Activity ID Activity Description Discipline

CHNBFGDCCV1050 [FGD] FDN_Gypsum Slurry Storage Tank AR

CHNCTF_CAR1040 [TF_] Water Facility FDN_Temporary Facility AR

CHNCTF_CAR1050 [TF_] Water Facility FDN_Site Construction Area AR


[NH3] FDN & Ground Slab Concrete Work_Local Control Building for
CHNTNH3CAR1020 AR
Ammonia Treatment System
[NH3] Column Concrete & Roof Work_Local Control Building for Ammonia
CHNTNH3CAR1030 AR
Treatment System
CHNTNH3CAR1050 [NH3] Finish Work_Local Control Building for Ammonia Treatment System AR

CHNBHV_CAR1020 [HV_] FDN & Ground Slab Concrete Work_500kV SWYD Control Bldg AR

CHNBHV_CAR1030 [HV_] Column Concrete & Roof Work_500kV SWYD Control Bldg AR

CHNBFS2CAR1020 [FS2] FDN & Ground Floor Slab Concrete Work_FGD Control Bldg AR

CHNBFS2CAR1030 [FS2] 1st Floor Ground Slab & Column Concrete Work_FGD Control Bldg AR

CHNBFS2CAR1040 [FS2] 2nd Floor Ground Slab & Column Concrete Work_FGD Control Bldg AR

CHNBFS2CAR1050 [FS2] Roof Concrete Work_FGD Control Bldg AR

CHNBADBCAR1020 [ADB] FDN & Ground Slab Concrete Work_Administration & Services Bldg AR
[ADB] 1st Floor Ground Slab & Column Concrete Work_Administration &
CHNBADBCAR1030 AR
Services Bldg
CHNBADBCAR1040 [ADB] Roof Concrete Work_Administration & Services Bldg AR

CHNBSGSCAR1010 [SGS] FDN_Service Gas Storage Shelter AR

CHNBFLSCAR1020 [FLS] FDN_LS Slurry Preparation & Gypsum Dewatering & Storage Bldg AR
[FLS] Ground Level Slab_LS Slurry Preparation & Gypsum Dewatering &
CHNBFLSCAR1040 AR
Storage Bldg
[FLS] 1st Floor Slab_LS Slurry Preparation & Gypsum Dewatering & Storage
CHNBFLSCAR1050 AR
Bldg
[FLS] 2nd Floor Slab_LS Slurry Preparation & Gypsum Dewatering & Storage
CHNBFLSCAR1060 AR
Bldg
[FLS] 3rd Floor Slab_LS Slurry Preparation & Gypsum Dewatering & Storage
CHNBFLSCAR1070 AR
Bldg
CHNBFLSCAR1100 [FLS] FDN_Limestone Slurry Storage Tank AR

CHNBFF_CAR1010 [FF_] FDN_Fire Fighting Pump Shelter AR

CHNBFF_CAR2010 [FF_] FDN_Foam Station Shelter AR

CHNBCHSCAR1020 [CHS] FDN & Ground Floor Slab Concrete Work_Coal Handling Control Bldg AR
[CHS] 1st Floor Ground Slab & Column Concrete Work_Coal Handling
CHNBCHSCAR1030 AR
Control Bldg
CHNBCHSCAR1040 [CHS] Roof Concrete Work_Coal Handling Control Bldg AR

CHNBCHSCAR2020 [CHS] FDN_Chemical Dosing Pump Shelter for Coal Run-off Pond AR

CHNBCHSCAR3020 [CHS] FDN & Ground Floor Concrete Work(TT-08)_Coal Crusher Tower AR

CHNBCHSCAR3030 [CHS] 1st Floor Concrete Work(TT-08)_Coal Crusher Tower AR

CHNBCHSCAR3040 [CHS] 2nd Floor Concrete Work(TT-08)_Coal Crusher Tower AR

CHNBCPSCAR1020 [CPS] Ground Slab Concrete_Car Parking Shed_1 AR

CHNBCPSCAR1040 [CPS] Roof Work_Car Parking Shed_1 AR

CHNBCPSCAR2020 [CPS] Ground Slab Concrete_Car Parking Shed_2 AR

CHNBCPSCAR2040 [CPS] Roof Work_Car Parking Shed_2 AR

CHNBCA_CAR1020 [CA_] FDN & Ground Slab Concrete_Air Compressor Bldg AR

CHNBCA_CAR1030 [CA_] Concrete Column & Roof Install._Air Compressor Bldg AR

CHNBCCBCAR1020 [CCB] FDN_CCB AR

CHNBCCBCAR1030 [CCB] Column & Ground Slab RC Work_CCB AR


CHNBCCBCAR1040 [CCB] 1st Floor Slab & Column Concrete Work_CCB AR

CHNBCCBCAR1050 [CCB] 2nd FloorSlab & Column Concrete Work_CCB AR

CHNBCCBCAR1060 [CCB] 3rd Floor Ground Slab & Column Concrete Work_CCB AR

CHNBCCBCAR1070 [CCB] Roof Concrete Work_CCB AR

CHNBWWHCAR1020 [WWH] FDN & Ground Slab Concrete Work_Workshop & Warehouse Bldg AR

