You are on page 1of 24

ABU DHABI OIL REFINING

INSPECTION AND TEST PLAN


COMPANY

TAKRL-ER
-A.: 1 £-.! < >4. yL
(ITP)
0GSE&C
,,
ROTATING EQUIPMENTS
.
-

We Refine Right
(Pump, Turbine & Compressor)
RLJWAIS REFINERY
EXPANSION PROJECT
DOC NO.: 5578-E2-ITP-MU-17002 Rev. 0 Page 1 of 23
AGREEMEN T NO.: 09-5578-E-2

ITP FOR ROTATING EQUIPMENTS

(Pump, Turbine & Compressor)


ABU DHABI OIL REFINING
INSPECTION AND TEST PLAN
COMPANY

TAKRtiER
(ITP)
0GSE&C
ROTATING EQUIPMENTS
We Refine Right
(Pump, Turbine & Compressor)
RUWAIS REFINERY
EXPANSION PROJECT Rev. 0 Page 2 of 23
DOC NO.: 5578-E2-ITP-MU-17002
AGREEMENT NO.: 09-5578-E-2

This page is a record of all revisions of this document. All previous issues are hereby superseded and
are to be destroyed.

REV DATE DESCRIPTION PRPD CHKD REVD APPRD COMPANY

0 31 July 2011 Issue For Construction JSP SWH DYM JHY

B 27 June 2011 For Approval JSP SWH DYM JHY/


A 30 May 2011 For Review & Comment JSP SWIjr dym/
SIGNED (Initials) /p*

QA Review (PQM) Sign: _


Date:_

NOTES:

a) Revision bar (vertical line) shall be placed in the right hand margin to indicate where the
change has been made.

b) PRPD = Prepared by, CHKD = Checked by, REVD = Reviewed by


APPRD = Approved by

c) In case of conflict between any requirements stipulated in this document with the
contractual requirements the contractual requirements shall prevail.
,
ABU DHABI OIL REFINING
COMPANY
INSPECTION AND TEST PLAN

.
WJ-
TAKRliERWr
L
-
j:II Hy< J -Sl.J-,,1
(ITP)
0GSE&C
We Reflno Right
ROTATING EQUIPMENTS
(Pump, Turbine & Compressor)
RUWAIS REFINERY
EXPANSION PROJECT Rev. 0 Page 3 of 23
DOC NO.: 5578-E2-ITP-MU-17002
AGREEMENT NO.: 09-5578-E-2

PARAGRAPHS REVISED THIS ISSUE

Para. No. Para. No. Para. No. Para. No.

Page No. 6

Page No. 7
ABU DHABI OIL REFINING
INSPECTION AND TEST PLAN
COMPANY

TAKRliER ,eJ"*
(ITP)
0GSE&C
We Refine Right
ROTATING EQUIPMENTS
(Puinp, Turbine & Compressor)
RUWA1S REFINERY
EXPANSION PROJECT Rev. 0 Page 4 of 23
DOC NO.: 5578-E2-ITP-MU-17002
AGREEMENT NO.: 09-5578-E-2

TABLE OF CONTENTS

Section Description

0 . 1 Inspection Categories

0 . 2 Notice of Inspection

10 . Foundation

2 .
0 Material Receiving

3 .
0 Erection of Equipment

4 .
0 External Final Inspection

5 0
.
Others Activities Item(lf necessary)

60 .
Attachment

Attachment 1 -QGI-001 Notification for Inspection

Attachment 2 - QCI-009 Release Note

Attachment 3 - QMI-001 Receiving Inspection Report

Attachment 4 - QMI-002 Pad Level / Anchor Bolt Projections (Horizontal)

Attachment 5 - QMI-010 Equipment Final Inspection Report

Attachment 6 - QMI-015 Base Level Inspection Report (Pump / Turbine / Compressor) A

Attachment 7 - QMI-016 Base Level Inspection Report (Pump / Turbine / Compressor) B

Attachment 8 - QMI-017 Base Level Inspection Report (Vertical)

Attachment 9 - QMI-018 Alignment Inspection Report (Pump / Turbine / Compressor) A

Attachment 10 - QMI-019 Alignment Inspection Report (Pump / Turbine / Compressor) B

