2
4.50
B-1 B-1
5'a
C1F1
1.50
5
C1F1 B-1 C1F1
LOAD COMPUTATIONS :
DEAD LOAD:
Try 100 mm Slab
Dead Load = 2.35 KPa
LIVE LOAD:
W = 1.4 DL + 1.7 LL
W = 3.30 + 8.16
W = 11.46 KN
m= Ls = 3.00 = 1.0
Lb 3.00
Negative Cs = 0.050
Negative Cb = 0.050
Ms = Cs wLs2
Ms = 0.050 (11.46)(32)
Ms = 5.16 KN-m
Mb = Cb wLb2
Mb = 0.050 (11.46)(32)
Mb = 5.16 KN-m
AP E X L IN E OF ROOF
2 .7 0
6 .1 0
TOP OF BE AM (MAS TER BEDROOM)
. 4 00 . 8. 4 6 0 3 . 0 0
F
12
1 2-4
FFL (MAS T ER BEDROOM)
1 .2 6
Engineer : Date :
FIN . GR AD E LINE
FFL (K ITCHEN)
NATUR AL G RADE LINE
w2 -1.69 w + 0.051 = 0
By Quadratic Equation:
w = 0.0307
ρ = w fc' = 0.0023
fy
As = ρbd
As = 0.0023 (1000) (75)
As = 173.34 mm 2
1000 Õ d2 173.34
S 4 =
2 .7 0
6 .1 0
T OP OF BE AM (M AS T E R B E DROOM )
. 4 0 0 . 84 60 3 . 0 0
S EE A 2 3 /8 F OR DE T AIL
F
12
1 .2 6
1 3-4
F IN. GR AD E L INE
F F L ( K ITC HE N)
NA T UR A L G R A DE LINE
Engineer : Date :
Job Title : A Proposed Split Level 4-Bedroom Residence Checked : Date :
Location : Brgy. Dizol, San Jose City, Nueva Ecija Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Bert Sevilla File : Dt/Tm :
2. Continuous Edge:
Mu = Ø fc' bd2 w (1-0.59w)
Mu = 5.16 KN-m
ρ = w fc' = 0.0038
fy
As = ρbd
As = 0.0038 (1000) (75)
As = 287.46 mm 2
1000 Õ d2 287.46
S 4 =
3. Discontinuous Edge:
Mu = 3.15 KN-m
ρ = w fc' = 0.0027
fy
As = ρbd
As = 0.0211 (1000) (69)
2
As = 189.07 mm 2
2 .7 0
6 .1 0
T OP OF BE AM (M AS T E R B E DROOM )
. 4 0 0 . 84 60 3 . 0 0
S EE A 2 3 /8 F OR DE T AIL
F
12
1 .2 6
1 4-4
F IN. GR AD E L INE
F F L ( K ITC HE N)
NA T UR A L G R A DE LINE
Engineer : Date :
Job Title : A Proposed Split Level 4-Bedroom Residence Checked : Date :
Location : Brgy. Dizol, San Jose City, Nueva Ecija Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Bert Sevilla File : Dt/Tm :
1000 Õ d2 189.07
=
S 4
2. Continuous Edge:
Mu = Ø fc' bd2 w (1-0.59w)
Mu = 5.16 KN-m
ρ = w fc' = 0.0038
fy
As = ρbd
As = 0.0038 (1000) (75)
As = 287.46 mm 2
1000 Õ d2 287.46
=
S 4
3. Discontinuous Edge:
Note : For better and safer design of two-way slab, adopt the design on the plan.
TRIBUTARY AREA
C C'1 F
6.00
3.00 3.00
TWO-WAY TWO-WAY
3.00
-1
-1
-1
B
B
S-2 S-2
C3 F2
4.50
B-1 B-1
5'a
C1F1
TRELLIS
up up ABOVE
1.50
5
LOWER
Revision :
Revision :
Revision :
APPROVED BY :
MR. & MRS. BERT SEVILLA
PROJECT OWNER
ADDRESS: BRGY. DIZOL, SAN JOSE CITY, N.E.
