SIEMENS PROTECTION RELAY WIRING TEMPLATE – 132KV MAIN2 FEEDER PROTECTION (M2FP)

Ordering Code: 7SD5221-5NB99-7HJ4+M0H+L0S


Power Supply
+ ve K1 +
7SD522 K6 7SD5221-5NB99-7HJ4+M0A+L0S*
Main2 DC Supply
K2 BO1 K5 * Can be used with 7XV5461 up to 170KM
from DCDB - ve -
K7
R7 BO13
BO2
To M1FP R8 Watchdog
K3
K8 LED Configuration and Label
To SCMS/BCU 2 1 BO3
BUS SIDE
(see note 7)
Test Block
K4 2 3 K9 LED Configuration Type
Watchdog
P1 R Q1 BO4 K10 LED LABEL REMARKS
K11 Sequence (Latch / Unlatch)
Q2 IR
BO5 K12
Y Q3 1 L TRIP All Trip
K13
Q4 IY Unlatched for Dist / DEF Start and
BO6 K14 2 U/ L R Phase
Q5 CT
B Latched for Dist / DEF/ Diff Trip
Inputs K15
N Q6 IB
BO7 K16 Unlatched for Dist / DEF Start and
P2 Q7
3 U/ L Y Phase
R1 Latched for Dist / DEF/ Diff Trip
Q8 IN BO8 R5 Unlatched for Dist / DEF Start and
CB
MCB R15 R2 4 U/ L B Phase
R Latched for Dist / DEF/ Diff Trip
BO9
VR
LINE SIDE R3 5 L Diff Trip 87L
Y R17
VT BO10
Supply VY 6 L Zone1 Trip
Input R4
VT
B R18 Inputs BO11 7 L Dist Teleprot Trip Distance Teleprotection Trip
R16 VB R6
N
R13 BO12 8 L Dist Backup Trip Z2 / Z3 / Z4 / Z5 Time Delayed Trip
Binary Outputs - R9
R14 VN Refer Table for 9 L DEF Trip Log DEF or accelerated 67G Trips
Detail Application BO14 R10
R11
10 L 50BF Trip
K17 BI1 BO15 R12
K18 P3 11 L Intertrip Received DTT
J1 BI2 BO16 P4
12 U Comms Fail (Protection Interface)
J2 P6
J3 BI3
BO17 P5
VT Fuse fail / VT MCB trip / CT
J5
13 U CT / VT Circuit Fail
P7 Circuit fail / Broken conductor
J4 BI4 BO18
14 U C & I DC Fail Control & Indication Circuit
P8
J6 BI5 BO19
Binary Inputs -
Refer Table for P9
J7 BI6 Detail Application
BO20 P10
J8
P11
J9 BI7
BO21 P12
J10
P13
J11 BI8
BO22 P14
J12
P15
P17 BI9
BO23 P16
P18
N1 BI10
N2
N3
BI11
N5

N4 BI12

Communication Modules
N6 BI13 Port - B
Port - D 2.6.2 VP-TP 09/01/2019 Signal Description SCS added , Relay I/O table updated
2.6.1 VP-TP 12/01/2015 Additional comment from BO13 is removed
2.6 VP-TP 19/07/2012 CB Close Interlock added
N7 BI14
Protection 2.5.1 ORG 04/02/2010 Intertrip for M1BZP, Common template for FDR
N8 Port - A Revisions Name Date Remarks
Panel
N9 BI15
Boundary
N10
N11 BI16 Front Port

N12 Title : 132KV FEEDER – M2FP (7SD522) Drg. Ref. No. : TPD/DS/132/FDR/SIE-122
Prepared: VMS Checked: Venkat Approved: VP-TP Sheet No.

1 of 2
SIEMENS PROTECTION RELAY WIRING TEMPLATE – 132KV MAIN2 FEEDER PROTECTION (M2FP)

Ordering Code: 7SD5221-5NB99-7HJ4+M0H+L0S


7SD5221-5NB99-7HJ4+M0A+L0S*
* Can be used with 7XV5461 up to 170KM

RELAY INPUT/OUTPUT FUNCTIONS *


R elay Out p ut C o nt act D et ails
RELAY TERMINAL I/O TYPE FUNCTION Type SIGNAL DESCRIPTION SCS(See Note-12) APPLICATION
B O1 K6 - K5 Standard * C & I DC Fail U M 2FP C& I DC Fail C o nt act T yp e C o nt i nuo us R at ing ( A )

B O2 K7 - K5 Standard * M 2FP Co mms Fail U M 2FP Co mms Fail To SCM S / B CU (See No te.2)
B O3 K8 - K5 Standard * VT P ro tectio n Operated U M 2FP VT P rotectio n Operated Standard Relay 5A
B O4 K9 - K10 Standard * Trip U To Trigger DFR
B O5 K11– K12 Standard * Trip, M 2RP Trip, M 2B ZP Trip U CB Clo se Interlo ck
B O6 K13 – K14 Standard * 50B F2 Trip (+ ve) U 50B F2 B ack Trip to B Z
B O7 K15 – K16 Standard * 50B F2 Trip (- ve) U 50B F2 B ack Trip to B Z
B O8 R1– R5 Standard * Spare **
B O9 R2 – R5 Standard * M 2FP Trip U M ain 2 P ro t. Operated
R el ay D ig it al Inp ut D et ai ls
B O10 R3 – R5 Standard * CT Fail U M 2FP CT Fail To SCM S / B CU
R4 – R5 (See No te.2)
OUTPUTS