Attachemnt 11 - QMI-020 Alignment Inspection Report (Vertical)

Attachment 12-QMI-021 Flange Parallelism Inspections

Attachment 13 - QMI-022 Rotating Equipment Checklist

Attachment 14 - QCI-011 Grouting Checklist

Attachment 15 -QCI-0I3 Authorization forNon Shrink Epoxy Grout


ABU DHABI OIL REFINING
INSPECTION AND TEST PLAN
COMPANY

TAKRLiER.fcJr
JsbAill y ./JmJ kdmm H
(ITP)
0GSE&C
We Refirve Right
ROTATING EQUIPMENTS
(Pump, Turbine & Compressor)
RUWAIS REFINERY
EXPANSION PROJECT Rev. 0 Page 5 of 23
DOC NO.: 5578-E2-ITP-MU-17002
AGREEMENT NO.: 09-5S78-E-2

0 . 1 Inspection Categories
The following inspection categories shall be used to identify the extent of inspection for each
inspection activity within the ITP

I Inspection items:
It is the primary responsibility of Subcontractor and/or CONTRACTOR,S Quality
Department to carry out the necessary inspection and test to assure conformance to the
Contract requirements, drawings, specification and related codes and standards.

S Surveillance

Monitor the status of work and materials and analyses of records on a periodical basis to
ensure that specified requirements are being fulfilled.
W Witness

As mandatory items of inspection, examination, or test this stage shall be notified in


advance by the Subcontractor or CONTRACTOR,S construction department and shall be
performed under witness of the relevant Inspection Authority. However, work may
proceed if the relevant authority is not available at the required time.
H HOLD

Hold point (H) means a point, designated by prior stated agreement in the inspection and
test plan(s) at which the performance of an activity must be stopped and put an hold until
,

specified actions are completed.


R Review

Review results of inspection examination or test.


,

0 2
.
Notice of Inspection
The Subcontractor shall submit to CONTRACTOR a 'Notice of Inspection Request one (1)
day before the inspection is to be carried out. The request shall contain information as follows:
. Inspection item(s) .

. Responsibility Category (as defined within the ITP)


,

. Date,place and time of inspection.


. Requirement for third party inspection (if any) .

. Any other relevant information .

The Subcontractor may proceed with the inspection activity at the specified time without the
presence of CONTRACTOR or COMPANY for witness inspection unless a delay has been
previously advised and agreed by either party.
. The Notice of Inspection shall be sequentially numbered by the subcontractor in
accordance with 5578-E2-EPC-PA-00314 'Numbering Procedure for Site Quality
Documents,.
Oi
co
<N
<4-<
O
vo

u <D
t>J)
03
< -3 CU
aJ

U)
ID
ec5

>

o4

Q
en

&
<N I/-) VO i-~ CO ON O
o
o
9
ooo
9 o o o
C/5 o f-

iii 8 Hi S
H
£

a>
& S S
aa c/cya cycya a

i-
W a
S
o
U
Pm c*
H W 2 W
c
u
0 00
£ Z
-
D
.T)
o
HH h£ «T)

H
H a
U
W O S
Ph & s u
Ph
(Z)

<u
a o
©
U 2D 2d
fi o
c -1-
D a. §55 g& o
o o
o

S -- 9 9 <N 9 CN 9 9
3 J D p UJ p UJ D D
y m "
> oo 2 2
y a. v>
I t
D-
-
~

"

in " > CO
« 2 <N VO rM vo
'

rs fN
5 <W UJ oo UJ co tq uj co
*o
oo O
"
CO oo 9
>r>
>/-)
ir>
i/->
«->
<r>
r-~
>/-) o
>/~i
ro

o §1 §
:

i
Oh
tj -a <*-
o .~
2 5
§1
c
2 =3
-

c
c o
*
o Jz K ,

2 o
.

