You are on page 1of 1

CONSTRUCTION DRAWING

Revision Schedule
100mm Thk No Description Date
Retaining Wall
to Engineer's
Detail/Endorsement
Pump
DAIKIN 179RT (AIR-COOLED CHILLER)
Pump Plint c/w
necessary
reinforcement

Ø38x3mm thk
Galvanized Steel
93
CHS stiffeners
41

Tap to main
pipe

Ø150 CHR
0
90
Ø200 CHS
0
150 mmthk RC floor slab
90
1600mmH Cyclone wire
to engineer's
perimeter wall
detail/endorsement
Ø38x3mm thk
Galvanized Steel
CHS c/w 100x100x8mmthk Baseplate
mounted to RC floor
w/ pre-installed heavy duty DEVELOPER

47
J-bolts 100x100x5mm
Galvanized Steel 40
SHS (at 4 corners) c/w
100x100x8mmthk Baseplate
mounted to RC floor slab

1 Iso 1 w/ pre-installed heavy duty


J-bolts ARCHITECTURAL CONSULTANT

X100

4047
M&E CONSULTANT
PUMP Plint
PUMP
900

C&S CONSULTANT

MAIN CONTRACTOR

900
Chiller Plint
c/w necessary
reinforcement to
Engineer's
detail
2247
9341

5867

900

MACTECH ENGINEERING & TRADING PTE LTD


9005 Tampines Street 93, #02-228,
Tampines Industrial Park A, Singapore 528839.
900

Tel - 6782 5593 Fax - 6782 0190


2247 Email -sales@mactech.com.sg

PROJECT TITLE

SUPPLY, DELIVERY, INSTALLATION & T&C OF 2


UNITS OF AIRCOOLED CHILLER AT CHILLER PLANT
ROOM 1&2

DRAW ING TITLE


CHILLER PLANT ROOM 1 FOR
SYSTEM 1 (STANDBY)
A3
DRAWN BY RP DATE 13/2/2020 4:13:17 PM

2 Chiller 1 SCALE

CHECKED BY
AS INDICATED

IAN
UNIT mm
APPROVED BY
ALX
X100 DRAWING NO. CURRENT

1 : 100 ALX_002 _X100


REVISION

You might also like