B O11 Standard * 50B F2 Trip U M 2FP CB F Trip M ini mum Pickup D eb o unce t ime
B O12 R6 – R5 Standard * M 2FP B ackup Trip U M ain 2 B ackup P ro t. Operated
73V 5 ms
B O13 R7 – R8 Standard * M 2FP Fail U To M 1FP

B O14 R9 – R10 Standard * Spare


B O15 R11– R12 Standard * Spare
B O16 P3 – P4 Standard * Trip U Spare
B O17 P6 – P5 Standard * Trip U Spare
B O18 P7 – P5 Standard * Spare
B O19 P8 – P5 Standard * Spare Notes:-
B O20* P 9 – P 10 Standard * Trip U To CB TC2 1. Protection Interface Fibre Optic Communication - Modem to be selected as per Line length ( All Intertrip Via Fibre
B O21* P 11- P 12 Standard * Spare Optic).
B O22* P 13 – P 14 Standard * Spare 2. SCMS / BCU – Applicable only at Existing Substation where all signals are hardwired to SCADA as per SCMS
B O23 P 15 – P 16 Standard * Spare requirement (NO or NC).
Watchdo g K3 - K4 - M 2FP Fail U To SCM S/B CU (See No te. 7) 3. Time synchronization with GPS to be provided via IEC61850.
B I1 K17 – K18 Opto iso lated ** M 2 Co ntro l & Indic. DC Fail Lo w M 2FP C& I DC Fail A larm 4. M2RP Wiring is applicable only for Feeder with Reactor.
B I2 J1– J2 Opto iso lated ** M 1FP Fail Lo w M 1FP Fail A larm
5. This is Common template for OHL feeder, Cable Feeder & Feeder with Reactor applications.
J3 – J5 Opto iso lated **
6. If C & I DC fails then “M1FP Fail” alarm to be blocked to avoid false alarm.
B I3* CB A ux Co ntact (52a) High CB Status
7. For Existing (Old Philosophy) substation, relay watchdog to be wired directly to BCU / SCMS.
B I4* J4 – J5 Opto iso lated ** Spare
8.Trip Circuit Supervision all loops to be monitored (Not Shown) as per detailed scheme Drawing.
B I5* J6 – J5 Opto iso lated ** Spare 9. Control and Indication Circuit all loops to be monitored (Not Shown) end of the loop connected to Binary input.
B I6 J7 – J8 Opto iso lated ** CB A ux Co ntact (52b) High CB Status 10. Circuit for Watchdog Alarm should monitor failure of DC Supply.
B I7 J9 – J10 Opto iso lated ** CB Open Co mmand High Indicatio n 11. Communication port shall be secured, so as to comply with cyber security requirements.
INPUTS

B I8 J11– J12 Opto iso lated ** 50B F2 Initiate, Intertrip Send (IS4) High M 2B ZP Trip 12. Signal Description SCS prepared based on Typical signal list for DEWA -11kV132kV and 132-22kV Substation-Issue 6
B I9 P 17-P 18 Opto iso lated ** VT M CB Trip High A larm Rev.0.
B I10 N1-N2 Opto iso lated ** TC2 Fail High TC2 Fail A larm 13. Internal/Soft signals (on IEC61850 protocol) shall follow respective tender document (Typical signal List).
B I11 N3-N5 Opto iso lated ** 50B F2 Initiate, Intertrip Send (IS4) High fro m M 2RP Trip,(See No te .4) 14. This template is compatible with schematic Drawing version:2.6,2.6.1,2.6.2,2.6.3,2.6.4,2.6.5,2.6.6,2.6.7 &2.6.8.
B I12 N4-N5 Opto iso lated ** Spare
B I13 N6-N5 Opto iso lated ** Spare
B I14 N7-N8 Opto iso lated ** M anual Clo se High SOTF
B I15 N9 – N10 Opto iso lated ** Spare
B I16 N11-N12 Opto iso lated ** Spare
COMMUNICATION MODULES
Po r t - A Time Syncro nizatio n
Po r t - B System Interface-IEC61850 (to be as per SCA DA )
F r o nt Po r t Operato r (Front) Interface
Po r t - D P ro tectio n Data Interface
Note: For detail in “ Trip’ & “ 50BF” Function please refer to Prot ection SLD & Trip logic diagram.
“ U- Unlatch” , “ L- Latch” , “ High- Act ive with volt age” , “ Low - Active without volt age” .
* For single pole CB, BO20-BO22 t o be used for Trip (R,Y and B phase) respectively & BI3-BI5 to be used f or
CB 52a contact (R,Y and B phase) respect ively. 2.6.2 VP-TP 09/01/2019 Signal Description SCS added , Relay I/O table updated
2.6.1 VP-TP 12/01/2015 Additional comment from BO13 is removed
2.6 VP-TP 19/07/2012 CB Close Interlock added
2.5.1 ORG 04/02/2010 Intertrip for M1BZP, Common template for FDR
Revisions Name Date Remarks

Title : 132KV FEEDER – M2FP (7SD522) Drg. Ref. No. : TPD/DS/132/FDR/SIE-122


Prepared: VMS Checked: Venkat Approved: VP-TP Sheet No.

2 of 2

Powered by TCPDF (www.tcpdf.org)

You might also like