3 s «
! S I §
c 0 ? °
X §P
« H w
o .ii
1>
S > 5
2 on §CQ
E «y U fc
,
1 s
I .

o-
& £ u
J 0 II
E-g .
c E t- § 8, f on «

1 &-S I s 1 fa
19
.

c/5 <
u u UJ
UJ 3 = <?
JO
«

CO
-)
CN
«+-K
o
r-»
Y
u <U N
SP s A
iZ cu i
n
t
P
M
£ £
o
P O
n C
(/) i
t
c
o

o e
p
s R
.

n T
I
N £ £
O
C

>

psj o
n

c
- -
b
u
S

t
n
e
m
u 1

c 2
o 0
-
D I

g M
n
y
i
Q ,

O
<N f
i

r 8 9 0 2
e 1 1 2 2
s-< o 0 0 0 0
V
<Z3 o -
I I
- -
l
-
1

H t*i

M M M M
Q Q Q Q
z 0)
Jm
W a
a
o
U
a
Ph o>* r* r
i

e
H W 2 W
r
i
t

£
o O
oo
t
C )
e
%
--
- l

z < irj n
c a
u
o IT) a C s

HH h£ t
p
e
>
i

V
(

H < c
c
t> ) g
a n
U H A i

O a 1 w
a
W 3
r

P* U D
Pm Ph C C
(Z) u F
I

/
s e
e ) )
p

d 0 i
0
o
. P .
-
0 ( 0
C 1 8 1

5
U
(
s
.
)

c 5 1
,
.
M
t o
r
1 1 4 .

0
1
P
-

n 0 0 r
e P 0 0 a 0 S
-
0 0 0
m
&
/ 2
p

- - -

u c
.

U U U E
-
c e
o p M M )
4 )
M 8
7
- - -
D S 2 k
P P P 5
- c
/ S S 5
e S 6 e
c d - - ( h - ,
t 2 6
n 2 2 6
S 8
C E 8
e E E 1
r - - 6 n - 6
e 8 8 - i 8 - 1

f 7 7
I a 7
I
0
e
5 5 P r
t 5 P 0
R 5 5 A S 5 A 0
<
Q
.
<s
s
o H "? b
e

o
t

o 3*1 >- U £ n
e

©4\
t

o
z s
£ S s? t
i
c d
m
g
n
g
.
£ O s r
s
i
d
ft
E
n
i

a
i
n
n
Wh£ " e
t
n
'
s
n
e i
o

g £ o
i
a t
c d 2 t

S Z
a e
-
h
M g
h c
e

I
k n S

« 2 h
r
a c t o n m
,
i p s
e

|i T s
h e n i
t n
i
r n
e s
h t
e

o
5
i

C d
i
l I o
m
e

C e o s i

> Z S
t
d
n l
s
n B a i
w

l
t
o e d
£ c s
l
n g e a n c
C
SSI
n
a
y
i
l
gB t
r
a i
n d
n
i

F
c
o

-
Is t
A
m n
e o
o
P a
r
t
a l

a
A
mC
c

t
i i
F e l

v
ft S e
l
n a
W g
n

r p k r
o i
r u
a

t i t n e i
f u s s e
f s
c p
c n o i
o
a a t n i

A l i

o
C D S F
G x o
V
P

C - - - - - - E C -

o
JK o
ci -
t 3-
ABU DHABI OIL REFINING
COMPANY INSPECTION AND TEST PLAN

TAKRHER
r l y
- Hil . 1 -4 *1=4')
(ITP)
0GSE&C
We Refine Right ROTATING QEUIPMENTS
(Pump, Turbine & Compressor)
RUWAIS REFINERY
EXPANSION PROJECT
Rev. 0 Page 8 of 23
DOC NO.: 5578-E2-ITP-MU-17002
(AGREEMENT NO.: 09-5578-E-2)

6 0
.
ATTACHMENTS

Attachment 1 -QGI-001 Notification for Inspection

Attachment 2 - QCI-009 Release Note

Attachment 3 - QMI-001 Receiving Inspection Report

Attachment 4 - QMI-002 Pad Level / Anchor Bolt Projections (Horizontal)

Attachment 5 - QMI-010 Equipment Final Inspection Report

Attachment 6 - QMI-015 Base Level Inspection Report (Pump / Turbine / Compressor) A

Attachment 7 - QMI-016 Base Level Inspection Report (Pump / Turbine / Compressor) B

Attachment 8 - QMI-017 Base Level Inspection Report (Vertical)

Attachment 9 - QMI-018 Alignment Inspection Report (Pump / Turbine / Compressor) A

Attachment 10 - QMI-019 Alignment Inspection Report (Pump / Turbine / Compressor) B