CHNBMFGCAR1020 [MFG] FDN_Mobile Facility Garage AR

CHNBMFGCAR1030 [MFG] Ground Slab Concrete Work_Mobile Facility Garage AR

CHNBCW_CAR1020 [CW_] FDN & Ground Slab Concrete_Cooling Tower Electrical Bldg AR

CHNBCW_CAR1030 [CW_] Concrete Column & Roof Install._Cooling Tower Electrical Bldg AR

CHNBWAHCAR1010 [WAH] FDN & Ground Slab Concrete_Wharf Amenities House AR

CHNBWAHCAR1020 [WAH] Concrete Column & Roof Work_Wharf Amenities House AR

CHNBCF_CAR1020 [CF_] FDN_Chemical Dosing Shelter for Cooling Tower AR

CHNBH2_CAR1020 [H2_] FDN & Ground Slab Concrete_Hydrogen Generator Bldg AR

CHNBH2_CAR1030 [H2_] Concrete Column & Roof Install._Hydrogen Generator Bldg AR

CHNBH2_CAR2010 [H2_] FDN_Hydrogen Plant Shelter AR

CHNBCL_CAR1020 [CL_] FDN & Ground Slab Concrete_Chlorination Building AR

CHNBCL_CAR1030 [CL_] Concrete Column & Roof Install._Chlorination Building AR

CHNBGH_CAR1020 [GH_] FDN & Ground Slab Concrete_Gate House AR

CHNBGH_CAR1030 [GH_] Concrete Column & Roof Install._Gate House AR

CHNBFLHCAR1020 [FLH] FDN & Basement Slab & Wall_Limestone Unloading Bldg AR

CHNBFLHCAR1030 [FLH] FDN & Ground Slab Work_Limestone Unloading Bldg AR


[AHS] FDN & Ground Floor Slab Concrete Work_Fly Ash Blower & ESP
CHNBAHSCAR1020 AR
Control Bldg
[AHS] 1st Floor Ground Slab & Column Concrete Work_Fly Ash Blower & ESP
CHNBAHSCAR1030 AR
Control Bldg
CHNBAHSCAR1040 [AHS] Roof Concrete Work_Fly Ash Blower & ESP Control Bldg AR

CHNBFO_CAR1010 [FO_] FDN_F/O Unloading Pump (2x100%) AR

CHNBFO_CAR1020 [FO_] FDN_F/O Transfer Pump (2x100%) AR

CHNBFO_CAR1030 [FO_] FDN Work_F/O Pump Shelter AR

CHNBWT_CAR1020 [WT_] FDN & Ground Floor Slab Concrete Work_WT Bldg AR

CHNBWT_CAR1030 [WT_] 1st Floor Ground Slab & Column Concrete Work_WT Bldg AR

CHNBWT_CAR1040 [WT_] Roof Concrete Work_WT Bldg AR

CHNBMOSCAR1020 [MOS] FDN & Ground Slab Concrete_Mosque AR

CHNBMOSCAR1030 [MOS] Concrete Column & Roof Install._Mosque AR

CHNBFWWCAR1020 [FWW] FDN & Ground Floor Slab Concrete Work_FGD WWT Bldg AR

CHNBFWWCAR1030 [FWW] 1st Floor Ground Slab & Column Concrete Work_FGD WWT Bldg AR

CHNBFWWCAR1040 [FWW] Roof Concrete Work_FGD WWT Bldg AR

CHNBFWWCAR2020 [FWW] FDN & Ground Floor Slab Concrete Work_FGD WWT Shelter AR

CHNBIF_CAR1010 [IF_] Intake Local Control Room_FDN & G/F Floor AR


Total Total
Measurement Unit Unit
Description Quantity Quantity
Step (%) (Each Disc.) (Report)
(Each Disc.) (Reported)
Rebar Work 30 Ton Ton 0 115