Job No. : Sheet No. : Revision :
2 . 0 0. 3 2
MAI N APEX L I NE
3 .2 0 2 .3 2
SECOND ARY APEX LI NE
1 . 1 13 . 6 1 2 . 0 5
F I N. CON C. R OOF L EDGE L I NE
2 .6 7
T OP OF ROO F BE AM L I NE
L OW ER APEX L I NE
8 .7 2
L OW ER T OP OF RO OF B EAM L I
N E
5 .9 5
FI
N . SEC OND F L OOR LI NE F I N. S EC OND F L OOR LI NE
4 .3 3
3 .2 0
1 1-4
0 .7 0
FI
N . G ROU ND FLOO R L I
N E F I N. GR OUND F L OO R L I
N E
0 .7 0
FI
N . G ARAGE / LA ND DEV' T L I NE FI N. GAR AGE / LAN D DEV'
T L I NE
F R ONT EL EVA TI ON
scale 1:1 0 0 m ts
Engineer : Date :
Job Title : Proposed Two-Storey Residential Building Checked : Date :
Location : Lot 32 Blk 10, Canterbury St., Hillborugh Vill., Alabang, Muntinlupa Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Alexis Agoncillo File : Dt/Tm :
6.00
DESIGN DATA : 3.00 3.00
8
C1F1
fy = 414.00 MPa Grade 40 Reinforcing Bar
B-1 C1F1 B-1 C1F1
TWO-WAY TWO-WAY
3.00
SLAB SLAB
B-1
B-1
B-1
B-1
S-1 S-1
C3 F2
4.50
Wc = 23.50 MPa Weight of Concrete B-1 B-1
5'a
C1F1
TRELLIS
Cc = 40.00 mm Concrete Cover up up
1.50
ABOVE
5
C1F1 B-1 C1F1
LOWER
LOAD COMPUTATIONS :
DEAD LOAD:
Try 150 mm Slab
Dead Load = 3.532 KPa
LIVE LOAD:
W = 1.4 DL + 1.7 LL
W = 3.30 + 8.16
W = 16.10 KN
m= Ls = 6.00 = 0.8
Lb 7.50
Negative Cs = 0.071
Negative Cb = 0.029
Ms = Cs wLs2
Ms = 0.071 (16.10)(62)
Ms = 41.14 KN-m
Mb = Cb wLb2
Mb = 0.029 (16.1)(32)
Mb = 26.26 KN-m
Job No. : Sheet No. : Revision :
2 . 0 0. 3 2
MAI N APEX L I NE
3 .2 0 2 .3 2
SECOND ARY APEX LI NE
1 . 1 13 . 6 1 2 . 0 5
F I N. CON C. R OOF L EDGE L I NE
2 .6 7
T OP OF ROO F BE AM L I NE
L OW ER APEX L I NE
8 .7 2
L OW ER T OP OF RO OF B EAM L I
N E
5 .9 5
FI
N . SEC OND F L OOR LI NE F I N. S EC OND F L OOR LI NE
4 .3 3
1 2- 4
3 .2 0
0 .7 0
FI
N . G ROU ND FLOO R L I
N E F I N. GR OUND F L OO R L I
N E
0 .7 0
FI
N . G ARAGE / LA ND DEV' T L I NE FI N. GAR AGE / LAN D DEV'
T L I NE
F R ONT EL EVA TI ON
sc ale 1: 100 mt s
Engineer : Date :
Job Title : Proposed Two-Storey Residential Building Checked : Date :
Location : Lot 32 Blk 10, Canterbury St., Hillborugh Vill., Alabang, Muntinlupa Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Alexis Agoncillo File : Dt/Tm :
By Quadratic Equation:
w = 0.0960
ρ = w fc' = 0.0048
fy
As = ρbd
As = 0.0048 (1000) (125)