Attachemnt 11 - QMI-020 Alignment Inspection Report (Vertical)

Attachment 12-QMI-021 Flange Parallelism Inspections

Attachment 13 - QMI-022 Rotating Equipment Checklist

Attachment 14 - QCI-011 Grouting Checklist

Attachment 15 - QCI-013 Authorization for Non Shrink Epoxy Grout


I Wewouldiketohavyurpesncforispecton/sacordingthefolwingschedul
Attachment 1 - Notification for Inspection Page 9 of 23

RUWAIS REFINERY EXPANSION PACKAGE No.2 PROJECT

TAKR LiER<r r

We Befine Right
NOTIFICATION for INSPECTION ®S E&C

To : _
Notification No.:_

Discipline : _
Subcon. Name :_

Ref. DWG No. : _


Request Date : _

I I This is to inform you that the following inspection/test will be carried out at the schedule time
mentioned below:

Inspection Item Location Date & Time

1 .
_ _ _

2 .

_
_ _

3 .
_
_ _

4 .
_
_ _

5 .
_
_ _

6 .
_
_ _

7 .
_
_ _

Comment
_

Attachment: Yes No

Submitted by : _ Reviewed by :_ Received by : _

(Subcontractor/Const.) (CONTRACTOR QC Engineer/Inspector) (COMPANY)

Form No.: QGI - 001 Rev 0


Attachment 2 - Release Note Page 10 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT

TAKREERWr

We Refuse R*ght
RELEASE NOTE
<JiGSE&C
RUWAIS REFINERY
EXPANSION PROJECT

System No. Unit. Date. Report No.

Trench / Concrete Items included as detailed below are released for structural steel / equipment / piping erection
with the remarks included hereto.

No. Item Description Remark

Attachment

No. Item Description Remark

Note : This is for The Acceptance of Further Activites


REMARKS

RELEASE
RELEASE MADE BY RELEASE CHECKED BY
Signature ACCEPTED BY
Register
Subcontractor CONTRACTOR Const. CONTRACTOR QC Subcontractor

Name

Signature

Date

Form No.: QCI-009 Rev. 0


Attachment 3 - Receiving Inspection Report Page 11 of 23

'

r
XK"' , RECEIVING INSPECTION REPORT GS E&C
We Refine Right

Ruwais Refinery Receiving


Equipment/Material
Project Name Expansion Project
Name
Inspection RIR
PKG n
Report no.
-

P/O No. 5578-E2-


Material Receipt MRR-
Inspection
Report Number Request Date

Quantity
Supplier Name Inspection Date
Inspected

Complete Partial | |

Inspection Result
No. Inspection Contents Remarks
Accept Reject N/A

1
Conformity/Nonconformity between purchase
requirements and quality record received.
2
Inspection Release Note & Vendor Shop
Inspection Report available (with punch list if applicable)
3 Identification and mark of equipment/materials

4 Condition of protection packing and sealing

&
Filling up condition of inert gas and/or silicon
(where applicable)
6 Painting Condition

7
Whether there is chemical/physical damage or not
(including cleanness)
8
Measurement of major dimension of Equipment
and Materials

9 Nondestructive Examination & PMI (If necessary)

10 Issue of Non-conformance report Yes ( ) No ( ) Report No.:

11 Issue of OS&D Report Yes ( ) No ( ) Report No.:

12 Preservation requirements/instruction Yes ( ) No ( ) Doc. No.:


Contents of Quality Records:

Other

Inspected by: Reviewed by: Approved by:

QC Inspector Material Control Field QA/QC


Manager Manager

Form No.: QMI - 001 Rev 0


Attachment 4 - Pad Level / Anchor Bolt Projections (Horizontal) Page 12 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT
'

TAKRL iS &i
'

i
'

-A ii I yli
PAD LEVEL / ANCHOR BOLT
GS E&C
We Refine Right

RUWAIS REFINERY PROJECTION REPORT (Horizontal)


EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

BCD

Bolt BCD

(B)
EL (A)
Projection
Tolerance: ± 3.0mm
Tolcrance: ± 1.5mm
FOUNDATION

Foundation

PAD LEVEL Pad Elevation (A) Anchor Bolt Projection (B) Bolt BCD
No. Result
DWG. Actual DWG Actual DWG Actual