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 15.7

Rebar Work 30 Ton Ton 0 6.2

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 58.7

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 61

Rebar Work 30 Ton Ton 0 35

Rebar Work 30 Ton Ton 0 25.6

Rebar Work 30 Ton Ton 0 15

Rebar Work 30 Ton Ton 0 82

Rebar Work 30 Ton Ton 0 38

Rebar Work 30 Ton Ton 0 43

Rebar Work 30 Ton Ton 0 14

Rebar Work 30 Ton Ton 0 14

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 14.5

Rebar Work 30 Ton Ton 0 14.5

Rebar Work 30 Ton Ton 0 49

Rebar Work 30 Ton Ton 0 26

Rebar Work 30 Ton Ton 0 19.3

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 60

Rebar Work 30 Ton Ton 0 41

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 24.7

Rebar Work 30 Ton Ton 0 18.4

Rebar Work 30 Ton Ton 0 90

Rebar Work 30 Ton Ton 0 94


Rebar Work 30 Ton Ton 0 94

Rebar Work 30 Ton Ton 0 66

Rebar Work 30 Ton Ton 0 22

Rebar Work 30 Ton Ton 0 44

Rebar Work 30 Ton Ton 0 82

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 54

Rebar Work 30 Ton Ton 0 44

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 20

Rebar Work 30 Ton Ton 0 16.7

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 55

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 37.8

Rebar Work 30 Ton Ton 0 28.1

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 11

Rebar Work 30 Ton Ton 0 126.6

Rebar Work 30 Ton Ton 0 61

Rebar Work 30 Ton Ton 0 26

Rebar Work 30 Ton Ton 0 21

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100

Rebar Work 30 Ton Ton 0 100


Accumulated Accumulated
Accumulated Accumulated Accumulated
Actual Actual Accumulated B/L Start
Actual (~4/12) Actual (~4/19) Earned Progress
(~4/19) (~4/26) Achieved Step (%) (Plan)
(Reported) (Reported) (%)
(Each Disc.) (Each Disc.)
83 83 0 0 1/27/2020

100 100 100 30

100 100 100 30

8/22/2019

10/6/2019

12/20/2019

15.7 15.7 100 30

6.2 6.2 100 30

100 100 100 30

58.7 58.7 100 30

0 0 0 0 3/22/2020

5/21/2020

61 61 100 30

35 35 100 30

25.6 25.6 100 30 1/4/2020

15 15 100 30

81.5 82 99.390244 29.817073

38 38 100 30

1/26/2020

2/25/2020

3/26/2020

1/26/2020

14.5 14.5 100 30

14.5 14.5 100 30

49 49 100 30

26 26 100 30

19.3 19.3 100 30 12/11/2019

3/19/2020

60 60 100 30

41 41 100 30

100 100 100 30

11/21/2020

2/19/2021

12/1/2020

3/1/2021

24.7 24.7 100 30

18.4 18.4 100 30

90 90 100 30

94 94 100 30
94 94 100 30

66 66 100 30

22 22 100 30 12/8/2019

44 44 100 30 2/7/2020

82 82 100 30

0 0 0 0

9/22/2020

54 54 100 30

44 44 100 30

7/19/2020

8/18/2020

10/4/2019

20 20 100 30

16.6 16.6 99.401198 29.820359 2/10/2020

100 100 100 30 2/10/2020

0 0 0 0 12/9/2019

2/7/2020

8/8/2020

10/12/2020

55 55 100 30

100 100 100 30 12/16/2019

37.8 37.8 100 30

28.1 28.1 100 30 12/9/2019

2/8/2020

100 100 100 30 8/24/2019

100 100 100 30 8/24/2019

11 11 100 30

126.6 126.6 100 30

61 61 100 30

26 26 100 30

21 21 100 30

30 50 30 9 4/7/2020

8/25/2019

10/24/2019

12/23/2019

0 0 0 0 12/23/2019

4/29/2020
B/L Finish
Remark
(Plan)

3/6/2020

10/5/2019

11/19/2019

2/2/2020

5/20/2020

7/19/2020

3/4/2020

3/25/2020

4/24/2020

5/24/2020

3/10/2020

2/9/2020

6/3/2020

1/4/2021

3/20/2021

1/14/2021

3/30/2021
2/6/2020

4/6/2020

11/6/2020

8/17/2020

10/16/2020

12/2/2019

4/9/2020

4/9/2020

2/6/2020

4/21/2020

10/11/2020

12/10/2020

2/3/2020

2/7/2020

4/8/2020

9/7/2019

9/7/2019

7/8/2020

10/23/2019

12/22/2019

2/20/2020

2/20/2020

5/28/2020