As = 599.90 mm 2
1000 Õ d2 599.90
S 4 =
2 . 0 0. 3 2
MAI N APEX L I NE
3 .2 0 2 .3 2
SECOND ARY APEX LI NE
1 . 1 13. 6 12. 0 5
F I N. CON C. R OOF L EDGE L I NE
2 .6 7
T OP OF ROO F BE AM L I NE
L OW ER APEX L I NE
8 .7 2
L OW ER T OP OF RO OF B EAM L I
N E
5 .9 5
FI
N . SEC OND F L OOR LI NE F I N. S EC OND F L OOR LI NE
4 .3 3
3 .2 0
1 3- 4
0 .7 0
FI
N . G ROU ND FLOO R L I
N E F I N. GR OUND F L OO R L I
N E
0 .7 0
FI
N . G ARAGE / LA ND DEV' T L I NE FI N. GAR AGE / LAN D DEV'
T L I NE
F R ONT EL EVA TI ON
scale 1:1 0 0 m ts
Engineer : Date :
Job Title : Proposed Two-Storey Residential Building Checked : Date :
Location : Lot 32 Blk 10, Canterbury St., Hillborugh Vill., Alabang, Muntinlupa Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Alexis Agoncillo File : Dt/Tm :
2. Continuous Edge:
Mu = Ø fc' bd2 w (1-0.59w)
Mu = 41.14 KN-m
ρ = w fc' = 0.0064
fy
As = ρbd
As = 0.0096 (1000) (75)
As = 478.88 mm 2
1000 Õ d2 478.88
S 4 =
3. Discontinuous Edge:
Mu = 17.00 KN-m
ρ = w fc' = 0.0053
fy
As = ρbd
As = 0.0079 (1000) (94)
2
As = 493.50 mm 2
MAIN AP EX LINE
2 .0 0 0 .3 2
2 .3 2
SECONDARY APEX LINE
FIN. CONC. ROOF LEDGE LINE Job No. : Sheet No. : Revision :
1 .1 3 1 .6 2 1 .0 5
TOP OF ROOF BEA M LINE
LOWER APEX LINE
2 .6 7
3 .2 0
8 .7 2
1 4- 4
5 .9 5
4 .3 3
3 .2 0
Engineer : Date :
FIN. GROUND FLOOR LINE FIN. GROUND FLOOR LINE
0 .7 0
FIN. GARAGE / LAND DE V'T LINE FIN. GARAGE / LAND DEV'T L INE
0 .7 0
Job Title : Proposed Two-Storey Residential Building FRONT ELEVATION
scale 1:100 mts Checked : Date :
Location : Lot 32 Blk 10, Canterbury St., Hillborugh Vill., Alabang, Muntinlupa Approved : Date :
Subject : Structural Design Analysis Client : Mr. & Mrs. Alexis Agoncillo File : Dt/Tm :
1000 Õ d2 493.50
=
S 4
2. Continuous Edge:
Mu = Ø fc' bd2 w (1-0.59w)
Mu = 26.26 KN-m
ρ = w fc' = 0.0031
fy
As = ρbd
As = 0.0046 (1000) (75)
As = 229.88 mm 2
1000 Õ d2 229.88
=
S 4
3. Discontinuous Edge:
Note : For better and safer design of two-way slab, adopt the design on the plan.
TRIBUTARY AREA
C C'1 F
6.00
3.00 3.00
8
TWO-WAY TWO-WAY
3.00
SLAB SLAB
B-1
B-1
B-1
B-1
S-1 S-1
C3 F2
4.50
B-1 B-1
5'a
C1F1
TRELLIS
up up
1.50
ABOVE
5
LOWER
Revision :
Revision :
Revision :
APPROVED BY :
MR. & MRS. ALEXIS AGONCILLO
PROJECT OWNER