Level I Point 2

V////// 3

4 ; 4-
-

4
k\\\\\\]
5

1 . Anchor Bolt / Nut Tighting Result: Yes a No

2 . Grouting Condition Result: Yes No

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 002 Rev 0


Attachment 5 - Equipment Final Inspection Report Page 13 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT

TAKR1IER

We Refine Right
EQUIPMENT FINAL INSPECTION ® GS E&C
RUWAIS REFINERY
REPORT
EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

Result
No. Description Remarks
Accept Reject
1 Confirm equipment name /name plate

2 To be Checked the orientation of equipment

3 To be checked condition of anchor double nuts(base plate)

4 Completion of grouting and finishing surface

5 To be checked shims condition as per specification

6
To be checked Completion of Platforms & Ladders and
Davit.

7 Check of accessories relating to rotating equipment

8 To be checked Sliding Side Teflon pad

9 To be checked earth lug grounding cable connection

10
To be checked of Internal Accessories before closing
manhole

11
Check Weep Holes in reinforcing pads are filled with
proper grease.

12
Desicant bags removed from inside of nozzles as
applicable.
13 Check Piping connection are stress free.

14
General cleanliness shall be check prior for final Box-up /
Vessels manway closure.
15 To be checked Touch up Paint

16 Preparation of documents for final inspection

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI -010 Rev 0


Attachment 6 - Base Level Inspection Report (Pump/'Turbine/Compressor) A Page 14 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT

TAKRHER i
BASE LEVEL INSPECTION REPORT-A
GSE&C
We Refine Right

RUWAIS REFINERY (Pump / Turbine / Compressor)


EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

Dwg. DIS. NOZZLE ELE.


E
Act.

SUC. CEN. ELE.

Base Level: Before Grouting Unit: mm

Measuring Location Tolerance Deviation N-S Deviation W-E Results

PUMP DIS NOZZLE

MOTOR BASE

SKID BASE

ANCHOR BOLT TIGHTENING


Anchor Botls Size Design Bolt Tight Actual Bolt Tight Results

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 015 Rev 0


Attachment 7 - Base Level Inspection Report (Pump/Turbine/Compressor) B Page 15 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT

TAKRliER,
Wiii
BASE LEVEL INSPECTION REPORT-B
GS E&C
We Refine Right

RUWAIS REFINERY (Pump / Turbine / Compressor)


EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

Tolerance : ±0.05mm

Base Level: Before Grouting Unit: 1/100 mm

Measuring Location Tolerance Actual Results Remarks

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 016 Rev 0


Attachment 8 - Base Level Inspection Report (Vertical Pump) Page 16 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT

LiER<§
TAKRHER<
Will vAJ

Refine Right
w-
BASE LEVEL INSPECTION REPORT £gse&c
RUWAIS REFINERY (Vertical Pump)
EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

Tolerance : ±0.03mm

O
270° - -
90

Base Level: Before Grouting Unit: 1/100 mm

Measuring Location Tolerance Actual Results Remarks

SIGNATURE Subeontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI-017 Rev 0


Attachment 9 - Alignment Inspection Report (Pump / Turbine / Compressor) A Page 17 of 23

ABU DHABI OIL REFINING

COMPANY INSPECTION & TEST REPORT

TAKRliER
v- <*-' y
ALIGNMENT INSPECTION REPORT-A
GS E&C
We R<jflnn Right

RUWAIS REFINERY (Pump / Turbine / Compressor)


EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

After Grouting After Piping After Flushing

COUPLING ALIGNMENT

270 90

Alignment: Comp, / Pump - Driver SOFT FOO T

Locartion 1 2 3 4
POSITION RPM ANGULAR PARALLEL RESULTS
Soft Foot reading

0° No. of Shims

90° Results

180° COUPLING DIAMETER :

270° DBSE:

SIGNATURE Subcontrator/ CONTRACTOR QC COMPANY


REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 018 Rev 0


Attachment 10 - Alignment Inspection Report (Pump / Turbine / Compressor) B Page 18 of 23

ABU DHABI OIL REFINING


COMPANY INSPECTION & TEST REPORT
WJ-
TAKRiiER y&r
Will v. -jfe-J 4>wX.„l Urn yi
ALIGNMENT INSPECTION REPORT-B
GS E&C
We Refino Right

