JIMMA UNIVERSITY

JIMMA INSTITUE OF TECHNOLOGY

HWRE

CONSTRACTION AND PLANNING

ASSIGHNMENT-1

NAME: Surafel Abera


ID.NO: 03064/04 ADD

Jimma, Ethiopia
December, 2020
Pre planning task: Are carry out safety goal, objective, constriction

Pre design phase: is the phase of analyse that occur after some form of founding is available
and before design being during the pre-design case.

Design phase: At the end of the design phase and the constriction budget with ready for
approval and the project is read to construct

Bid and award phase: the bid for the chance to work with you the pre requirement
management plan detailed.

Constriction management phase: just like any other project and construction project
management has phase from design planning to schedule the bit itself.

Post constriction phase: careful planning and control during the pre-requirement and the
constriction state.

The responsibility of constriction parte: typically who are the party to UN engineering or
constriction contract or packaging of construct and who is responsibility.

Activity under each phase is constriction: every project has a beginning and meddle carried
during with activity move the phase.

Responsibility required with each phase: each project phase may also require a different
leader ship approach also good planning communication and team building can reduce.

The document required and or preparing under each phase: project constriction manual
is under document and each the other output and report required in the project.