RUWAIS REFINERY (Pump / Turbine / Compressor)


EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

D After Grouting After Piping After Flushing

COUPLING ALIGNMENT

90

180

Alignment: Comp; / Pump - Gear Box Unit: mm


Check location
Measuring Classification Tolerance Result Remarks
90° 180° 270°

Angular Misalignment
Parallel Misalignment
Coupling Gap mm

Alignment: Comp, / Pump - Gear Box Unit: mm


Check location
Measuring Classification Tolerance Result Remarks
90° 180° 270°

Angular Misalignment
Parallel Misalignment
Coupling Gap

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 019 Rev 0


Attachment 11 - Alignment Inspection Report (Vertical Pump) Page 19 of 23

Unit. Date.
ABU DHABI OIL REFINING
COMPANY INSPECTION & TEST REPORT

TAKRhER '
ALIGNMENT INSPECTION REPORT
GSE&C
We Refine Right

RUWAIS REFINERY (Vertical Pump)


EXPANSION PROJECT

System No. Report No.

Location/ Item. Drawing No(s).

After Grouting After Piping EH After Flushing

Tolerance: Vendor,s Instniction


or OD:0.05/FC:0.05

MOTOR

270° 90°

PUMP

180°

Alignment: Comp, / Pump - Gear Box Unit: mm


Check location
Measuring Classification Tolerance Result Remarks
90° 180° 270°

Angular Misalignment
Parallel Misalignment
Coupling Gap mm

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QM1 - 020 Rev 0


Attachment 12 - Rotating Parallelism Inspection Page 20 of 23

ABU DHABI OIL REFINING

COMPANY INSPECTION & TEST REPORT


Mi
TAKRUER w
V , I -fe.lL. 1 yL
ROTATING PARALLELISM
GS E&C
We Refino Right

RUWAIS REFINERY
INSPECTION
EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

Typical Sketch SUCTION LINE DISCHARGE LINE

1 "

TOLERANCE: Flange face shall be within gasket


spacing plus 250 micrometers (0.010 inch) for
"
piping smaller than NPS 10 and 750 micrometers

(0.030 inch) Max. for NPS 10" up


Pipe Strain = 0.05 mm

Offset Measurement (mm) Gap Measurement (mm)


EQUIPMENT
0Z 90 X 180 Z 270 X y i y2 y 3 y4

SUCTION LINE

DISCHARGE LINE

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 021 Rev 0


Attachment 13 - Rotating Equipment Checklist Page 21 of 23

ABU DHABI OIL REFINI MG


COMPANY INSPECTION & TEST REPORT

TAKRliERWJ
V ><
* "

We Reline Right
ll ft. +
INTERNAL FINAL INSPECTION 0 GS E&C
RUWAIS REFINERY REPORT (Equipment)
EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).

Result
No. Description Remarks
Accept Reject
1 Check the skid for transit damage, including coating.

2
Check that the Vendor drawing has the same leveling
requirements as per design drawings.
3
Confirm that all nameplates are securely attached &
correct to the data sheets.

4 Ensure Prevation log is initiated.

5 Auxiliaries connections completed.

6 Check that the skid is leveled & at the correct elevation.

7 Seal installation

8 Free rotation by hands

9 Direction of rotation

10 Pump driver final alignment

11 Coupling installation

12 Guards and accessories

13 Suction strainer installation

14 Confirm that earthing lug is fitted.

15
Ensure that all terminal points have flange/pipe protectors
fitted.

Ensure that all machinery holding down bolts are secure &
16
correctly torqued.

SIGNATURE Subcontrator/ CONTRACTOR QC


COMPANY
REGISTER Construction Engineer/Inspector
Name

Signature

Date

Form No.: QMI - 022 Rev 0


Attachment 14 - Grouting Checklist Page 22 of 23

ABU DHABI OIL REFINING


INSPECTION AND TEST REPORT
COMPANY

TAKRIiEK
We Refine Right
GROUTING CHECKLIST
0 GS E&C
RUWAIS REFINERY
EXPANSION PROJECT

System No. Unit. Date. Report No.

Location/ Item. Drawing No(s).


Check Items Subcon CONTRACTOR COMPANY

Grouting material approved


Equipment padding and shims checked and
accepted

(QC inspector should verify the shims condition)


Footing / base is released for grouting

(QC inspector to verify grouting authorization QCI-005 is available)


Sand pre-fill to tanks securely placed

(site engineer to verify -(tanks only) _

Surface of foundation ready for grouting, Chipped


/Brushed /Cleaned and Moist Surface

(Site Engineer to verify preparation "soaked cement grout /dry epoxy


"

grout and that temperature of foundation and base between 10°C and 32
°
C ) _

Formwork installed correctly, Adequately


Reinforced Edges Sealed.

(Site Engineer to verily that shutter is securely fixed at correct location )


Materials mixed and placed correctly,

(Site Engineer to verify : Confirm Material Name )


Material.Epoxy /Cement _

Grout temperature acceptable

(Site Engineer to confirm that grout temperature complies to the


Manafacture Recommendations) _

Grout cured

(Site Engineer to verify that curing carried out as per the Manafacture
Recommendations) _

Grout test cube results acceptable

( QC to verify that grout strength (fl 35 N/mm2@7 days and ( 55 N/mnr


@28 days cement grout/ ( 65 N/mm2@24 hours and ( 95 N/mmJ@7
days epoxy grout) _

Comments

SIGNATURE Subcontrator/
CONTRACTOR COMPANY
REGISTER Construction

Name

Signature

Date

Form No. QCI-011 Rev 0


Attachment 15 - Authorization for Non Shrink Epoxy Grout Page 23 of 23

ABU DHABI OIL REFININC 1


COMPANY INSPECTION AND TEST REPORT

TAKRUERNfJr
i ii V- J

We Refine Righl
J- 4 1 yh AUTHORIZATION FOR NON SHRINK 0GSE&C
EPOXY GROUT
RUWAIS REFINERY
EXPANSION PROJECT

System No. Unit. Date. Report No.

Steel Structure Static Equipment Rotary Equipment Package Skid

You are kindly requested to proceed as soon as possible with the grouting of the following items

GROUTING SELECTION KEY

Item Type Cement-based Grout

Centrifugal Machinery and Pumps with drivers Weight >2000 KG

Reciprocating machines Applicable

Sole plate mounted equipment Applicable

Engine drivers and their driven equipment Applicable

Comments

SIGNATURE Subcontrator/
CONTRACTOR COMPANY
REGISTER Construction

Name

Signature

Date

Form No. QCI-013 Rev 0


ABU DHABI OIL REFINING COMPANY (TAKREER)
RUWAIS REFINERY EXPANSION (RRE) PROJECT JACOBS
PROJECT NO. 5578 /AGREEMENT NO. 09-5578-E-2

DRAWING / DOCUMENT COMMENTS SHEET o


d%$>
~

PMC Comments sheet.


To,

Project Manager / R CESVEO


GS Enqineerinq& Construction f o Mjf 0fl11
.

\ )
TAKREER Transmittal T-GS-5578-E2-0130
Date:
\ RRE2 y
No 01S1 August 20f1"'
CONTRACTOR Received
Transmittal / Letter No.
Date:
Date: 02"t August 2011
Drawing / Document 5578-E2-ITP-MU-17002 Rev. No. 0
No.

Drawing / Document ITP for Rotating Equipments (Pump, Rev.


Title Turnbine, & Compressor) Date:

Due
Date:

No Comments. f \
fORIGINAL]
\ E&C J
\ RiE2y

Commented By: Mark Huahes fOA/OC Manager)


Date:
02"d August 2011

Review Code:

1 . Rejected Revise and Resubmit DIST

2
.
Comments as Noted Work may proceed subject to compliance at M'l tYLJ»IB¥liTEI PT m
with and incorporation of comments I PLAN wmm mm

3 No Comments Work may proceed


eT a:)M
o, Tk?
L
.

h:
FF
ia
_

4 . Information only Accepted for information only s<


__

MAT I .

PC
PIPING:
INST
ELECT
MECH* r"
CIVIL
PAINT
STEEL
| INSi
bu3G
._

COMM

Charge Manager CM
f SM SD
IT
OCC

__

DATE
>
--
PMF .

Page l of 1